18 demanding questions: algebraic proof, functions, vectors, histograms, conditional probability and iteration.
🔺 Higher stretch — grade 8 and 9 topics
The top of a Higher paper is not the same content done faster — it is the statements that only appear at the top, and questions that hide two steps inside one instruction. This sheet gathers eighteen of them: algebraic proof and showing two expressions are equivalent, inverse and composite functions, transformations of graphs, the equation of a circle and its tangent, iteration, vectors used to construct a geometric argument, histograms with unequal class intervals, and conditional probability from a tree or a Venn diagram. It is deliberately hard and deliberately short. If you get half of it out, you are working where grades 8 and 9 are decided — and the worked answers are written to show the step that was actually being tested, not just the arithmetic around it.
- 1.f(x) = 2x − 1. Work out ff(x).y = 2x − 1
- 2.A number machine multiplies its input by 3 and then adds 7. The output is 1. Work out the input.
- 3.A number machine multiplies its input by 2 and then subtracts 5. Work out the output when the input is 6.
- 4.In a histogram of the times, t minutes, taken by some people to complete a task, the class 15 ≤ t < 30 contains 24 people. Work out the frequency density for this class.
- 5.The graph of y = x³ − 5x is reflected in the y-axis. Work out the equation of the image.y = x
- 6.A company has 400 employees. 150 of them work part time and 160 of them cycle to work. Working part time and cycling to work are independent. Work out how many of the employees you would expect both to work part time and to cycle to work.
- 7.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
- 8.The point (9, 40) lies on the circle x² + y² = 1681, which has centre (0, 0). Work out the equation of the tangent to the circle at (9, 40), giving your answer in the form ax + by = c.
- 9.Triangle ABC is translated by the column vector with top number 3 and bottom number −5 to form triangle A′B′C′. Triangle A′B′C′ is then translated by the column vector with top number −7 and bottom number 2 to form triangle A″B″C″. Work out the single column vector that translates triangle ABC directly to triangle A″B″C″.
- 10.A student attempts to prove that the sum of any three consecutive integers is a multiple of 3. Line 1: Let the three consecutive integers be n, n + 1 and n + 2. Line 2: Their sum is n + (n + 1) + (n + 2) = 3n + 2. Line 3: 3n + 2 leaves a remainder of 2 when divided by 3, so it is not a multiple of 3. Line 4: So the sum of three consecutive integers is not always a multiple of 3. Which line contains the FIRST error?
- 11.The graph of y = f(x) has a maximum turning point at (5, 8). Which of these correctly gives the corresponding turning point on the graph of y = −f(x + 1), and its type?
- 12.A market stall's cost of hiring n tables is modelled by two formulas: Formula A: C = 3(2n + 5); Formula B: C = 6n + 15, where C is in pounds. A stallholder says the two formulas always give the same cost. Work out the cost given by each formula when n = 4, and use your results to decide whether the stallholder is correct.
- 13.The times, t seconds, taken by 142 competitors to complete a lap are grouped like this: 0 ≤ t < 10, 20 competitors; 10 ≤ t < 25, 12 competitors; 25 ≤ t < 45, 50 competitors; 45 ≤ t < 75, 60 competitors. A histogram is drawn. Write down the class whose bar is the tallest.
- 14.n is an integer. Which of these expressions is always an even number?
- 15.A ferry company finds that on 20% of days the sea is rough. If the sea is rough, the probability that a crossing is delayed is 0.75. If the sea is calm, the probability that a crossing is delayed is 0.1. Given that a crossing was delayed, work out the probability that the sea was rough that day.
- 16.A rectangular vegetable plot has an area of 30 m² and its length is 4 m greater than its width, x metres. This gives x² + 4x − 30 = 0, which can be solved using the iterative formula xₙ₊₁ = √(30 − 4xₙ). The starting value is x₀ = 3, so x₁ is the value after the formula has been used once. Work out x₃, and use it to find an estimate for the length of the plot, giving your answer correct to 1 decimal place.
- 17.A circle has centre (0, 0) and passes through the point (5, 12). Work out the equation of the circle.
- 18.The distances, d km, cycled by 180 riders in a charity sportive are summarised by these cumulative frequencies: d < 30, 20 riders; d < 60, 60 riders; d < 80, 120 riders; d < 100, 160 riders; d < 130, 180 riders. Use interpolation to estimate the median distance cycled.
Answer key
- (c) 4x − 3 — ff(x) means f(f(x)): substitute f(x) into f in place of x. f(f(x)) = 2 × f(x) − 1 = 2 × (2x − 1) − 1. Expanding the bracket: 2 × (2x − 1) = 4x − 2. Combining the constant terms: −2 − 1 = −3, so f(f(x)) = 4x − 3. Writing 4x − 2 comes from expanding 2(2x − 1) correctly to get 4x − 2, then forgetting to subtract the outer 1 at all. Writing 4x² − 4x + 1 comes from reading ff(x) as f(x) multiplied by itself, (2x − 1)(2x − 1) = 4x² − 4x + 1, instead of substituting f(x) into f. Writing 4x − 1 comes from doubling the coefficient of x in the original rule directly, without actually substituting f(x) into f at all.
- (d) −2 — Method: run the machine backwards, undoing the operations in the opposite order and swapping each one for its inverse. Working: the machine added 7 last, so take 7 off the output: 1 − 7 = −6; before that the machine had multiplied by 3, so divide: −6 ÷ 3, and a negative divided by a positive stays negative. Answer: −2, which checks because 3 × (−2) + 7 = −6 + 7 = 1. The distractors: 2 comes from dividing 6 by 3 and losing the minus sign; −6 comes from taking the 7 off and stopping there, never undoing the multiplication; −18 comes from multiplying −6 by 3 instead of dividing by 3.
- (a) 7 — Multiply the input by 2: 6 × 2 = 12. Then subtract 5: 12 − 5 = 7. A candidate who does the operations in the wrong order, subtracting 5 first and then multiplying by 2, gets (6 − 5) × 2 = 2. A candidate who only carries out the multiplication and forgets to subtract gets 12. A candidate who adds 5 instead of subtracting gets 6 × 2 + 5 = 17.
- (a) 1.6 — Method: on a histogram the height of a bar is the frequency density, and frequency density = frequency ÷ class width. Working: the class 15 ≤ t < 30 runs from 15 to 30, so its width is 30 − 15 = 15 minutes; the frequency is 24, so the frequency density is 24 ÷ 15 = 1.6. Answer: 1.6 people per minute. The distractors: 360 comes from multiplying the frequency by the class width, 24 × 15, which uses the area rule backwards — area gives the frequency, so the frequency must be divided by the width to give the height; 0.625 comes from dividing the class width by the frequency, 15 ÷ 24, reversing the formula; 0.8 comes from dividing by the upper class boundary, 24 ÷ 30, instead of by the width of the class.
- (a) y = −x³ + 5x — Reflecting a graph in the y-axis replaces every x in the equation with −x: y = (−x)³ − 5(−x) = −x³ + 5x. Writing y = −x³ − 5x comes from substituting −x into the x³ term only and leaving the −5x term as it was. Writing y = x³ + 5x comes from substituting −x into the −5x term only and leaving the x³ term as it was. Writing y = x³ − 5x is the original equation with no reflection applied at all — every term needs the substitution, not just one of them.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (b) 9x + 40y = 1681 — For a circle x² + y² = r² centred at the origin, the tangent at a point (a, b) on the circle has equation ax + by = r². Here (a, b) = (9, 40) and r² = 1681, so the tangent is 9x + 40y = 1681. Choosing 40x + 9y = 1681 swaps the coefficients, using the y-coordinate as the x-coefficient and the x-coordinate as the y-coefficient. Choosing 9x + 40y = 41 uses the radius 41 instead of r² = 1681 as the constant. Choosing 9x − 40y = 1681 has the correct coefficients and constant but the wrong sign on the y-term.
- (d) (−4, −3) — The combined translation is the sum of the two column vectors, added component by component: top numbers 3 + (−7) = −4, bottom numbers −5 + 2 = −3, giving (−4, −3). (10, −7) subtracts the second vector from the first instead of adding them. (−4, 3) gets the top number right but makes a sign error on the bottom, treating −5 + 2 as +3. (4, −3) gets the bottom number right but makes a sign error on the top, treating 3 + (−7) as +4.
- (d) line 2 — Line 1 correctly represents three consecutive integers using n. Line 2 adds them: n + (n + 1) + (n + 2). Collecting terms: the n-terms give 3n, and the constants give 1 + 2 = 3, so the correct sum is 3n + 3, not 3n + 2 as Line 2 states — this is the first error, an arithmetic slip in collecting the constant terms. Lines 3 and 4 both follow correctly from Line 2's incorrect result, but that result itself is wrong: the true sum, 3n + 3 = 3(n + 1), is a multiple of 3 for every whole number n. Check the working of each line against what came before it, in order, rather than judging whether the final conclusion feels right — an error that flips the conclusion can sit several lines before the line that states it.
- (a) (4, −8), a minimum point — The transformation x → x + 1 inside f translates the graph 1 unit to the LEFT, so the x-coordinate becomes 5 − 1 = 4. The minus sign in front of f reflects the graph in the x-axis, so the y-coordinate becomes −8, and a reflection in the x-axis turns every maximum into a minimum, so (4, −8) is a minimum point. Writing '(4, −8), a maximum point' gets the coordinates right but forgets that a reflection in the x-axis swaps maximum and minimum points. Writing '(6, −8), a minimum point' comes from translating 1 unit to the RIGHT instead of the left — f(x + 1) always moves the graph in the negative x-direction. Writing '(4, 8), a minimum point' gets the x-coordinate and the type right, but forgets to actually negate the y-coordinate, even though it does correctly reclassify the point as a minimum.
- (d) Formula A gives £39 and Formula B gives £39, and since 3(2n + 5) expands to 6n + 15 for every value of n, the stallholder is correct. — Formula A: 3(2 × 4 + 5) = 3 × 13 = £39. Formula B: 6 × 4 + 15 = 24 + 15 = £39. Expanding Formula A algebraically gives 3(2n + 5) = 6n + 15, which is identical to Formula B for every value of n, not just n = 4, so the stallholder is correct — this is an identity, not a coincidence. The option giving £29 for Formula A comes from multiplying only the 2n by 3 and forgetting to also multiply the 5, then adding the unmultiplied 5: 3 × 2 × 4 = 24, + 5 = 29. The two options that reach the correct numbers but reject the stallholder's claim both use faulty reasoning — matching values at one value of n, or counting terms, does not decide whether two expressions are identical for every n; expanding the bracket does.
- (d) 25 ≤ t < 45 — Method: the height of a bar on a histogram is the frequency density, so work out frequency ÷ class width for every class and compare the four heights. Working: 20 ÷ 10 = 2 for the first class; 12 ÷ 15 = 0.8 for the second; 50 ÷ 20 = 2.5 for the third; 60 ÷ 30 = 2 for the fourth. Answer: the largest of 2, 0.8, 2.5 and 2 is 2.5, so the tallest bar is the one for 25 ≤ t < 45. The distractors: 45 ≤ t < 75 comes from picking the class with the greatest frequency, 60, and treating a frequency as a height — but that class is three times as wide, so its 60 competitors are spread thinly; 10 ≤ t < 25 comes from dividing the class width by the frequency, 15 ÷ 12, and picking the largest of those reversed values; 0 ≤ t < 10 comes from assuming the narrowest class must always give the tallest bar, which is only true when the frequencies are equal.
- (a) n² + n — n² + n = n(n + 1), the product of two consecutive integers. One of any two consecutive integers is always even, so their product is always even, whatever whole number n is. n² − n + 1 = n(n − 1) + 1 is always ODD, since n(n − 1) is even and adding 1 makes it odd — the opposite of what's asked. 2n + 1 is always odd by definition, not even. n² + 1 is not always even at all: it depends on whether n is odd or even, and testing n = 2 gives 5, which is odd.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (a) 7.9 m — Method: the iteration converges on the width of the plot, so run the formula three times from the starting value and then add 4 m, because the length is 4 m greater than the width. Working: x₁ = √(30 − 4 × 3) = √18 = 4.24264…; x₂ = √(30 − 4 × 4.24264…) = √13.02943… = 3.60963…; x₃ = √(30 − 4 × 3.60963…) = √15.56147… = 3.94480…. The estimate for the length is 3.94480… + 4 = 7.94480…, which is 7.9 m correct to 1 decimal place. Answer: 7.9 m. The iteration is still oscillating at x₃, so this is the estimate that three uses of the formula give, not a settled value. The distractors: 3.9 m is x₃ itself, the width, given by a candidate who runs the iteration correctly and then stops before the step the question actually asks for; 7.6 m uses x₂ in place of x₃, one use of the formula short, and then adds the 4 m correctly; 15.8 m multiplies the width by 4 instead of adding 4 m to it, reading greater than as a multiplier.
- (b) x² + y² = 169 — Method: a circle centred on the origin has equation x² + y² = r², and every point on it satisfies that equation, so substituting the coordinates of a point that lies on the circle gives r² directly. Working: substituting x = 5 and y = 12 gives 5² + 12² = 25 + 144 = 169, so r² = 169 and the circle is x² + y² = 169. Answer: x² + y² = 169. The distractors: x² + y² = 13 uses the radius, √169 = 13, where r² belongs, which is the confusion between r and r² made in the other direction; x² + y² = 17 adds the two coordinates, 5 + 12, instead of adding their squares; x² + y² = 119 subtracts the squares, 144 − 25, treating 12 as the hypotenuse of the right-angled triangle rather than as one of the shorter sides.
- (c) 70 — Method: estimate the median from the cumulative frequency table by interpolation: find its position, n ÷ 2, locate the class it falls in, then add the fraction of the way through that class (adjusted for the cumulative frequency reached before it) to the class's lower boundary. Working: there are 180 riders, so the median is at position 180 ÷ 2 = 90. Before the class 60 ≤ d < 80 the cumulative frequency is 60, and by the end of it, 120, so the 90th rider falls in this class; its frequency is 120 − 60 = 60 and its width is 80 − 60 = 20. The extra distance needed into the class is 90 − 60 = 30, and 30 ÷ 60 × 20 = 10, so the median is 60 + 10 = 70. Answer: the estimated median distance is 70 km. Watch which numbers the interpolation actually uses: reading off just the class's lower boundary, 60, ignores how far into the class the 90th rider falls; using the target position, 90, as the extra distance instead of subtracting the 60 riders already counted before the class gives 90 ÷ 60 × 20 = 30, so 60 + 30 = 90, overshooting by treating the whole position as if none of it had already been counted; and using the total number of riders, 180, instead of half of it as the target position lands in the very last class, giving an estimate of 130 km — further than any rider is known to have ridden by that point in the table.
What is on this worksheet?
The sheet holds 18 questions drawn from the MathsUK bank — the content areas covered: Algebra, Geometry and measures, Probability, Statistics (statements A6, A7, A13, A16, A20, G25, S3, P9). It is pitched at GCSE Higher and takes about 50 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 18 questions before checking — about 50 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 18 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⚗️ Ratio and proportion mastery — Higher · 24 questions · ~45 min