18 demanding questions: algebraic proof, functions, vectors, histograms, conditional probability and iteration.
🔺 Higher stretch — grade 8 and 9 topics
The top of a Higher paper is not the same content done faster — it is the statements that only appear at the top, and questions that hide two steps inside one instruction. This sheet gathers eighteen of them: algebraic proof and showing two expressions are equivalent, inverse and composite functions, transformations of graphs, the equation of a circle and its tangent, iteration, vectors used to construct a geometric argument, histograms with unequal class intervals, and conditional probability from a tree or a Venn diagram. It is deliberately hard and deliberately short. If you get half of it out, you are working where grades 8 and 9 are decided — and the worked answers are written to show the step that was actually being tested, not just the arithmetic around it.
- 1.The equation x³ + 4x − 9 = 0 is to be solved by iteration. Work out which one of these iterative formulas comes from a correct rearrangement of that equation.
- 2.A number machine multiplies its input by 2 and then subtracts 5. Work out the output when the input is 6.
- 3.Which expression is equivalent to 0.5(4x + 6) − x?
- 4.The masses, m grams, of 100 apples are grouped like this: 100 ≤ m < 120, 10 apples; 120 ≤ m < 140, 30 apples; 140 ≤ m < 160, 40 apples; 160 ≤ m < 200, 20 apples. Estimate the median mass.
- 5.A histogram shows the speeds, v mph, of 100 vehicles passing a checkpoint. The bar for 0 ≤ v < 20 has a frequency density of 1 vehicle per mph, the bar for 20 ≤ v < 30 has a frequency density of 3 vehicles per mph, the bar for 30 ≤ v < 50 has a frequency density of 2 vehicles per mph, and the bar for 50 ≤ v < 70 has a frequency density of 0.5 vehicles per mph. Estimate the mean speed of the vehicles.
- 6.The equation x² = 5x − 3 is to be solved using iteration. Work out which of these iterative formulas comes from a correct rearrangement of the equation.
- 7.The graph of y = f(x) has x-intercepts at x = −2 and x = 6 and crosses the y-axis at (0, −12). Work out the x-intercepts and the y-intercept of y = −f(x).
- 8.A company has 400 employees. 150 of them work part time and 160 of them cycle to work. Working part time and cycling to work are independent. Work out how many of the employees you would expect both to work part time and to cycle to work.
- 9.The times, t minutes, of 80 journeys are summarised by these cumulative frequencies: t < 10, 8 journeys; t < 20, 28 journeys; t < 30, 52 journeys; t < 40, 72 journeys; t < 50, 80 journeys. Estimate the interquartile range.
- 10.The times, t minutes, of 70 visits to a website are grouped into two classes: 0 ≤ t < 4, which contains 30 visits, and 4 ≤ t < 20, which contains 40 visits. A histogram is drawn. Work out how many times taller the bar for 0 ≤ t < 4 is than the bar for 4 ≤ t < 20.
- 11.A circle has centre (0, 0) and equation x² + y² = 64. Write down the radius of the circle.
- 12.A company's weekly profit, in £, is modelled by y = f(x), where x is the number of weeks since launch. The graph of y = f(x) has a maximum at (10, 45000). A rival company uses the same marketing strategy but starts trading 6 weeks later and has fixed costs £8000 higher every week, so its profit is modelled by y = f(x − 6) − 8000. In which week does the rival's maximum weekly profit occur, and what is it?
- 13.The graph of y = f(x) passes through the point (2, 5). Write down the coordinates of the corresponding point on the graph of y = f(x − 4) + 1.
- 14.A school buys pens from two suppliers and has 1000 pens in stock. Supplier X provided 70% of the pens and supplier Y provided the other 30%. 2% of supplier X's pens are faulty and 8% of supplier Y's pens are faulty. A pen picked at random from the stock is found to be faulty. Work out the probability that it came from supplier Y. Give your answer as a fraction.
- 15.The equation x² − 7 = 0 has a positive root. Let f(x) = x² − 7. Given that x₁ = 2.6 and x₂ = 2.65, work out which of these is correct.y = x² − 7
- 16.The equation x² + 2x − 5 = 0 can be solved using the iterative formula xₙ₊₁ = 5/(xₙ + 2). The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₂ correct to 2 decimal places.
- 17.m is the column vector with top number 3 and bottom number −4. Which of these column vectors is a scalar multiple of m?
- 18.Point A has coordinates (2, 5). Point A is translated to point B using the column vector with top number 6 and bottom number −3. Write down the coordinates of point B.
Answer key
- (c) xₙ₊₁ = ∛(9 − 4xₙ) — Method: a formula xₙ₊₁ = f(xₙ) is a correct rearrangement when the equation x = f(x) turns back into the equation you started with, so rearrange x³ + 4x − 9 = 0 by making the cube the subject. Working: x³ + 4x − 9 = 0 gives x³ = 9 − 4x, because the 4x and the 9 each change sign as they cross the equals sign; taking the cube root of both sides gives x = ∛(9 − 4x), which is the formula xₙ₊₁ = ∛(9 − 4xₙ). Answer: xₙ₊₁ = ∛(9 − 4xₙ). The distractors: ∛(9 + 4xₙ) comes from writing x³ = 9 + 4x, moving the 4x across the equals sign without changing its sign; (9 + xₙ³)/4 comes from making the linear term the subject but keeping the sign of the cube, writing 4x = 9 + x³ when the equation gives 4x = 9 − x³; ∛(9 − 4xₙ³) cubes the x in the linear term as well, changing a term the original equation never cubed.
- (a) 7 — Multiply the input by 2: 6 × 2 = 12. Then subtract 5: 12 − 5 = 7. A candidate who does the operations in the wrong order, subtracting 5 first and then multiplying by 2, gets (6 − 5) × 2 = 2. A candidate who only carries out the multiplication and forgets to subtract gets 12. A candidate who adds 5 instead of subtracting gets 6 × 2 + 5 = 17.
- (c) x + 3 — Expand the bracket: 0.5(4x + 6) = 2x + 3. Then subtract the x: 2x + 3 − x = x + 3. The option 2x + 3 comes from expanding the bracket correctly but then forgetting to subtract the x at all. The option x + 6 comes from forgetting to multiply the 6 inside the bracket by 0.5 (treating it as 2x + 6), then subtracting x. The option 3x + 3 comes from adding the x instead of subtracting it: 2x + 3 + x = 3x + 3.
- (c) 145 g — Method: find the position of the median from the total frequency, locate the class that contains it, then use linear interpolation inside that class, assuming the apples in it are spread evenly. Working: the median is the 100 ÷ 2 = 50th apple; the running totals are 10, then 10 + 30 = 40, then 40 + 40 = 80, so the 50th apple lies in the class 140 ≤ m < 160; it is the 50 − 40 = 10th of the 40 apples in that class, and the class is 20 g wide, so the median is 140 + (10 ÷ 40) × 20 = 140 + 5 = 145. Answer: an estimated median of 145 g. The distractors: 150 g comes from giving the midpoint of the class that contains the median instead of interpolating inside it; 140 g comes from stopping at the lower boundary of that class, which locates the class but not the value; 155 g comes from measuring the 5 g step down from the upper boundary, 160 − 5, instead of up from the lower boundary.
- (a) 31.5 — Method: to estimate the mean from a histogram, first turn each bar into a frequency (frequency density × class width), then use mean = Σ(frequency × midpoint) ÷ Σfrequency, with the midpoint standing in for every value in that class. Working: the four classes have widths 20, 10, 20 and 20, so their frequencies are 1 × 20 = 20, 3 × 10 = 30, 2 × 20 = 40 and 0.5 × 20 = 10, which do add to the 100 vehicles stated. Their midpoints are 10, 25, 40 and 60, so Σfx = 20 × 10 + 30 × 25 + 40 × 40 + 10 × 60 = 200 + 750 + 1600 + 600 = 3150, and the mean is 3150 ÷ 100 = 31.5. Answer: the estimated mean speed is 31.5 mph. Watch which numbers you treat as the frequencies and which as the values: using the frequency densities themselves as the frequencies, without multiplying by the class widths first, gives 1 × 10 + 3 × 25 + 2 × 40 + 0.5 × 60 = 195 spread over 1 + 3 + 2 + 0.5 = 6.5, and 195 ÷ 6.5 = 30, a mean built from the wrong 'frequencies' altogether; averaging the four midpoints on their own, (10 + 25 + 40 + 60) ÷ 4 = 33.75, ignores how many vehicles are actually in each class; and using each class's lower boundary in place of its midpoint, 20 × 0 + 30 × 20 + 40 × 30 + 10 × 50 = 2300 and 2300 ÷ 100 = 23, systematically underestimates every class by roughly half its width.
- (b) xₙ₊₁ = (xₙ² + 3) ÷ 5 — Starting from x² = 5x − 3, add 3 to both sides: x² + 3 = 5x. Divide both sides by 5: x = (x² + 3) ÷ 5. Writing this as an iteration gives xₙ₊₁ = (xₙ² + 3) ÷ 5. xₙ₊₁ = (xₙ² − 3) ÷ 5 comes from a sign error when moving the −3 across the equals sign — it should become +3, not stay as −3. xₙ₊₁ = 5(xₙ² + 3) comes from multiplying by 5 instead of dividing by 5 when isolating x. xₙ₊₁ = (xₙ + 3) ÷ 5 comes from dropping the index on x², using xₙ instead of xₙ².
- (d) x = −2, x = 6; y-intercept (0, 12) — Reflecting y = f(x) in the x-axis, to get y = −f(x), negates every y-value but leaves every x-value fixed. The x-intercepts happen where y = 0, and −0 = 0, so they are unaffected: y = −f(x) still crosses the x-axis at x = −2 and x = 6. The y-intercept is the value at x = 0: f(0) = −12, so −f(0) = 12, giving the point (0, 12) — the sign flips because the y-intercept is a nonzero y-value, unlike the roots. Writing 'x = 2, x = −6; y-intercept (0, −12)' comes from confusing −f(x) with f(−x) — reflecting in the y-axis instead of the x-axis, which negates the x-values of the intercepts (turning −2 into 2 and 6 into −6) but leaves f(0) unchanged, since f(−0) = f(0) = −12. Writing 'x = −2, x = 6; y-intercept (0, −12)' comes from forgetting that −f(x) is a reflection at all, and assumes both intercepts stay exactly as they were. Writing 'x = 2, x = −6; y-intercept (0, 12)' correctly negates the y-intercept but wrongly negates the x-intercepts too, as if a reflection in the x-axis also flipped the sign of every x-value.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (d) 18 minutes — Method: the lower quartile is the 80 ÷ 4 = 20th value and the upper quartile is the 3 × 80 ÷ 4 = 60th value; locate each inside its class by linear interpolation, then subtract. Working: the 20th value lies between the running totals 8 and 28, so it is in the class 10 ≤ t < 20, which holds 20 journeys across 10 minutes, and it is the 20 − 8 = 12th of them, giving 10 + (12 ÷ 20) × 10 = 16 minutes; the 60th value lies between the running totals 52 and 72, so it is in the class 30 ≤ t < 40, which also holds 20 journeys across 10 minutes, and it is the 60 − 52 = 8th of them, giving 30 + (8 ÷ 20) × 10 = 34 minutes; subtracting, 34 − 16 = 18. Answer: an estimated interquartile range of 18 minutes. The distractors: 20 minutes comes from taking the lower boundaries of the two quartile classes, 30 − 10, which locates the classes but never the values inside them; 40 minutes comes from subtracting the two positions, 60 − 20, instead of the two times; 22 minutes comes from interpolating downwards from each upper boundary rather than upwards from each lower boundary, giving 20 − 6 = 14 and 40 − 4 = 36.
- (d) 3 — Method: the height of a bar is its frequency density, frequency ÷ class width, so work out both heights and divide one by the other. Working: the class 0 ≤ t < 4 is 4 minutes wide and holds 30 visits, so its frequency density is 30 ÷ 4 = 7.5 per minute; the class 4 ≤ t < 20 is 16 minutes wide and holds 40 visits, so its frequency density is 40 ÷ 16 = 2.5 per minute; dividing the heights, 7.5 ÷ 2.5 = 3. Answer: the first bar is 3 times as tall. The distractors: 0.75 comes from comparing the frequencies, 30 ÷ 40, as though the frequencies were the heights, which is the mistake the unequal widths are there to expose; 4 comes from comparing the class widths, 16 ÷ 4, instead of the heights; 5 comes from subtracting the two frequency densities, 7.5 − 2.5, which answers how much taller rather than how many times taller.
- (b) 8 — Method: a circle centred on the origin has equation x² + y² = r², where r is the radius, so the number on the right-hand side is the square of the radius and not the radius itself. Working: comparing x² + y² = 64 with x² + y² = r² gives r² = 64, so r = √64 = 8. Answer: the radius is 8. The distractors: 64 is r² read straight off the equation as though the right-hand side were the radius, which is the commonest error on this form; 32 comes from halving 64, treating the right-hand side as a diameter that has to be halved; 16 is the diameter, 2 × 8, quoted in place of the radius.
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (d) (6, 6) — y = f(x − 4) + 1 combines two translations: the −4 inside the brackets moves the graph 4 units to the RIGHT, and the +1 outside the brackets moves it 1 unit UP. Applying both to (2, 5): add 4 to the x-coordinate 2, and add 1 to the y-coordinate 5, giving (6, 6). Moving left instead of right, as the minus sign inside the bracket might suggest, gives (−2, 6) or (−2, 4); forgetting the horizontal shift altogether and only applying the vertical one gives (2, 6).
- (b) 12/19 — Method: turn the percentages into expected frequencies out of 1000, total the faulty pens, then divide supplier Y's faulty pens by that total, because the pen picked is known to be faulty. Working: supplier X provided 700 pens and 2% of them are faulty, which is 14 pens. Supplier Y provided 300 pens and 8% of them are faulty, which is 24 pens. Altogether 38 pens are faulty, so the probability is 24/38, and dividing the numerator and the denominator by 2 gives 12/19. Answer: the probability is 12/19. The distractors: 3/10 is supplier Y's share of the stock, the answer before the faulty information is used at all; 3/125 is 24/1000, the probability that a pen is from supplier Y and faulty, which stops at the joint probability and never divides by the probability of a fault; 4/5 is 8 divided by 2 + 8, comparing the two fault rates as though the suppliers provided equal numbers of pens, so the 70 to 30 split is thrown away.
- (d) x₂ closer: f(x₂) = 0.0225, nearer to 0 — f(2.6) = 2.6² − 7 = 6.76 − 7 = −0.24, and f(2.65) = 2.65² − 7 = 7.0225 − 7 = 0.0225. The closer a value of x is to the root, the closer f(x) is to zero — regardless of sign. Since |0.0225| = 0.0225 is much smaller than |−0.24| = 0.24, x₂ = 2.65 is closer to the root. 'x₁ closer: −0.24 is the smaller value' comes from comparing the SIGNED values of f(x) rather than their distances from zero — −0.24 is indeed less than 0.0225 as a number, but that does not mean x₁ is closer to the root. 'x₁ closer: f(x₁) negative ⇒ nearer root' invents a rule that a negative f(x) means x is closer to the root; the sign of f(x) only tells you which side of the root x is on, not how close it is. 'x₂ is the exact root, since f(x₂) ≈ 0' misreads f(x₂) = 0.0225 as zero; the true root is √7 ≈ 2.6458, so f(2.65) is close to zero but not equal to it, and x₂ is an approximation, not the exact root.
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (b) (6, −8) — Method: a scalar multiple of m has the same ratio between its top and bottom numbers as m does. Working: m = (3, −4); multiplying both parts by 2 gives 2 × 3 = 6 and 2 × (−4) = −8, so (6, −8) is a scalar multiple of m. Answer: (6, −8). The vector (6, −4) needs a multiplier of 2 for the top number but only 1 for the bottom number, so it is not a multiple. The vector (−6, −8) needs a multiplier of −2 for the top number but 2 for the bottom number, so it is not a multiple. The vector (9, −8) needs a multiplier of 3 for the top number but 2 for the bottom number, so it is not a multiple.
- (a) (8, 2) — Method: translating a point by a column vector means adding the vector's top number to the x-coordinate and its bottom number to the y-coordinate. Working: x-coordinate 2 + 6 = 8; y-coordinate 5 + (−3) = 2. Answer: B = (8, 2). A candidate who ignores the negative sign and adds 3 instead of −3 gets (8, 8). A candidate who translates in the reverse direction, subtracting the vector from A instead of adding it, gets (−4, 8). A candidate who swaps the vector's top and bottom numbers before adding gets (−1, 11).
What is on this worksheet?
The sheet holds 18 questions drawn from the MathsUK bank — the content areas covered: Algebra, Geometry and measures, Probability, Statistics (statements A6, A7, A13, A16, A20, G25, S3, P9). It is pitched at GCSE Higher and takes about 50 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 18 questions before checking — about 50 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 18 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⚗️ Ratio and proportion mastery — Higher · 24 questions · ~45 min