18 demanding questions: algebraic proof, functions, vectors, histograms, conditional probability and iteration.
🔺 Higher stretch — grade 8 and 9 topics
The top of a Higher paper is not the same content done faster — it is the statements that only appear at the top, and questions that hide two steps inside one instruction. This sheet gathers eighteen of them: algebraic proof and showing two expressions are equivalent, inverse and composite functions, transformations of graphs, the equation of a circle and its tangent, iteration, vectors used to construct a geometric argument, histograms with unequal class intervals, and conditional probability from a tree or a Venn diagram. It is deliberately hard and deliberately short. If you get half of it out, you are working where grades 8 and 9 are decided — and the worked answers are written to show the step that was actually being tested, not just the arithmetic around it.
- 1.A bus company records the delay, d minutes, of 250 buses: 0 ≤ d < 2, 60 buses; 2 ≤ d < 5, 90 buses; 5 ≤ d < 10, 75 buses; 10 ≤ d < 20, 25 buses. The company refunds the fare whenever a bus is more than 8 minutes late. Estimate the number of refunds it must pay.
- 2.A factory tests components from a large batch in which 6% are defective. Two components are selected at random, and the batch is large enough that the selections can be treated as independent. Given that at least one of the two components is defective, work out the probability that both are defective.
- 3.The equation x² + 2x − 5 = 0 can be solved using the iterative formula xₙ₊₁ = 5/(xₙ + 2). The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₂ correct to 2 decimal places.
- 4.The graph of y = f(x) crosses the x-axis at x = −3 and x = 7, and crosses the y-axis at (0, 21). A second graph crosses the x-axis at x = −7 and x = 3, and crosses the y-axis at the same point, (0, 21). The second graph is y = g(x). Which of these could be the equation of g(x)?
- 5.e is the column vector with top number 5 and bottom number k. f is the column vector with top number 15 and bottom number 6. Given that f is 3 times e, work out the value of k.
- 6.A circle has centre (0, 0) and equation x² + y² = 100. Work out which one of these points lies on the circle.
- 7.A rectangular garden has width w metres and length (w + 3) metres. A gardener writes its perimeter as 2w + 3. Which statement corrects the gardener's mistake?
- 8.(2x + 3)(x + a) ≡ 2x² + 11x + 12 is an identity. Work out the value of a.
- 9.A circle has centre (0, 0) and equation x² + y² = 100. A straight line is drawn from the origin through the point P(8, 9). Work out whether P lies inside, on, or outside the circle.
- 10.A call centre finds that 40% of its calls are about billing. 35% of the calls about billing are dealt with in under five minutes. The centre takes 500 calls on Monday. Work out how many of Monday's calls you would expect to be about billing and dealt with in under five minutes.
- 11.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
- 12.The graph of y = f(x) has a minimum turning point at (4, −5). The graph of y = f(x) + a has a minimum turning point whose minimum VALUE is 2. Work out the value of a, and state the coordinates of the minimum turning point of y = f(x) + a.
- 13.The point (9, 40) lies on the circle x² + y² = 1681, which has centre (0, 0). Work out the equation of the tangent to the circle at (9, 40), giving your answer in the form ax + by = c.
- 14.Which expression is equivalent to 3(2x − 5) + 4x?
- 15.Which expression is equivalent to 0.5(4x + 6) − x?
- 16.A circle has centre (0, 0) and equation x² + y² = 50. Work out the length of the diameter of the circle, correct to 1 decimal place.
- 17.A school buys pens from two suppliers and has 1000 pens in stock. Supplier X provided 70% of the pens and supplier Y provided the other 30%. 2% of supplier X's pens are faulty and 8% of supplier Y's pens are faulty. A pen picked at random from the stock is found to be faulty. Work out the probability that it came from supplier Y. Give your answer as a fraction.
- 18.The point (18, 24) lies on the circle x² + y² = 900, which has centre (0, 0). The tangent to the circle at (18, 24) crosses the y-axis at the point Q. Work out the y-coordinate of Q.
Answer key
- (b) 55 — Method: count the classes that lie wholly above 8 minutes, then use linear interpolation for the class that 8 cuts through, assuming the delays in that class are spread evenly. Working: the class 10 ≤ d < 20 lies wholly above 8 and holds 25 buses; the value 8 lies in the class 5 ≤ d < 10, which is 5 minutes wide and holds 75 buses, and the part above 8 runs from 8 to 10, a width of 2, so the estimated share is (2 ÷ 5) × 75 = 30 buses; the estimate is 30 + 25 = 55. Answer: about 55 refunds. The distractors: 100 comes from adding the whole of the class 5 ≤ d < 10, 75 + 25, and so refunding buses only 5 minutes late; 25 comes from using only the class 10 ≤ d < 20 and ignoring the part class that 8 minutes cuts through; 70 comes from taking the part of the class from 5 up to 8 instead of from 8 up to 10, giving (3 ÷ 5) × 75 = 45 and then 45 + 25.
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (b) y = f(−x) — y = f(−x) reflects the graph of y = f(x) in the y-axis: every x-coordinate changes sign. The x-intercepts −3 and 7 become 3 and −7, matching the second graph's intercepts −7 and 3. A point already on the y-axis is unaffected, since −0 = 0, so the y-intercept (0, 21) stays exactly where it is — matching the second graph as well. y = −f(x) leaves the x-intercepts unchanged at −3 and 7, since f(x) = 0 exactly where −f(x) = 0, which does not match; it also sends the y-intercept to (0, −21), a second mismatch. y = −f(−x) does send the x-intercepts to the right places, −7 and 3, but it sends the y-intercept to (0, −21) instead of (0, 21), so it fails the second clue. y = f(x) − 4 moves every point down 4, sending the y-intercept to (0, 17) instead of (0, 21), so it fails the y-axis clue. Test each option against BOTH clues — the pair of x-intercepts and the point on the y-axis — because more than one option gets only one of the two right.
- (d) 2 — Method: if f is 3 times e, then each part of f equals 3 times the matching part of e. Working: using the bottom numbers, 6 = 3 × k, so k = 2. Answer: k = 2. A candidate who multiplies instead of dividing, working out 6 × 3, gets 18. A candidate who uses the top numbers' ratio instead, 15 ÷ 5, and gives that ratio as k gets 3. A candidate who adds instead of using the multiple relationship, working out 6 + 3, gets 9.
- (a) (6, 8) — Method: a point lies on the circle x² + y² = 100 exactly when the squares of its two coordinates add to 100, so square both coordinates of each point and add them. Working: for (6, 8), 6² + 8² = 36 + 64 = 100, which matches the right-hand side of the equation. Answer: (6, 8) lies on the circle. The distractors: (3, 4) is the 3, 4, 5 right-angled triangle recalled but never scaled up to a radius of 10, and 3² + 4² = 25, so it lies on the far smaller circle x² + y² = 25; (5, 5) has coordinates adding to 10, which compares the sum of the coordinates with the radius instead of the sum of their squares with r², and 5² + 5² = 50; (10, 10) takes each coordinate separately to equal the radius, and 10² + 10² = 200, which is twice too big.
- (a) It is 2(w + (w + 3)) = 4w + 6, not 2w + 3. — The perimeter of a rectangle is twice the width plus twice the length: 2 × w + 2 × (w + 3) = 2w + 2w + 6 = 4w + 6, so the gardener's 2w + 3 is wrong. Writing w + (w + 3) = 2w + 3 forgets to double the sides at all, only adding one width and one length once. Writing 4(w + 3) = 4w + 12 wrongly treats all four sides as equal to the length, as if the garden were a square. Writing 3w + 6 comes from doubling the length correctly but adding the width only once instead of doubling it too.
- (d) a = 4 — Expand the left-hand side: (2x + 3)(x + a) = 2x² + 2ax + 3x + 3a = 2x² + (2a + 3)x + 3a. For this to match 2x² + 11x + 12 for every value of x, the x-coefficients must be equal and the constants must be equal: 2a + 3 = 11 and 3a = 12. Both give a = 4, so a = 4. Writing a = 12 comes from the constant-term equation 3a = 12: reading it as saying a itself is 12, rather than dividing both sides by 3. Writing a = 8 comes from the x-coefficient equation 2a + 3 = 11: working out 11 − 3 = 8 correctly but then stopping, without dividing by the 2 in front of a. Writing a = −4 comes from rearranging 2a + 3 = 11 the wrong way round, as 2a = 3 − 11 = −8, which gives a = −4 instead of a = 4.
- (d) P lies outside the circle — The squared distance from the origin to P is 8² + 9² = 64 + 81 = 145, which is greater than 100, so P lies outside the circle. Choosing 'P lies inside the circle' comes from adding the coordinates directly (8 + 9 = 17) instead of squaring and adding them, and comparing 17 with 100. Choosing 'P lies on the circle' comes from squaring 9 incorrectly as 36 (as if it were 6²) instead of 81, giving 64 + 36 = 100, equal to the right-hand side. Choosing 'Cannot be determined' wrongly assumes the equation of the line itself is needed, when the radius and the distance from the origin to P are already enough.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (b) a = 7; turning point (4, 2) — A vertical translation y = f(x) + a moves every point on the graph up or down by a, so the x-coordinate of the turning point stays at 4 and the minimum value becomes −5 + a. Setting −5 + a = 2 and solving gives a = 7, so the new turning point is (4, 2). Rearranging −5 + a = 2 with a sign error, treating it as a = −5 − 2, gives a = −7 while still landing on the correct turning-point coordinates. Correctly finding a = 7 but then writing down the original turning point instead of the shifted one gives (4, −5). Assuming a is simply equal to the new minimum value itself, ignoring the original −5 entirely, gives a = 2.
- (b) 9x + 40y = 1681 — For a circle x² + y² = r² centred at the origin, the tangent at a point (a, b) on the circle has equation ax + by = r². Here (a, b) = (9, 40) and r² = 1681, so the tangent is 9x + 40y = 1681. Choosing 40x + 9y = 1681 swaps the coefficients, using the y-coordinate as the x-coefficient and the x-coordinate as the y-coefficient. Choosing 9x + 40y = 41 uses the radius 41 instead of r² = 1681 as the constant. Choosing 9x − 40y = 1681 has the correct coefficients and constant but the wrong sign on the y-term.
- (c) 10x − 15 — Expand the bracket first: 3(2x − 5) = 6x − 15. Then add the 4x: 6x − 15 + 4x = 10x − 15. The option 10x − 5 comes from forgetting to multiply the 5 inside the bracket by 3 (treating it as 6x − 5), then adding 4x. The option 10x + 15 comes from a sign error when expanding, treating 3 × (−5) as +15 instead of −15, then adding 4x. The option 6x − 15 comes from expanding the bracket correctly but forgetting to add the 4x term at all.
- (c) x + 3 — Expand the bracket: 0.5(4x + 6) = 2x + 3. Then subtract the x: 2x + 3 − x = x + 3. The option 2x + 3 comes from expanding the bracket correctly but then forgetting to subtract the x at all. The option x + 6 comes from forgetting to multiply the 6 inside the bracket by 0.5 (treating it as 2x + 6), then subtracting x. The option 3x + 3 comes from adding the x instead of subtracting it: 2x + 3 + x = 3x + 3.
- (c) 14.1 — Method: in x² + y² = r² the right-hand side is the square of the radius, so take its square root to find the radius, then double the radius because the diameter is twice the radius. Working: r² = 50, so r = √50 = 7.07106…, and the diameter is 2 × 7.07106… = 14.14213…, which is 14.1 correct to 1 decimal place. Answer: 14.1. The distractors: 7.1 is the radius, worked out correctly but never doubled, so it answers a question about the radius rather than the diameter; 100.0 comes from doubling the 50 on the right-hand side, treating r² as though it were already the radius; 25.0 comes from halving the 50, treating r² as though it were already the diameter.
- (b) 12/19 — Method: turn the percentages into expected frequencies out of 1000, total the faulty pens, then divide supplier Y's faulty pens by that total, because the pen picked is known to be faulty. Working: supplier X provided 700 pens and 2% of them are faulty, which is 14 pens. Supplier Y provided 300 pens and 8% of them are faulty, which is 24 pens. Altogether 38 pens are faulty, so the probability is 24/38, and dividing the numerator and the denominator by 2 gives 12/19. Answer: the probability is 12/19. The distractors: 3/10 is supplier Y's share of the stock, the answer before the faulty information is used at all; 3/125 is 24/1000, the probability that a pen is from supplier Y and faulty, which stops at the joint probability and never divides by the probability of a fault; 4/5 is 8 divided by 2 + 8, comparing the two fault rates as though the suppliers provided equal numbers of pens, so the 70 to 30 split is thrown away.
- (c) 37.5 — The tangent at (18, 24) is 18x + 24y = 900 (using ax + by = r² with a = 18, b = 24, r² = 900). Setting x = 0 to find the y-intercept: 24y = 900, so y = 37.5. Choosing 900 skips the division by 24 and just repeats the constant. Choosing 50 divides the constant by the x-coefficient 18 instead of the y-coefficient 24. Choosing 1.25 uses the radius 30 instead of r² = 900 as the constant before dividing.
What is on this worksheet?
The sheet holds 18 questions drawn from the MathsUK bank — the content areas covered: Algebra, Geometry and measures, Probability, Statistics (statements A6, A7, A13, A16, A20, G25, S3, P9). It is pitched at GCSE Higher and takes about 50 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 18 questions before checking — about 50 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 18 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⚗️ Ratio and proportion mastery — Higher · 24 questions · ~45 min