18 demanding questions: algebraic proof, functions, vectors, histograms, conditional probability and iteration.
🔺 Higher stretch — grade 8 and 9 topics
The top of a Higher paper is not the same content done faster — it is the statements that only appear at the top, and questions that hide two steps inside one instruction. This sheet gathers eighteen of them: algebraic proof and showing two expressions are equivalent, inverse and composite functions, transformations of graphs, the equation of a circle and its tangent, iteration, vectors used to construct a geometric argument, histograms with unequal class intervals, and conditional probability from a tree or a Venn diagram. It is deliberately hard and deliberately short. If you get half of it out, you are working where grades 8 and 9 are decided — and the worked answers are written to show the step that was actually being tested, not just the arithmetic around it.
- 1.In a histogram of the lengths, x cm, of some rods, the bar for 10 ≤ x < 30 has a frequency density of 3 per cm. The bar for 30 ≤ x < 45 is twice as tall as the bar for 10 ≤ x < 30. Work out the number of rods with a length in the class 30 ≤ x < 45.
- 2.In a histogram of the heights, h cm, of 90 seedlings, the class 12 ≤ h < 18 contains 36 seedlings. Work out the frequency density for this class.
- 3.Triangle ABC is translated by the column vector with top number 3 and bottom number −5 to form triangle A′B′C′. Triangle A′B′C′ is then translated by the column vector with top number −7 and bottom number 2 to form triangle A″B″C″. Work out the single column vector that translates triangle ABC directly to triangle A″B″C″.
- 4.A student is asked whether 3(x − 4) = 3x − 4 is an identity. Which statement gives the correct verdict and reason?
- 5.A ferry company finds that on 20% of days the sea is rough. If the sea is rough, the probability that a crossing is delayed is 0.75. If the sea is calm, the probability that a crossing is delayed is 0.1. Given that a crossing was delayed, work out the probability that the sea was rough that day.
- 6.The point A(−6, 8) lies on the circle x² + y² = 100, whose centre is the origin O. The tangent to the circle at A crosses the y-axis at the point B. Work out the length of OB.
- 7.A circle has centre (0, 0) and passes through the point (12, 35). Work out the equation of the circle.
- 8.The point (20, 21) lies on the circle x² + y² = 841, which has centre O(0, 0). The tangent to the circle at (20, 21) crosses the x-axis at P and the y-axis at Q. Work out the area of triangle OPQ, correct to 1 decimal place.
- 9.A student says that (x + 4)² is equivalent to x² + 16. For which value of x do the two expressions give the SAME result, making it look (misleadingly) like the student could be right?
- 10.The graph of y = f(x) has a minimum point at (4, −1). Write down the coordinates of the corresponding turning point on the graph of y = −f(x).
- 11.The point (9, 40) lies on the circle x² + y² = 1681, which has centre (0, 0). Work out the equation of the tangent to the circle at (9, 40), giving your answer in the form ax + by = c.
- 12.The equation x³ − 5x − 3 = 0 can be rearranged to give an iterative formula of the form xₙ₊₁ = ∛(…). Work out which one of these is a correct rearrangement.
- 13.Which of these is an identity?
- 14.The equation x² − 5x − 2 = 0 can be solved using the iterative formula xₙ₊₁ = √(5xₙ + 2). The starting value is x₀ = 2, so x₁ is the value after the formula has been used once. Work out x₃ correct to 3 decimal places.
- 15.In a certain town, P(rain on Monday) = 0.3. If it rains on Monday, the probability that it also rains on Tuesday is 0.6. If it does not rain on Monday, the probability that it rains on Tuesday is 0.25. Work out the probability that it rains on Tuesday.
- 16.The graph of y = f(x) has a minimum turning point at (2, −3). The graph of y = −f(x) + a has a maximum turning point at (2, 9). Work out the value of a.
- 17.Two expressions are 4(x + 3) and 4x + 3. A student checks whether they are equivalent by substituting x = 2. Which statement correctly interprets the result?
- 18.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
Answer key
- (c) 90 — Method: the height of a bar is its frequency density, so twice as tall means twice the frequency density — not twice the frequency, because the two classes have different widths. Then frequency = frequency density × class width. Working: the first bar has frequency density 3 per cm, so the second has frequency density 2 × 3 = 6 per cm; the class 30 ≤ x < 45 is 45 − 30 = 15 cm wide, so its frequency is 6 × 15 = 90. Answer: 90 rods. The distractors: 120 comes from doubling the first bar's frequency instead of its height — the first class holds 3 × 20 = 60 rods, and doubling that ignores the fact that the second class is narrower; 45 comes from using the first bar's frequency density, 3, for the second bar, 3 × 15, and so never using the information that it is twice as tall; 6 comes from stopping at the frequency density of the taller bar and quoting a height as though it were a count.
- (b) 6 — Method: frequency density = frequency ÷ class width. Working: the class 12 ≤ h < 18 has width 18 − 12 = 6, so frequency density = 36 ÷ 6 = 6. Answer: the frequency density is 6 seedlings per cm. Watch which numbers you use: taking the lower bound, 12, as the width instead of 18 − 12 = 6 gives 36 ÷ 12 = 3; dividing the total number of seedlings, 90, rather than this class's frequency, 36, by the width gives 90 ÷ 6 = 15, a density that belongs to no single class; and multiplying instead of dividing gives 36 × 6 = 216, far too large a density for so narrow a class.
- (d) (−4, −3) — The combined translation is the sum of the two column vectors, added component by component: top numbers 3 + (−7) = −4, bottom numbers −5 + 2 = −3, giving (−4, −3). (10, −7) subtracts the second vector from the first instead of adding them. (−4, 3) gets the top number right but makes a sign error on the bottom, treating −5 + 2 as +3. (4, −3) gets the bottom number right but makes a sign error on the top, treating 3 + (−7) as +4.
- (b) It is not even an ordinary equation with a solution: expanding the left-hand side gives 3x − 12, and 3x − 12 = 3x − 4 would require −12 = −4, which is never true. — Expanding the left-hand side, 3(x − 4) = 3x − 12. Setting this equal to the right-hand side, 3x − 12 = 3x − 4, gives −12 = −4 once the 3x terms are removed from both sides — a statement that is never true, so no value of x satisfies the equation at all, and it is certainly not an identity. The option about substituting a specific value misunderstands algebraic expansion, which holds for every x, not one chosen value. The option matching the first term wrongly assumes that is enough to prove equivalence. The option about multiplying the 4 by 3 on both sides is nonsensical, since there is only one bracket to expand, on the left-hand side.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (a) 12.5 — Method: the tangent at A is perpendicular to the radius OA, so find the gradient of OA, take its negative reciprocal, write the equation of the tangent and find where it meets the y-axis; the length of OB is then the distance of that crossing from the origin. Working: OA runs from (0, 0) to (−6, 8), so its gradient is 8 ÷ (−6), which cancels to −4/3; the negative reciprocal of −4/3 is 3/4. Substituting into y − 8 = 3/4(x + 6) gives y = 0.75x + 4.5 + 8, so y = 0.75x + 12.5 and B is (0, 12.5). The length OB is therefore 12.5. Answer: 12.5. The distractors: 10 is the radius of the circle, quoted on the assumption that the tangent always meets an axis one radius from the centre, which is only true when the radius itself lies along that axis; 8 is the y-coordinate of A, quoted by treating the tangent as horizontal so that it keeps the height of A; 3.5 comes from turning the gradient of OA upside down without changing its sign, which gives y = −0.75x + 3.5.
- (b) x² + y² = 1369 — For a circle centred at the origin, the radius squared equals the sum of the squares of the coordinates of any point on it: r² = 12² + 35² = 144 + 1225 = 1369. The equation is x² + y² = 1369. x² + y² = 2209 comes from adding the coordinates first and then squaring the sum: (12 + 35)² = 47² = 2209, instead of squaring each coordinate separately. x² + y² = 1225 comes from using only 35² and leaving out the 12² term. x² + y² = 144 comes from using only 12² and leaving out the 35² term.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (c) x = 0 — Expand (x + 4)² correctly: (x + 4)² = x² + 8x + 16. This equals x² + 16 only when 8x is zero, i.e. when x = 0 — at every other value of x the two expressions differ by 8x. Choosing x = 4 confuses the constant inside the bracket with the value of x that makes the expressions match. Choosing x = −4 makes the same confusion but with the sign flipped. Choosing x = 8 mistakes the coefficient of the middle term, 8x, for the value of x itself.
- (a) (4, 1) — y = −f(x) reflects the graph of y = f(x) in the x-axis: every point (x, y) maps to (x, −y). Applying this to (4, −1): the x-coordinate stays 4, and the y-coordinate −1 becomes its negative, 1. Leaving the y-coordinate unchanged skips the reflection entirely, giving (4, −1); reflecting the x-coordinate instead, or reflecting both, mixes this up with a reflection in the y-axis or a rotation, giving (−4, −1) or (−4, 1).
- (b) 9x + 40y = 1681 — For a circle x² + y² = r² centred at the origin, the tangent at a point (a, b) on the circle has equation ax + by = r². Here (a, b) = (9, 40) and r² = 1681, so the tangent is 9x + 40y = 1681. Choosing 40x + 9y = 1681 swaps the coefficients, using the y-coordinate as the x-coefficient and the x-coordinate as the y-coefficient. Choosing 9x + 40y = 41 uses the radius 41 instead of r² = 1681 as the constant. Choosing 9x − 40y = 1681 has the correct coefficients and constant but the wrong sign on the y-term.
- (a) xₙ₊₁ = ∛(5xₙ + 3) — Starting from x³ − 5x − 3 = 0, add 5x and 3 to both sides to get x³ = 5x + 3, then take the cube root of both sides: x = ∛(5x + 3), giving the iterative formula xₙ₊₁ = ∛(5xₙ + 3). A sign error when moving the constant term across, treating x³ − 5x − 3 = 0 as x³ = 5x − 3, gives xₙ₊₁ = ∛(5xₙ − 3). Swapping the coefficient of x with the constant term gives xₙ₊₁ = ∛(3xₙ + 5), which does not come from x³ = 5x + 3 at all. Treating cubing as meaning multiply by 3 rather than raise to the power 3, and so undoing it by dividing by 3 instead of taking a cube root, gives xₙ₊₁ = (5xₙ + 3) ÷ 3.
- (a) 2(3x + 1) = 6x + 2 — Expanding 2(3x + 1) = 6x + 2 gives an expression that matches the right-hand side exactly for every value of x — it is an identity. 4x − 3 = 3x + 5 is an ordinary equation with one solution, x = 8. 7 − x = x − 7 is also an ordinary equation with one solution, x = 7. 5x + 1 = 5(x + 1) never holds for any value of x at all, since expanding the right-hand side gives 5x + 5, and 5x + 1 = 5x + 5 would require 1 = 5, which is impossible.
- (a) 4.897 — Method: substitute the starting value into the right-hand side of the formula to get x₁, then feed each new value back in, keeping the whole calculator display every time and rounding only at the very end. Working: x₁ = √(5 × 2 + 2) = √12 = 3.46410…; x₂ = √(5 × 3.46410… + 2) = √19.32050… = 4.39551…; x₃ = √(5 × 4.39551… + 2) = √23.97755… = 4.89668…, which is 4.897 correct to 3 decimal places. Answer: 4.897. The distractors: 4.396 is x₂, written down by a candidate who counts the starting value x₀ as the first iterate and so stops one use of the formula early; 3.464 is x₁, the value after using the formula only once; 5.146 is x₄, one use of the formula too many — the mirror image of the first slip, made by a candidate who labels the first value worked out as x₀ rather than as x₁ and so runs the count a step long.
- (b) 0.355 — Method: use the law of total probability across the two Monday branches: P(rain Tue) = P(rain Mon) × P(rain Tue | rain Mon) + P(no rain Mon) × P(rain Tue | no rain Mon). Working: P(no rain Mon) = 1 − 0.3 = 0.7. P(rain Tue) = (0.3 × 0.6) + (0.7 × 0.25) = 0.18 + 0.175 = 0.355. Answer: 0.355. Watch out: using only the rain-Monday branch (0.3 × 0.6) or only the no-rain-Monday branch (0.7 × 0.25) accounts for just one of the two ways Tuesday can turn out rainy — both branches must be added. And swapping which weekday-probability multiplies which branch (0.7 with the rain branch, 0.3 with the no-rain branch) uses the right numbers on the wrong branches.
- (b) 6 — Reflecting y = f(x) in the x-axis turns the minimum point (2, −3) into a maximum point at (2, 3), since −f(x) negates every y-value: −(−3) = 3. Adding a then gives 3 + a = 9, so a = 9 − 3 = 6. Forgetting the reflection and using the original y-value of −3 gives −3 + a = 9, so a = 12 — this ignores that −f(x) changes the sign of the y-coordinate before a is added. Writing a = −12 comes from subtracting in the wrong order, working out 9 − (−3) as −3 − 9 instead. Writing a = −6 comes from taking the negative of the correct answer, as if the final value of a needed to be reflected too, on top of the turning point.
- (a) 4(x + 3) = 20 and 4x + 3 = 11 when x = 2, so the two expressions are not equivalent, because the bracket means the 3 must be added before multiplying by 4. — Substituting x = 2: 4(x + 3) = 4 × 5 = 20, and 4x + 3 = 8 + 3 = 11. The two values are different, and expanding 4(x + 3) algebraically gives 4x + 12, which can never equal 4x + 3 (that would require 12 = 3) — so the two expressions are never equivalent, for any value of x. The option claiming they become equal for a larger x is wrong: 4x + 12 = 4x + 3 has no solution at all. The option claiming they are equivalent because they share the terms 4x and 3 ignores that the bracket changes the constant term. The option that calculates 4(x + 3) as 11 ignores the bracket completely, applying the 4 only to the x term.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
What is on this worksheet?
The sheet holds 18 questions drawn from the MathsUK bank — the content areas covered: Algebra, Geometry and measures, Probability, Statistics (statements A6, A7, A13, A16, A20, G25, S3, P9). It is pitched at GCSE Higher and takes about 50 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 18 questions before checking — about 50 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 18 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⚗️ Ratio and proportion mastery — Higher · 24 questions · ~45 min