18 demanding questions: algebraic proof, functions, vectors, histograms, conditional probability and iteration.
🔺 Higher stretch — grade 8 and 9 topics
The top of a Higher paper is not the same content done faster — it is the statements that only appear at the top, and questions that hide two steps inside one instruction. This sheet gathers eighteen of them: algebraic proof and showing two expressions are equivalent, inverse and composite functions, transformations of graphs, the equation of a circle and its tangent, iteration, vectors used to construct a geometric argument, histograms with unequal class intervals, and conditional probability from a tree or a Venn diagram. It is deliberately hard and deliberately short. If you get half of it out, you are working where grades 8 and 9 are decided — and the worked answers are written to show the step that was actually being tested, not just the arithmetic around it.
- 1.A factory makes bolts on two machines. Machine A makes 60% of the bolts and machine B makes the other 40%. 5% of the bolts made by machine A are faulty and 10% of the bolts made by machine B are faulty. A bolt is picked at random from one day's production. Work out the probability that it was made by machine B and is faulty. Give your answer as a decimal.
- 2.A rule turns each input x into an output y. An input of 1 gives an output of 1, an input of 2 gives an output of 4 and an input of 3 gives an output of 9. Work out the rule.
- 3.In triangle OAB, OA = a and OB = b. M is the midpoint of OA, and N is the midpoint of OB. Express the vector MN in terms of a and b.
- 4.A student says that (x + 4)² is equivalent to x² + 16. For which value of x do the two expressions give the SAME result, making it look (misleadingly) like the student could be right?
- 5.A proof that (n + 3)² − (n − 3)² is always a multiple of a certain number begins: Line 1: (n + 3)² − (n − 3)² = (n² + 6n + 9) − (n² − 6n + 9). Which expression correctly completes Line 2?
- 6.A taxi firm charges a fixed fee of £3.50 plus £2.20 per mile. Work out the total cost of a journey of 6 miles.
- 7.OAB is a triangle, with OA = a and OB = b. E lies on OA produced beyond A, such that A is the midpoint of OE. F lies on AB such that FB is twice AF. G is the midpoint of OB. By finding the vectors EF and EG, show that E, F and G are collinear, and give the scalar k such that EF = k × EG.
- 8.The equation x² − x − 6 = 0 has roots x = 3 and x = −2. It can be rearranged as xₙ₊₁ = xₙ² − 6. This formula is used with starting value x₀ = 2.9, close to the root x = 3. Work out what happens to the sequence of values as n increases.
- 9.A student claims: 'For every positive integer n, n² + n + 1 is a prime number.' Which value of n shows that this claim is false?
- 10.The point A(−6, 8) lies on the circle x² + y² = 100, whose centre is the origin O. The tangent to the circle at A crosses the y-axis at the point B. Work out the length of OB.
- 11.The graph of y = f(x) passes through the point (0, 4). Work out the y-coordinate of the point where the graph of y = f(x) − 6 crosses the y-axis.
- 12.A circle has centre (0, 0) and equation x² + y² = 50. Work out the length of the diameter of the circle, correct to 1 decimal place.
- 13.p is the column vector with top number 2 and bottom number 3. q is the column vector with top number −1 and bottom number 4. Work out 2p + q, giving your answer as a column vector in the form (top, bottom).
- 14.A designer enlarges a drawing of a model car for a poster. She first enlarges the drawing by a scale factor of 1.5, and then enlarges that result by a further scale factor of 2. On the original drawing, the position of a wheel relative to the front bumper is given by the column vector with top number 4 and bottom number −3, in centimetres. What is the corresponding column vector on the poster, in centimetres?
- 15.The equation x² − 5x − 2 = 0 can be solved using the iterative formula xₙ₊₁ = √(5xₙ + 2). The starting value is x₀ = 2, so x₁ is the value after the formula has been used once. Work out x₃ correct to 3 decimal places.
- 16.The point (20, 21) lies on the circle x² + y² = 841, which has centre O(0, 0). The tangent to the circle at (20, 21) crosses the x-axis at P and the y-axis at Q. Work out the area of triangle OPQ, correct to 1 decimal place.
- 17.f(x) = x + 3 and g(x) = 2x. Work out fg(x).y = x + 3
- 18.A scientist has grouped the lifetimes, in hours, of 300 batteries into classes of unequal width. She wants a diagram in which the number of batteries in a class is given by the area of its bar. Write down the type of diagram she should draw.
Answer key
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (c) y = x² — Method: test a candidate rule against every pair given, not just one — a rule that fits one pair and fails another is not the rule. Working: the outputs 1, 4, 9 rise by 3 and then by 5, so they are not going up in equal steps and the input is not simply multiplied by a fixed number; comparing each output with its own input gives 1 × 1 = 1, 2 × 2 = 4 and 3 × 3 = 9, and all three pairs fit. Answer: y = x². The distractors: y = 3x comes from fitting only the last pair, where 3 × 3 = 9, and reading that 3 as a multiplier; y = 3x − 2 comes from assuming a multiply-then-add rule and using the first step in the outputs, 4 − 1 = 3, as the multiplier — it fits the first two pairs and fails the third; y = 2x comes from fitting only the pair 2 and 4 and reading every output as double its input.
- (b) (1/2)b − (1/2)a — Method: MN runs from M to N, so MN = ON − OM, with OM = (1/2)a and ON = (1/2)b. Working: MN = (1/2)b − (1/2)a. Answer: MN = (1/2)b − (1/2)a. Subtracting the other way round gives (1/2)a − (1/2)b, the reverse vector from N to M; subtracting the wrong way round AND forgetting to halve gives a − b, which is BA, not MN; and adding the two halved vectors instead of subtracting them gives (1/2)a + (1/2)b, which is the position vector of the midpoint of AB. Always subtract the START point's vector from the END point's vector, and halve OA and OB before you combine them, not after.
- (c) x = 0 — Expand (x + 4)² correctly: (x + 4)² = x² + 8x + 16. This equals x² + 16 only when 8x is zero, i.e. when x = 0 — at every other value of x the two expressions differ by 8x. Choosing x = 4 confuses the constant inside the bracket with the value of x that makes the expressions match. Choosing x = −4 makes the same confusion but with the sign flipped. Choosing x = 8 mistakes the coefficient of the middle term, 8x, for the value of x itself.
- (b) 12n — Distributing the minus sign across the second bracket gives n² + 6n + 9 − n² + 6n − 9, and the n² terms and the +9/−9 cancel, leaving 6n + 6n = 12n. Writing 18 comes from only negating the first term of the second bracket, n², and treating the −6n and +9 as unchanged, which gives n² + 6n + 9 − n² − 6n + 9 = 18. Writing 2n² + 18 comes from adding the two brackets instead of subtracting them, (n² + 6n + 9) + (n² − 6n + 9) = 2n² + 18. Writing 6n comes from correctly negating the bracket but then only counting one of the two 6n terms, missing that they add rather than cancel.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (d) 2/3 — Method: since A is the midpoint of OE, OE = 2a, so E = 2a. Since FB is twice AF, F is 1/3 of the way along AB from A, so F = a + 1/3(b − a) = (2/3)a + (1/3)b. G is the midpoint of OB, so G = (1/2)b. Working: EF = F − E = (2/3)a + (1/3)b − 2a = −(4/3)a + (1/3)b, and EG = G − E = −2a + (1/2)b. Comparing term by term, 2/3 × (−2a + (1/2)b) = −(4/3)a + (1/3)b, which matches EF exactly — the same scalar works on both the a-term and the b-term, so the two vectors are parallel, and since they share the point E the three points are collinear. Answer: k = 2/3, so E, F and G lie on a straight line. Giving 1/3 instead is the scalar linking F to G (FG = (1/3)EG), not E to F; giving 3/2 is the reciprocal — it is EG that equals 3/2 × EF, not the other way round, since EF = k × EG was what was asked for; and giving 4/3 is EF's a-coefficient read off raw, without ever dividing it by EG's a-coefficient to form the comparison. Always match the direction of the scalar to the vectors exactly as the question states them.
- (c) The sequence diverges, moving away from x = 3 — Starting from x₀ = 2.9: x₁ = 2.9² − 6 = 2.41, x₂ = 2.41² − 6 = −0.19, x₃ = (−0.19)² − 6 = −5.96, x₄ = (−5.96)² − 6 = 29.56 — the values swing away from 3 and grow rapidly, so the sequence diverges rather than settling anywhere. Choosing 'settles towards x = 3' assumes that starting close to a root is enough for a rearrangement to converge to it, which is not always true — this rearrangement changes values too steeply near x = 3 to stay there. Choosing 'settles towards x = −2' assumes a diverging sequence must eventually land on the other root; instead it runs away to increasingly large values. Choosing 'stays constant at 2.9' ignores that applying the formula changes the value at every step.
- (c) n = 4 — Testing n = 4: 4² = 16, and 16 + 4 + 1 = 21, and 21 = 3 × 7 is not a prime number, so this value disproves the claim. Testing n = 1: 1² = 1, and 1 + 1 + 1 = 3, which is prime, so it does not disprove the claim. Testing n = 2: 2² = 4, and 4 + 2 + 1 = 7, which is prime. Testing n = 3: 3² = 9, and 9 + 3 + 1 = 13, which is also prime — a counterexample has to give a result that isn't prime, and only n = 4 does that.
- (a) 12.5 — Method: the tangent at A is perpendicular to the radius OA, so find the gradient of OA, take its negative reciprocal, write the equation of the tangent and find where it meets the y-axis; the length of OB is then the distance of that crossing from the origin. Working: OA runs from (0, 0) to (−6, 8), so its gradient is 8 ÷ (−6), which cancels to −4/3; the negative reciprocal of −4/3 is 3/4. Substituting into y − 8 = 3/4(x + 6) gives y = 0.75x + 4.5 + 8, so y = 0.75x + 12.5 and B is (0, 12.5). The length OB is therefore 12.5. Answer: 12.5. The distractors: 10 is the radius of the circle, quoted on the assumption that the tangent always meets an axis one radius from the centre, which is only true when the radius itself lies along that axis; 8 is the y-coordinate of A, quoted by treating the tangent as horizontal so that it keeps the height of A; 3.5 comes from turning the gradient of OA upside down without changing its sign, which gives y = −0.75x + 3.5.
- (d) −2 — y = f(x) − 6 is f(x) shifted down by 6, so every y-value on the graph decreases by 6. At x = 0, f(0) = 4, so the new y-value is 4 − 6 = −2. Adding 6 instead of subtracting gives 10; writing down the shift itself, −6, or leaving the original value 4 unchanged both skip the translation altogether.
- (c) 14.1 — Method: in x² + y² = r² the right-hand side is the square of the radius, so take its square root to find the radius, then double the radius because the diameter is twice the radius. Working: r² = 50, so r = √50 = 7.07106…, and the diameter is 2 × 7.07106… = 14.14213…, which is 14.1 correct to 1 decimal place. Answer: 14.1. The distractors: 7.1 is the radius, worked out correctly but never doubled, so it answers a question about the radius rather than the diameter; 100.0 comes from doubling the 50 on the right-hand side, treating r² as though it were already the radius; 25.0 comes from halving the 50, treating r² as though it were already the diameter.
- (b) (3, 10) — Method: multiply every part of p by 2, then add the matching parts of q. Working: 2p = (4, 6); adding q gives top 4 + (−1) = 3 and bottom 6 + 4 = 10. Answer: 2p + q = (3, 10). A candidate who forgets to double p first, working out p + q instead, gets (1, 7). A candidate who doubles q instead of p, working out p + 2q, gets (0, 11). A candidate who subtracts q instead of adding it, working out 2p − q, gets (5, 2).
- (b) (12, −9) — Two enlargements one after the other combine into a single scale factor: 1.5 × 2 = 3. Multiplying a vector by a scalar means multiplying both the top number and the bottom number by it: top = 4 × 3 = 12, bottom = −3 × 3 = −9, giving (12, −9). A candidate who adds the scale factor to each number instead of multiplying gets (4 + 3, −3 + 3) = (7, 0). A candidate who multiplies the top number but leaves the bottom number unchanged gets (12, −3). A candidate who multiplies the bottom number but leaves the top number unchanged gets (4, −9). The correct column vector for the poster is (12, −9).
- (a) 4.897 — Method: substitute the starting value into the right-hand side of the formula to get x₁, then feed each new value back in, keeping the whole calculator display every time and rounding only at the very end. Working: x₁ = √(5 × 2 + 2) = √12 = 3.46410…; x₂ = √(5 × 3.46410… + 2) = √19.32050… = 4.39551…; x₃ = √(5 × 4.39551… + 2) = √23.97755… = 4.89668…, which is 4.897 correct to 3 decimal places. Answer: 4.897. The distractors: 4.396 is x₂, written down by a candidate who counts the starting value x₀ as the first iterate and so stops one use of the formula early; 3.464 is x₁, the value after using the formula only once; 5.146 is x₄, one use of the formula too many — the mirror image of the first slip, made by a candidate who labels the first value worked out as x₀ rather than as x₁ and so runs the count a step long.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (b) 2x + 3 — fg(x) means f(g(x)): apply g first, then apply f to the result. g(x) = 2x, so f(g(x)) = f(2x) = 2x + 3. Writing 2x + 6 comes from working out gf(x) instead — g(f(x)) = g(x + 3) = 2(x + 3) = 2x + 6 — which applies the functions in the wrong order. Writing 3x + 3 comes from adding f(x) and g(x) together, (x + 3) + 2x = 3x + 3, instead of composing them. Writing 2x² + 6x comes from multiplying f(x) and g(x) together, (x + 3)(2x) = 2x² + 6x, instead of substituting one into the other.
- (c) A histogram, with frequency density up the vertical axis — Method: decide which diagram makes area stand for frequency, which is the property the question asks for. Working: on a histogram the vertical axis is frequency density, so the area of a bar is frequency density × class width, and that product is the frequency; this is exactly what is wanted, and it is what allows classes of unequal width to be shown fairly. Answer: a histogram, with frequency density up the vertical axis. The distractors: a bar chart plots frequency as the height, so with unequal widths a wide class would cover far more area than a narrow class holding the same number of batteries, and area would measure nothing; a cumulative frequency diagram plots running totals against upper class boundaries, so a point on it gives how many lie below a value rather than how many lie in a class; a pie chart shows each class as a share of the whole 300 and loses the class widths entirely, so no area on it is tied to a scale of hours.
What is on this worksheet?
The sheet holds 18 questions drawn from the MathsUK bank — the content areas covered: Algebra, Geometry and measures, Probability, Statistics (statements A6, A7, A13, A16, A20, G25, S3, P9). It is pitched at GCSE Higher and takes about 50 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 18 questions before checking — about 50 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 18 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⚗️ Ratio and proportion mastery — Higher · 24 questions · ~45 min