18 demanding questions: algebraic proof, functions, vectors, histograms, conditional probability and iteration.
🔺 Higher stretch — grade 8 and 9 topics
The top of a Higher paper is not the same content done faster — it is the statements that only appear at the top, and questions that hide two steps inside one instruction. This sheet gathers eighteen of them: algebraic proof and showing two expressions are equivalent, inverse and composite functions, transformations of graphs, the equation of a circle and its tangent, iteration, vectors used to construct a geometric argument, histograms with unequal class intervals, and conditional probability from a tree or a Venn diagram. It is deliberately hard and deliberately short. If you get half of it out, you are working where grades 8 and 9 are decided — and the worked answers are written to show the step that was actually being tested, not just the arithmetic around it.
- 1.A factory tests components from a large batch in which 6% are defective. Two components are selected at random, and the batch is large enough that the selections can be treated as independent. Given that at least one of the two components is defective, work out the probability that both are defective.
- 2.The equation x² − 5x − 2 = 0 can be solved using the iterative formula xₙ₊₁ = √(5xₙ + 2). The starting value is x₀ = 2, so x₁ is the value after the formula has been used once. Work out x₃ correct to 3 decimal places.
- 3.The graph of y = f(x) has a root (an x-intercept) at x = 5. Work out the x-coordinate of the corresponding root on the graph of y = f(x + 2).
- 4.A circle has centre (0, 0) and passes through the point (12, 35). Work out the equation of the circle.
- 5.Triangle ABC is translated by the column vector with top number 3 and bottom number −5 to form triangle A′B′C′. Triangle A′B′C′ is then translated by the column vector with top number −7 and bottom number 2 to form triangle A″B″C″. Work out the single column vector that translates triangle ABC directly to triangle A″B″C″.
- 6.The graph of y = f(x) has a minimum turning point at (3, 2). Write down the coordinates of the minimum turning point of the graph of y = f(x) + 5.
- 7.A company has 400 employees. 150 of them work part time and 160 of them cycle to work. Working part time and cycling to work are independent. Work out how many of the employees you would expect both to work part time and to cycle to work.
- 8.A market stall's cost of hiring n tables is modelled by two formulas: Formula A: C = 3(2n + 5); Formula B: C = 6n + 15, where C is in pounds. A stallholder says the two formulas always give the same cost. Work out the cost given by each formula when n = 4, and use your results to decide whether the stallholder is correct.
- 9.The times, t minutes, taken by 120 runners to finish a fun run are summarised by these cumulative frequencies: t < 20, 8 runners; t < 30, 26 runners; t < 40, 74 runners; t < 50, 110 runners; t < 60, 120 runners. Work out the number of runners who took 40 minutes or longer to finish.
- 10.A bead starts at position (2, −1) on a grid, in centimetres. It is moved by the column vector u, with top number 3 and bottom number 5, and then moved by the column vector v, with top number −7 and bottom number 2. Work out the coordinates of the bead's final position.
- 11.Marta is drawing a cumulative frequency diagram for the times, t seconds, of 100 telephone calls. The grouped frequencies are: 0 ≤ t < 10, 7 calls; 10 ≤ t < 20, 19 calls; 20 ≤ t < 30, 34 calls; 30 ≤ t < 40, 40 calls. Write down the coordinates of the point Marta should plot for the class 20 ≤ t < 30.
- 12.f(x) = 2x + 1. Work out the value of x for which f⁻¹(x) = 5.y = 2x + 1
- 13.At a garden centre, 3/5 of the plants for sale are perennials. 1/4 of the perennials are in flower. Work out the probability that a plant picked at random from the garden centre is a perennial and is in flower.
- 14.A gym draws a histogram of the times, t minutes, that its members spend on one machine. The bar for 0 ≤ t < 10 has a frequency density of 1.8 per minute, the bar for 10 ≤ t < 25 has a frequency density of 3.2 per minute, and the bar for 25 ≤ t < 55 has a frequency density of 0.9 per minute. Members who spend 10 minutes or more on the machine pay an extra charge. Work out the number of members who pay the extra charge.
- 15.a is the column vector with top number 3 and bottom number −2. b is the column vector with top number −1 and bottom number 5. Work out 2a + b, giving your answer as a column vector in the form (top, bottom).
- 16.The graph of y = sin x is reflected in the x-axis to give the graph of y = g(x). Work out the value of g(90), where x is measured in degrees.y = sin(x)
- 17.The graph of y = f(x) passes through the point (2, 7). The graph of y = f(x) + a passes through the point (2, 3). Work out the value of a.
- 18.A rectangular sheet of metal measures 20 cm by 12 cm. A square of side x cm is cut from each corner and the sides are folded up to make an open box of volume 200 cm³. This gives x³ − 16x² + 60x − 50 = 0, which can be solved using the iterative formula xₙ₊₁ = (16xₙ² − xₙ³ + 50)/60. The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₃, and use it to find the longer side of the base of the box correct to 1 decimal place.
Answer key
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
- (a) 4.897 — Method: substitute the starting value into the right-hand side of the formula to get x₁, then feed each new value back in, keeping the whole calculator display every time and rounding only at the very end. Working: x₁ = √(5 × 2 + 2) = √12 = 3.46410…; x₂ = √(5 × 3.46410… + 2) = √19.32050… = 4.39551…; x₃ = √(5 × 4.39551… + 2) = √23.97755… = 4.89668…, which is 4.897 correct to 3 decimal places. Answer: 4.897. The distractors: 4.396 is x₂, written down by a candidate who counts the starting value x₀ as the first iterate and so stops one use of the formula early; 3.464 is x₁, the value after using the formula only once; 5.146 is x₄, one use of the formula too many — the mirror image of the first slip, made by a candidate who labels the first value worked out as x₀ rather than as x₁ and so runs the count a step long.
- (a) 3 — y = f(x + 2) is f(x) translated 2 units to the LEFT (inside the bracket, adding moves the graph in the negative x-direction). The root moves with the whole graph: 5 − 2 = 3. Moving right instead of left gives 7; assuming a bracket shift leaves the root unchanged gives 5; writing down the shift amount 2 itself skips the translation altogether.
- (b) x² + y² = 1369 — For a circle centred at the origin, the radius squared equals the sum of the squares of the coordinates of any point on it: r² = 12² + 35² = 144 + 1225 = 1369. The equation is x² + y² = 1369. x² + y² = 2209 comes from adding the coordinates first and then squaring the sum: (12 + 35)² = 47² = 2209, instead of squaring each coordinate separately. x² + y² = 1225 comes from using only 35² and leaving out the 12² term. x² + y² = 144 comes from using only 12² and leaving out the 35² term.
- (d) (−4, −3) — The combined translation is the sum of the two column vectors, added component by component: top numbers 3 + (−7) = −4, bottom numbers −5 + 2 = −3, giving (−4, −3). (10, −7) subtracts the second vector from the first instead of adding them. (−4, 3) gets the top number right but makes a sign error on the bottom, treating −5 + 2 as +3. (4, −3) gets the bottom number right but makes a sign error on the top, treating 3 + (−7) as +4.
- (a) (3, 7) — y = f(x) + 5 is a vertical translation of y = f(x) by 5 units up — the translation vector is (0, 5) — so only the y-coordinate of any point changes. Turning point (3, 2) → (3, 2 + 5) = (3, 7). Adding the 5 to the x-coordinate, or treating it as a horizontal shift like y = f(x + 5), moves the wrong coordinate — check first whether the number sits inside or outside the brackets.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (d) Formula A gives £39 and Formula B gives £39, and since 3(2n + 5) expands to 6n + 15 for every value of n, the stallholder is correct. — Formula A: 3(2 × 4 + 5) = 3 × 13 = £39. Formula B: 6 × 4 + 15 = 24 + 15 = £39. Expanding Formula A algebraically gives 3(2n + 5) = 6n + 15, which is identical to Formula B for every value of n, not just n = 4, so the stallholder is correct — this is an identity, not a coincidence. The option giving £29 for Formula A comes from multiplying only the 2n by 3 and forgetting to also multiply the 5, then adding the unmultiplied 5: 3 × 2 × 4 = 24, + 5 = 29. The two options that reach the correct numbers but reject the stallholder's claim both use faulty reasoning — matching values at one value of n, or counting terms, does not decide whether two expressions are identical for every n; expanding the bracket does.
- (c) 46 — Method: the cumulative frequency table gives the number of runners below each time; to find the number at or above a time, subtract that cumulative frequency from the total. Working: the cumulative frequency for t < 40 is 74, so 120 runners in total take away the 74 who finished in under 40 minutes: 120 − 74 = 46. Answer: 46 runners took 40 minutes or longer. Watch which boundary and which subtraction you use: reading off t < 50 instead of t < 40 and subtracting, 120 − 110 = 10, answers a different question, '50 minutes or longer'; giving 74 itself as the answer reports how many finished below 40 minutes, the opposite of what was asked; and subtracting the two nearby cumulative frequencies, 110 − 74 = 36, finds how many took between 40 and 50 minutes, not everyone from 40 minutes upward.
- (d) (−2, 6) — Method: add the top numbers of both vectors to the starting x-coordinate, and the bottom numbers of both vectors to the starting y-coordinate. Working: x-coordinate 2 + 3 + (−7) = −2; y-coordinate −1 + 5 + 2 = 6. Answer: (−2, 6). A candidate who only applies vector u and forgets v gets (5, 4). A candidate who only applies vector v and forgets u gets (−5, 1). A candidate who works out the combined vector u + v but forgets to add it to the starting point gets (−4, 7).
- (a) (30, 60) — Method: a cumulative frequency point is plotted at the upper boundary of its class, paired with the running total of all the frequencies up to and including that class. Working: the running totals are 7, then 7 + 19 = 26, then 26 + 34 = 60, then 60 + 40 = 100; the class 20 ≤ t < 30 has upper boundary 30, and the running total there is 60. Answer: the point for that class is plotted at 30 seconds against a cumulative frequency of 60. The distractors: (25, 60) comes from plotting at the class midpoint, which is what a frequency polygon uses and not what a cumulative frequency diagram uses; (30, 34) comes from plotting the class frequency, 34, rather than the running total; (20, 60) comes from plotting at the lower boundary of the class, which would claim that 60 calls took less than 20 seconds when only 26 did.
- (d) 11 — f⁻¹(x) = 5 means x = f(5), since applying f to both sides undoes the inverse. f(5) = 2 × 5 + 1 = 11. Writing 2 comes from confusing f⁻¹(x) = 5 with f(x) = 5, and solving 2x + 1 = 5 instead: 2x = 4, x = 2. Writing 9 comes from finding f⁻¹(x) with a sign error, f⁻¹(x) = (x + 1)/2 instead of (x − 1)/2, then setting this equal to 5: x + 1 = 10, x = 9. Writing 6 comes from finding f⁻¹(x) without dividing by 2 at all, f⁻¹(x) = x − 1, then setting this equal to 5: x = 6.
- (c) 3/20 — Method: the second fraction is quoted for the perennials only, so it is a conditional probability and the two fractions multiply. Working: the probability that a plant is a perennial is 3/5, and given that it is a perennial the probability that it is in flower is 1/4. Multiplying gives 3 × 1 over 5 × 4, which is 3/20. Answer: the probability is 3/20. The distractors: 17/20 comes from adding the fractions, 12/20 plus 5/20, instead of multiplying, which would be right only for two outcomes that cannot both happen; 4/9 comes from adding the numerators and the denominators separately, the classic 3 + 1 over 5 + 4; 1/4 quotes the flowering fraction on its own, as though every plant in the garden centre were a perennial, so the 3/5 is never used.
- (c) 75 — Method: the number in a class is the area of its bar, frequency density × class width, so work out the frequency of each class that lies at or above 10 minutes and add them. Working: the class 10 ≤ t < 25 is 15 minutes wide with a frequency density of 3.2, giving 3.2 × 15 = 48 members; the class 25 ≤ t < 55 is 30 minutes wide with a frequency density of 0.9, giving 0.9 × 30 = 27 members; the total charged is 48 + 27 = 75. Answer: 75 members pay the extra charge. The distractors: 4.1 comes from adding the two frequency densities, 3.2 + 0.9, as though each height were a count; 93 comes from including the class 0 ≤ t < 10 as well, 1.8 × 10 = 18 added to 48 and 27, which charges every member; 27 comes from using only the class 25 ≤ t < 55 and forgetting that 10 ≤ t < 25 is also at or above 10 minutes.
- (b) (5, 1) — First scale a by 2: 2a = (2×3, 2×(−2)) = (6, −4). Then add b component by component: (6+(−1), −4+5) = (5, 1). (2, 3) is a + b without doubling a first. (4, 6) doubles both a and b instead of only a. (7, −9) subtracts b from 2a instead of adding it.
- (a) −1 — Reflecting y = sin x in the x-axis gives y = −sin x, so g(x) = −sin x. Since sin 90° = 1, g(90) = −1. Reading sin 90° = 1 and forgetting to apply the reflection gives 1. Misreading the angle as 0° instead of 90° gives sin 0° = 0, so 0. Confusing sin 90° with sin 30° = 0.5, then reflecting it, gives −0.5.
- (c) −4 — f(2) = 7, and y = f(x) + a passing through (2, 3) means f(2) + a = 3, so 7 + a = 3, giving a = 3 − 7 = −4. Writing a = 4 comes from subtracting the wrong way round, 7 − 3 instead of 3 − 7. Writing a = 10 comes from adding the two y-values instead of subtracting one from the other. Writing a = 3 comes from taking the new y-coordinate as the value of a directly, without accounting for the original y-value of 7 at all.
- (c) 17.7 cm — Method: the iteration converges on x, the depth of the box, which is also the side of each square cut away; a square is removed from both ends of the 20 cm side, so the longer side of the base is 20 − 2x. Run the formula three times, then carry out that subtraction. Working: x₁ = (16 × 1² − 1³ + 50) ÷ 60 = 65 ÷ 60 = 1.08333…; x₂ = 67.50636… ÷ 60 = 1.12510…; x₃ = 68.82959… ÷ 60 = 1.14715…. The longer side of the base is 20 − 2 × 1.14715… = 17.70568…, which is 17.7 cm correct to 1 decimal place. Answer: 17.7 cm. The distractors: 1.1 cm is x₃ itself rounded, the depth of the box, given by a candidate who runs the iteration correctly and then stops before the step the question actually asks for; 18.9 cm is 20 − 1.14715…, taking away one square instead of two and forgetting that a corner is cut from each end of that side; 9.7 cm is 12 − 2 × 1.14715…, the shorter side of the base, which measures the wrong edge of the sheet.
What is on this worksheet?
The sheet holds 18 questions drawn from the MathsUK bank — the content areas covered: Algebra, Geometry and measures, Probability, Statistics (statements A6, A7, A13, A16, A20, G25, S3, P9). It is pitched at GCSE Higher and takes about 50 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 18 questions before checking — about 50 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 18 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⚗️ Ratio and proportion mastery — Higher · 24 questions · ~45 min