18 demanding questions: algebraic proof, functions, vectors, histograms, conditional probability and iteration.
🔺 Higher stretch — grade 8 and 9 topics
The top of a Higher paper is not the same content done faster — it is the statements that only appear at the top, and questions that hide two steps inside one instruction. This sheet gathers eighteen of them: algebraic proof and showing two expressions are equivalent, inverse and composite functions, transformations of graphs, the equation of a circle and its tangent, iteration, vectors used to construct a geometric argument, histograms with unequal class intervals, and conditional probability from a tree or a Venn diagram. It is deliberately hard and deliberately short. If you get half of it out, you are working where grades 8 and 9 are decided — and the worked answers are written to show the step that was actually being tested, not just the arithmetic around it.
- 1.The iterative formula xₙ₊₁ = xₙ³ − 2 is used repeatedly, starting from x₀ = 2. Which of these describes what happens to the sequence of values as n increases?
- 2.A circle has centre (0, 0) and equation x² + y² = 100. Work out which one of these points lies on the circle.
- 3.a is the column vector with top number 3 and bottom number −2. b is the column vector with top number −1 and bottom number 5. Work out 2a + b, giving your answer as a column vector in the form (top, bottom).
- 4.The graph of y = sin x is reflected in the x-axis to give the graph of y = g(x). Work out the value of g(90), where x is measured in degrees.y = sin(x)
- 5.f(x) = 3x − 2. Find f⁻¹(x).y = 3x − 2
- 6.A call centre finds that 40% of its calls are about billing. 35% of the calls about billing are dealt with in under five minutes. The centre takes 500 calls on Monday. Work out how many of Monday's calls you would expect to be about billing and dealt with in under five minutes.
- 7.A circular running track is modelled on a grid whose centre is the origin, where each unit represents 1 metre. A floodlight at the point (30, 40) stands on the edge of the track. A second floodlight stands on the edge of the track at the point (0, k), where k is positive. Work out the value of k.
- 8.In triangle OAB, OA = a and OB = b. M is the midpoint of OA, and N is the midpoint of OB. Express the vector MN in terms of a and b.
- 9.An allotment is in the shape of a rectangle. Its length is 5 m more than its width, x metres, and its area is 20 m². This gives x² + 5x − 20 = 0, which can be solved using the iterative formula xₙ₊₁ = 20 ÷ (xₙ + 5). Taking x₀ = 2, so that x₁ is the value found after the formula has been used once, work out x₂ correct to 2 decimal places.
- 10.A student attempts to prove that the sum of any three consecutive integers is a multiple of 3. Line 1: Let the three consecutive integers be n, n + 1 and n + 2. Line 2: Their sum is n + (n + 1) + (n + 2) = 3n + 2. Line 3: 3n + 2 leaves a remainder of 2 when divided by 3, so it is not a multiple of 3. Line 4: So the sum of three consecutive integers is not always a multiple of 3. Which line contains the FIRST error?
- 11.The times, t minutes, taken by 120 runners to finish a fun run are summarised by these cumulative frequencies: t < 20, 8 runners; t < 30, 26 runners; t < 40, 74 runners; t < 50, 110 runners; t < 60, 120 runners. Work out the number of runners who took 40 minutes or longer to finish.
- 12.The equation x² − 4x − 1 = 0 can be solved using the iterative formula xₙ₊₁ = √(4xₙ + 1). The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₂ correct to 3 decimal places.
- 13.A company has 400 employees. 150 of them work part time and 160 of them cycle to work. Working part time and cycling to work are independent. Work out how many of the employees you would expect both to work part time and to cycle to work.
- 14.A scientist has grouped the lifetimes, in hours, of 300 batteries into classes of unequal width. She wants a diagram in which the number of batteries in a class is given by the area of its bar. Write down the type of diagram she should draw.
- 15.Triangle ABC is translated by the column vector with top number 3 and bottom number −5 to form triangle A′B′C′. Triangle A′B′C′ is then translated by the column vector with top number −7 and bottom number 2 to form triangle A″B″C″. Work out the single column vector that translates triangle ABC directly to triangle A″B″C″.
- 16.The graph of y = f(x) has a minimum turning point at (3, 2). Write down the coordinates of the minimum turning point of the graph of y = f(x) + 5.
- 17.Two fair six-sided dice are rolled and the two scores are added together. Given that at least one of the dice shows a 5, work out the probability that the total is 8.
- 18.A circle has centre (0, 0) and equation x² + y² = 25. Work out the x-coordinates of the two points where the circle crosses the line y = 3.
Answer key
- (d) It diverges, growing rapidly without limit. — x₁ = 2³ − 2 = 8 − 2 = 6. x₂ = 6³ − 2 = 216 − 2 = 214. x₃ = 214³ − 2 = 9800344 − 2 = 9800342. The values 6, 214, 9800342, … grow far larger at every step, so the sequence diverges rather than settling anywhere. Checking whether the sequence converges to a fixed value near 2 fails, since the terms grow enormously instead of levelling off. Checking for a repeating pair of values also fails, since 6, 214 and 9800342 are all different, with no sign of a return to 6. x₀ = 2 is a fixed point only if 2³ − 2 = 2, but 2³ − 2 = 6, not 2, so the sequence does not stay constant.
- (a) (6, 8) — Method: a point lies on the circle x² + y² = 100 exactly when the squares of its two coordinates add to 100, so square both coordinates of each point and add them. Working: for (6, 8), 6² + 8² = 36 + 64 = 100, which matches the right-hand side of the equation. Answer: (6, 8) lies on the circle. The distractors: (3, 4) is the 3, 4, 5 right-angled triangle recalled but never scaled up to a radius of 10, and 3² + 4² = 25, so it lies on the far smaller circle x² + y² = 25; (5, 5) has coordinates adding to 10, which compares the sum of the coordinates with the radius instead of the sum of their squares with r², and 5² + 5² = 50; (10, 10) takes each coordinate separately to equal the radius, and 10² + 10² = 200, which is twice too big.
- (b) (5, 1) — First scale a by 2: 2a = (2×3, 2×(−2)) = (6, −4). Then add b component by component: (6+(−1), −4+5) = (5, 1). (2, 3) is a + b without doubling a first. (4, 6) doubles both a and b instead of only a. (7, −9) subtracts b from 2a instead of adding it.
- (a) −1 — Reflecting y = sin x in the x-axis gives y = −sin x, so g(x) = −sin x. Since sin 90° = 1, g(90) = −1. Reading sin 90° = 1 and forgetting to apply the reflection gives 1. Misreading the angle as 0° instead of 90° gives sin 0° = 0, so 0. Confusing sin 90° with sin 30° = 0.5, then reflecting it, gives −0.5.
- (b) (x + 2)/3 — Start with y = 3x − 2 and swap x and y: x = 3y − 2. Add 2 to both sides: x + 2 = 3y. Divide both sides by 3: y = (x + 2)/3, so f⁻¹(x) = (x + 2)/3. Writing x/3 + 2 comes from dividing only the 3y term by 3 and leaving the +2 outside the division — the 2 must be added before you divide, not after. Writing (x − 2)/3 comes from keeping the subtraction sign instead of flipping it to addition when the −2 is moved across the equals sign. Writing 3x + 2 comes from swapping x and y but never actually solving for y — just changing the sign of the constant term.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (c) 50 — Method: the edge of the track is a circle centred on the origin, so it has equation x² + y² = r²; use the floodlight whose coordinates are given to find r², then substitute x = 0 to find where that circle meets the positive y-axis. Working: 30² + 40² = 900 + 1600 = 2500, so the edge of the track is x² + y² = 2500. Substituting x = 0 gives k² = 2500, so k = √2500 = 50, taking the positive root because k is positive. Answer: k = 50. The distractors: 2500 is r² used as though it were the radius, which would place the second floodlight fifty times too far from the centre; 70 adds the two coordinates, 30 + 40, instead of adding their squares; 40 takes the y-coordinate of the first floodlight to be the radius, which would only be true if that floodlight stood on the y-axis itself.
- (b) (1/2)b − (1/2)a — Method: MN runs from M to N, so MN = ON − OM, with OM = (1/2)a and ON = (1/2)b. Working: MN = (1/2)b − (1/2)a. Answer: MN = (1/2)b − (1/2)a. Subtracting the other way round gives (1/2)a − (1/2)b, the reverse vector from N to M; subtracting the wrong way round AND forgetting to halve gives a − b, which is BA, not MN; and adding the two halved vectors instead of subtracting them gives (1/2)a + (1/2)b, which is the position vector of the midpoint of AB. Always subtract the START point's vector from the END point's vector, and halve OA and OB before you combine them, not after.
- (a) 2.55 — x₁ = 20 ÷ (2 + 5) = 20 ÷ 7 = 2.857142857. x₂ = 20 ÷ (2.857142857 + 5) = 20 ÷ 7.857142857 = 2.545454545, which rounds to 2.55. Reporting x₁ instead of x₂ gives 2.857142857, which rounds to 2.86. Dropping the +5 in the denominator, using xₙ₊₁ = 20 ÷ xₙ, gives x₁ = 20 ÷ 2 = 10 and x₂ = 20 ÷ 10 = 2, which is 2.00. A sign error in the denominator, using xₙ₊₁ = 20 ÷ (xₙ − 5), gives x₁ = 20 ÷ (2 − 5) = −6.666666667 and x₂ = 20 ÷ (−6.666666667 − 5) = −1.714285714, which rounds to −1.71.
- (d) line 2 — Line 1 correctly represents three consecutive integers using n. Line 2 adds them: n + (n + 1) + (n + 2). Collecting terms: the n-terms give 3n, and the constants give 1 + 2 = 3, so the correct sum is 3n + 3, not 3n + 2 as Line 2 states — this is the first error, an arithmetic slip in collecting the constant terms. Lines 3 and 4 both follow correctly from Line 2's incorrect result, but that result itself is wrong: the true sum, 3n + 3 = 3(n + 1), is a multiple of 3 for every whole number n. Check the working of each line against what came before it, in order, rather than judging whether the final conclusion feels right — an error that flips the conclusion can sit several lines before the line that states it.
- (c) 46 — Method: the cumulative frequency table gives the number of runners below each time; to find the number at or above a time, subtract that cumulative frequency from the total. Working: the cumulative frequency for t < 40 is 74, so 120 runners in total take away the 74 who finished in under 40 minutes: 120 − 74 = 46. Answer: 46 runners took 40 minutes or longer. Watch which boundary and which subtraction you use: reading off t < 50 instead of t < 40 and subtracting, 120 − 110 = 10, answers a different question, '50 minutes or longer'; giving 74 itself as the answer reports how many finished below 40 minutes, the opposite of what was asked; and subtracting the two nearby cumulative frequencies, 110 − 74 = 36, finds how many took between 40 and 50 minutes, not everyone from 40 minutes upward.
- (c) 3.153 — x₁ = √(4 × 1 + 1) = √5 = 2.236067977. x₂ = √(4 × 2.236067977 + 1) = √9.944271908 = 3.153453965, which rounds to 3.153. Reporting x₁ instead of x₂ gives 2.236067977, which rounds to 2.236. A sign error inside the root, using xₙ₊₁ = √(4xₙ − 1) instead of √(4xₙ + 1), gives x₁ = √3 = 1.732050808 and x₂ = √(4 × 1.732050808 − 1) = √5.928203232 = 2.434790182, which rounds to 2.435. Applying the formula in the wrong order, working out √(4xₙ) + 1 at every step instead of √(4xₙ + 1), gives x₁ = √4 + 1 = 3 and x₂ = √(4 × 3) + 1 = 4.464101615, which rounds to 4.464.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (c) A histogram, with frequency density up the vertical axis — Method: decide which diagram makes area stand for frequency, which is the property the question asks for. Working: on a histogram the vertical axis is frequency density, so the area of a bar is frequency density × class width, and that product is the frequency; this is exactly what is wanted, and it is what allows classes of unequal width to be shown fairly. Answer: a histogram, with frequency density up the vertical axis. The distractors: a bar chart plots frequency as the height, so with unequal widths a wide class would cover far more area than a narrow class holding the same number of batteries, and area would measure nothing; a cumulative frequency diagram plots running totals against upper class boundaries, so a point on it gives how many lie below a value rather than how many lie in a class; a pie chart shows each class as a share of the whole 300 and loses the class widths entirely, so no area on it is tied to a scale of hours.
- (d) (−4, −3) — The combined translation is the sum of the two column vectors, added component by component: top numbers 3 + (−7) = −4, bottom numbers −5 + 2 = −3, giving (−4, −3). (10, −7) subtracts the second vector from the first instead of adding them. (−4, 3) gets the top number right but makes a sign error on the bottom, treating −5 + 2 as +3. (4, −3) gets the bottom number right but makes a sign error on the top, treating 3 + (−7) as +4.
- (a) (3, 7) — y = f(x) + 5 is a vertical translation of y = f(x) by 5 units up — the translation vector is (0, 5) — so only the y-coordinate of any point changes. Turning point (3, 2) → (3, 2 + 5) = (3, 7). Adding the 5 to the x-coordinate, or treating it as a horizontal shift like y = f(x + 5), moves the wrong coordinate — check first whether the number sits inside or outside the brackets.
- (b) 2/11 — Method: restrict the 36 equally likely outcomes to those where at least one die shows a 5, then find what fraction of THOSE give a total of 8. Working: outcomes with at least one 5: (5, 1), (5, 2), (5, 3), (5, 4), (5, 5), (5, 6), (1, 5), (2, 5), (3, 5), (4, 5), (6, 5) — 11 outcomes. Among these, the total is 8 for (5, 3) and (3, 5) — 2 outcomes. P(total 8 | at least one 5) = 2/11. Answer: 2/11. Watch out: 5/36 is P(total 8) over the full 36 outcomes — it ignores that you already know one die shows a 5. Treating the condition as 'the first die shows a 5' instead of 'at least one die shows a 5' restricts you to only 6 outcomes and misses the (3, 5) case, giving 1/6. And counting only (5, 3) but not its reverse (3, 5) inside the correct 11-outcome list gives 1/11 instead of 2/11.
- (d) x = 4 and x = −4 — Substituting y = 3 gives x² + 9 = 25, which simplifies to x² = 16, so x = 4 or x = −4. Choosing 'x = 3 and x = −3' uses the given value y = 3 as if it were the x-coordinate. Choosing 'x = 4' alone finds the positive square root of 16 but forgets the negative root. Choosing 'x = 5 and x = −5' skips subtracting 3² = 9 from 25 and takes the square root of 25 directly.
What is on this worksheet?
The sheet holds 18 questions drawn from the MathsUK bank — the content areas covered: Algebra, Geometry and measures, Probability, Statistics (statements A6, A7, A13, A16, A20, G25, S3, P9). It is pitched at GCSE Higher and takes about 50 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 18 questions before checking — about 50 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 18 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⚗️ Ratio and proportion mastery — Higher · 24 questions · ~45 min