24 questions across ratio, direct and inverse proportion, compound measures and area and volume scale factors.
⚗️ Ratio and proportion mastery — Higher
Ratio, proportion and rates of change is 20% of a Higher paper and it is the area that rewards method over recall. This sheet works through it in one sitting: simplifying and sharing in a ratio, including the questions that give you one share or the difference rather than the total; expressing one quantity as a fraction or percentage of another; direct and inverse proportion, both numerically and as an equation with a constant k; compound measures — speed, density and pressure — with unit conversions built in rather than avoided; and the similar-shapes work where lengths, areas and volumes scale by the factor, its square and its cube. That last group is where Higher candidates lose the most marks in this area, so it is deliberately over-represented here.
- 1.A train travels at a constant speed of 90 km/h. Work out the speed in m/s.
- 2.A jug of squash is made by mixing water and syrup in the ratio 6:1. Nia wants to make 8.4 litres of squash. Work out how much syrup she needs, in litres.
- 3.A sculptor makes two mathematically similar statues. The smaller statue is 20 cm tall and 80 ml of varnish covers its surface. The larger statue is 50 cm tall. Work out how much varnish is needed to cover the surface of the larger statue.
- 4.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 5.y is directly proportional to x. When x = 5, y = 18. Work out the value of y when x = 15.
- 6.A coach journey of 240 km takes 3 hours. For this fixed distance the average speed needed is inversely proportional to the time taken. Work out the average speed needed to complete the same journey in 2 hours.
- 7.A garden centre sells two mathematically similar sacks of grass seed. The amount of lawn a sack can treat is proportional to the volume of seed inside it. The smaller sack is 20 cm tall and treats a lawn of area 30 m². The larger sack is 40 cm tall. A gardener needs to treat a lawn with an area of 500 m² using only the larger sacks. Work out the minimum number of larger sacks needed.
- 8.A model car is built at a scale of 1 : 20 compared with the real car. Work out the factor by which the surface area to be painted on the real car is bigger than the surface area of the model.
- 9.The manufacturing cost of a specialist lens, in pounds, is proportional to the square root of its diameter, in millimetres. A lens of diameter 9 mm costs £12 to manufacture. Construct the equation connecting cost C and diameter d, then work out the cost of manufacturing a lens of diameter 16 mm.
- 10.A spring's extension is directly proportional to the force applied to it. A force of 5 N produces an extension of 12 mm. Work out the extension produced by a force of 20 N.
- 11.A car travels for 3 hours at an average speed of 80 km/h and then for 1 hour at an average speed of 40 km/h. Work out the average speed for the whole journey.
- 12.A coach travels the 54 miles from London to Brighton in 1 hour 30 minutes. Work out the average speed of the coach, in mph.
- 13.A mortar mix is made from sand and cement in the ratio 5 : 3. Write the ratio of sand to the total mix in its simplest form.
- 14.y is inversely proportional to x², and x is positive. When x = 2, y = 45. Construct the equation connecting x and y, then work out the value of x when y = 5.
- 15.Two quantities x and y are inversely proportional. When x = 2, the value of y is 15. Work out the value of y when x = 5.
- 16.A force of 126 N acts on an area of 3.5 m². Work out the pressure on the area, in N/m².
- 17.y is directly proportional to x², and x is positive. When x = 4, y = 32. Construct the equation connecting x and y, then work out the value of x when y = 200.
- 18.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 19.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 20.Write the ratio 0.75 : 2 as a ratio of whole numbers in its simplest form.
- 21.Two mathematically similar circles have radii 4 cm and 20 cm. Write the ratio of the area of the smaller circle to the area of the larger circle in its simplest form.
- 22.Write 75p : £1.50 as a ratio of whole numbers in its simplest form.
- 23.The strength of a radio signal, in units, is inversely proportional to the square of the distance from the transmitter, in km. At a distance of 2 km the signal strength is 20 units. Construct the equation connecting signal strength S and distance d, then work out the distance at which the signal strength is 5 units.
- 24.A metal cylinder has a mass of 356.5 g and a volume of 47 cm³. Work out the density of the cylinder, in g/cm³, to 1 decimal place.
Answer key
- (b) 25 m/s — Convert km/h to m/s by multiplying by 1000 (km to m) and dividing by 3600 (hours to seconds): 90 × 1000 ÷ 3600 = 25 m/s. Working out 90 ÷ 60 = 1.5 converts using 60, as if going from hours to minutes rather than to seconds. Working out 90 × 3.6 = 324 multiplies by 3.6 instead of dividing by it, going the wrong way between the units. Working out 90 × 1000 = 90000 converts kilometres to metres but forgets to convert hours to seconds at all. The train's speed is 25 m/s.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (c) 120 km/h — Method: for a fixed distance the average speed multiplied by the time is constant, and that constant is the distance, so divide the distance by the new time. Working: speed × time = 240, so in 2 hours the speed needed is 240 ÷ 2 = 120 km/h. Answer: 120 km/h. The distractors: 80 km/h is the average speed of the original journey, 240 ÷ 3, which answers for the 3-hour timing rather than the 2-hour one; 160 km/h comes from halving the 3 hours to 1.5 hours and working out 240 ÷ 1.5, instead of using the 2 hours the question gives; 480 km/h comes from multiplying the distance by the 2 hours rather than dividing by it.
- (c) 3 — Method: find the height scale factor, cube it to find the volume (and coverage) scale factor, use it to find one large sack's coverage, then divide the total lawn area by this and round up to a whole number of sacks. Working: height scale factor = 40 ÷ 20 = 2, so coverage scale factor = 2³ = 8, and each large sack covers 30 × 8 = 240 m². 500 ÷ 240 = 2.08…, which rounds UP to 3 whole sacks. Answer: 3. 2 comes from correctly finding that each large sack covers 240 m², but then rounding 500 ÷ 240 down instead of up, which would leave part of the lawn untreated. 5 comes from squaring the height scale factor (2² = 4) instead of cubing it, giving a coverage of only 30 × 4 = 120 m² per sack. 17 comes from forgetting to scale the coverage at all and dividing 500 by the smaller sack's coverage of 30 m².
- (d) 400 — The area scale factor is the length scale factor squared: 20² = 400, so the real car's surface area is 400 times the model's. 20 comes from using the length scale factor itself, without squaring it. 8000 comes from cubing the length scale factor (20³), instead of squaring it — cubing is the rule for volume, not area. 40 comes from doubling the length scale factor (2 × 20), instead of squaring it.
- (b) £16 — Since cost is proportional to the square root of diameter, C = k√d. Using d = 9, C = 12: √9 = 3, so 12 = k × 3, giving k = 12 ÷ 3 = 4. The equation is C = 4√d. When d = 16: √16 = 4, so C = 4 × 4 = 16. Halving the new diameter instead of taking its square root gives 16 ÷ 2 = 8, and then C = 4 × 8 = 32 — halving a number is not the same as taking its square root, as √16 = 4, not 8. Multiplying k by the diameter itself instead of by its square root gives C = 4 × 16 = 64, skipping the square root altogether. Reporting √16 on its own, without multiplying by k, gives only 4, not the cost. The cost of manufacturing a lens of diameter 16 mm is £16.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (d) 36 mph — First convert 1 hour 30 minutes to hours: 30 minutes is half an hour, so the time is 1.5 hours. Then divide the distance by the time: 54 ÷ 1.5 = 36 mph. Reading 1 hour 30 minutes as 1.3 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 54 ÷ 1.3 ≈ 41.54 mph. Working out 54 ÷ 30 = 1.8 divides by the number of minutes only, ignoring the hour. Working out 54 × 1.5 = 81 multiplies by the time instead of dividing. The coach's average speed is 36 mph.
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (a) 6 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 45: 2² = 4, so 45 = k ÷ 4, giving k = 45 × 4 = 180. The equation is y = 180/x². When y = 5: x² = 180 ÷ 5 = 36, so x = 6, taking the positive root because the question states that x is positive. Treating the relationship as inversely proportional to x itself gives k = 45 × 2 = 90 and then x = 90 ÷ 5 = 18, a different relationship. Multiplying by y instead of dividing by it when isolating x² gives x² = 180 × 5 = 900 and x = 30, the wrong operation. Stopping at x² = 36 without taking the square root leaves 36, not the value of x. When y = 5, x = 6.
- (a) 6 — Method: for inverse proportion the product xy is the same for every pair, so find that product and use it to work back to the missing value. Working: xy = 2 × 15 = 30, so when x = 5 the equation 5y = 30 gives y = 30 ÷ 5 = 6. Answer: 6. The distractors: 37.5 comes from treating the pair as direct proportion and scaling y up with x, 15 × 5 ÷ 2, although in inverse proportion y falls as x rises; 30 is the constant product itself, given as a value of y rather than used to find one; 12 comes from additive thinking — x rises by 3, so 3 is taken off y — which would make the two quantities differ by a constant instead of multiplying to one.
- (a) 36 — Pressure = force ÷ area, so 126 ÷ 3.5 = 36 N/m². (0.03 comes from dividing the area by the force instead of the force by the area, the wrong way round. 129.5 comes from adding 126 and 3.5 instead of dividing. 441 comes from multiplying 126 by 3.5 instead of dividing.)
- (a) 10 — Since y is directly proportional to x², y = kx². Using x = 4, y = 32: 32 = k × 16, so k = 32 ÷ 16 = 2. The equation is y = 2x². When y = 200: x² = 200 ÷ 2 = 100, so x = 10, taking the positive root because the question states that x is positive. Stopping at x² = 100 without taking the square root leaves 100, not the value of x itself. Treating the relationship as if y were proportional to x itself gives k = 32 ÷ 4 = 8 and then x = 200 ÷ 8 = 25, which is a different relationship entirely. Multiplying by k instead of dividing when rearranging gives x² = 200 × 2 = 400 and x = 20, which is not this equation rearranged correctly. The value of x when y = 200 is 10.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (d) 3 : 8 — Multiply both parts by 4 to clear the decimal: 0.75 × 4 = 3 and 2 × 4 = 8, giving 3 : 8, which has no common factor other than 1. Giving 75 : 200 multiplies by 100 instead of 4, and has not then been simplified down to 3 : 8. Giving 0.75 : 2 has not been converted into whole numbers at all. Giving 3 : 2 converts the first part correctly but leaves the second part unscaled.
- (c) 1 : 25 — The radii are in the ratio 4 : 20, which simplifies to 1 : 5. Areas scale with the square of the length ratio, so the area ratio is 1² : 5² = 1 : 25. Giving 1 : 5 uses the radius ratio without squaring it. Giving 1 : 10 doubles the radius ratio instead of squaring it. Giving 25 : 1 has the areas the right way round for larger to smaller, not smaller to larger.
- (c) 1:2 — Convert £1.50 into pence: £1.50 = 150p, so the ratio is 75 : 150. Dividing both parts by 75 gives 1 : 2. Getting 50 : 1 comes from not converting the units at all and simplifying 75 : 1.5. Getting 2 : 1 has the two parts the wrong way round. Getting 3 : 4 comes from reading 75p as 3/4 of a pound and then comparing it with £1 instead of £1.50.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (c) 7.6 — Density = mass ÷ volume, so 356.5 ÷ 47 = 7.585..., which rounds to 7.6 g/cm³ (1 d.p.). (0.1 comes from dividing the volume by the mass instead of the mass by the volume, the wrong way round. 7.5 comes from rounding 7.585 down instead of up to 1 decimal place. 403.5 comes from adding the mass and the volume instead of dividing.)
What is on this worksheet?
The sheet holds 24 questions drawn from the MathsUK bank — the content area covered: Ratio, proportion and rates of change (statements R4, R5, R9, R10, R11, R12, R13). It is pitched at GCSE Higher and takes about 45 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 24 questions before checking — about 45 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 24 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- 🎯 Grade 4 pass booster · 25 questions · ~40 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⭕ Circle theorems practice · 18 questions · ~40 min