24 questions across ratio, direct and inverse proportion, compound measures and area and volume scale factors.
⚗️ Ratio and proportion mastery — Higher
Ratio, proportion and rates of change is 20% of a Higher paper and it is the area that rewards method over recall. This sheet works through it in one sitting: simplifying and sharing in a ratio, including the questions that give you one share or the difference rather than the total; expressing one quantity as a fraction or percentage of another; direct and inverse proportion, both numerically and as an equation with a constant k; compound measures — speed, density and pressure — with unit conversions built in rather than avoided; and the similar-shapes work where lengths, areas and volumes scale by the factor, its square and its cube. That last group is where Higher candidates lose the most marks in this area, so it is deliberately over-represented here.
- 1.Write 75p : £1.50 as a ratio of whole numbers in its simplest form.
- 2.For the pairs x = 6, y = 15 and x = 10, y = 25, which statement is correct?
- 3.40% of a number is 12 more than 25% of the same number. Work out the number.
- 4.The price of a games console is reduced by 10%. In a later sale the reduced price is reduced by 10% again. Work out the overall percentage decrease.
- 5.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 6.A mortar mix is made from sand and cement in the ratio 5 : 3. Write the ratio of sand to the total mix in its simplest form.
- 7.Order these three values from smallest to largest: 3/8, 0.43, 41%.
- 8.It takes 2 identical pumps 10 hours to empty a flooded basement. Working at the same rate, work out how many hours 5 of these pumps would take to empty the same basement.
- 9.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 10.Write the ratio 8 : 15 in the form 1 : n.
- 11.A spring's extension is directly proportional to the force applied to it. A force of 5 N produces an extension of 12 mm. Work out the extension produced by a force of 20 N.
- 12.The cost of manufacturing a spherical container is proportional to the cube of its radius. A container of radius 3 cm costs £54 to manufacture. Construct the equation connecting cost C and radius r, then work out the cost of a container of radius 5 cm.
- 13.A shade of paint is made by mixing blue paint and white paint. To make 5 litres of the shade, 2 litres of blue paint is used and the rest is white paint. Write the ratio of blue paint to white paint in its simplest form.
- 14.y is inversely proportional to x, so y = k ÷ x. When x = 5, the value of y is 8. Work out the value of k.
- 15.The number of tickets a group can afford is inversely proportional to the price per ticket. At £4 per ticket, the group can afford 12 tickets. Work out how many tickets the group can afford at £6 per ticket.
- 16.The manufacturing cost of a specialist lens, in pounds, is proportional to the square root of its diameter, in millimetres. A lens of diameter 9 mm costs £12 to manufacture. Construct the equation connecting cost C and diameter d, then work out the cost of manufacturing a lens of diameter 16 mm.
- 17.An architect builds a scale model of a staircase before construction. The model is mathematically similar to the real staircase, at a scale of 1 : 10. The model covers a floor area of 0.4 m² on the plan. Work out the floor area the real staircase will cover, giving your answer in m².
- 18.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 19.An amount of money is shared in the ratio 1:2:3. The largest share is £90 more than the smallest share. Work out the total amount that was shared.
- 20.A car travels for 3 hours at an average speed of 80 km/h and then for 1 hour at an average speed of 40 km/h. Work out the average speed for the whole journey.
- 21.A metal cylinder has a mass of 356.5 g and a volume of 47 cm³. Work out the density of the cylinder, in g/cm³, to 1 decimal place.
- 22.Ffion is paid £11.20 per hour. She works 6 hours on Monday and 4.5 hours on Tuesday. Work out her total pay for the two days.
- 23.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 24.Two mathematically similar polygons have perimeters in the ratio 2 : 5. Write the ratio of their areas in its simplest form.
Answer key
- (c) 1:2 — Convert £1.50 into pence: £1.50 = 150p, so the ratio is 75 : 150. Dividing both parts by 75 gives 1 : 2. Getting 50 : 1 comes from not converting the units at all and simplifying 75 : 1.5. Getting 2 : 1 has the two parts the wrong way round. Getting 3 : 4 comes from reading 75p as 3/4 of a pound and then comparing it with £1 instead of £1.50.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (b) 80 — Method: the difference between 40% and 25% of the number is 15% of the number, and that difference is 12. Working: 15% of the number is 12, so 1% of the number is 12 ÷ 15 = 0.8, and the number is 0.8 × 100 = 80. Check: 40% of 80 is 32, 25% of 80 is 20, and 32 − 20 = 12. Answer: 80. The distractors: 30 comes from solving 40% of the number = 12; 48 comes from solving 25% of the number = 12; 15 is the percentage difference written as the answer.
- (d) 19% — Method: write each decrease as a multiplier, multiply the multipliers, then compare the result with 100%. Working: a 10% decrease is a multiplier of 0.9, so the two reductions together give 0.9 × 0.9 = 0.81; the final price is 81% of the original, so the price has fallen by 100% − 81% = 19%. Answer: an overall decrease of 19%. The distractors: 20% comes from adding the two reductions, 10% + 10%, which charges the second 10% against the original price instead of against the already reduced price; 21% comes from using the increase multiplier by mistake, since 1.1 × 1.1 = 1.21, and reading that 21% as a decrease; 81% is the percentage of the original price still being paid, not the percentage taken off.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (a) 3/8, 41%, 0.43 — Method: convert every value to a decimal so they can be compared on the same scale, then order them. Working: 3/8 = 0.375, 41% = 0.41, and 0.43 stays as 0.43, so from smallest to largest the decimals are 0.375, 0.41, 0.43, giving the order 3/8, 41%, 0.43. Answer: 3/8, 41%, 0.43. The order 3/8, 0.43, 41% comes from comparing 0.43 and 41% as raw digits (43 versus 41) without converting 41% into the decimal 0.41 first, wrongly placing 0.43 before 41%. The order 0.43, 41%, 3/8 comes from placing the values in completely reversed order, from largest to smallest instead of smallest to largest. The order 41%, 0.43, 3/8 comes from ordering the values by their TYPE (percentage, then decimal, then fraction) rather than by their actual size.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) 1 : 1.875 — To write a ratio in the form 1 : n, divide both parts by the first part, 8: 8 ÷ 8 = 1 and 15 ÷ 8 = 1.875, giving 1 : 1.875. Giving 1 : 0.53 divides the wrong way round, computing 8 ÷ 15 instead of 15 ÷ 8. Giving 1.875 : 1 has the two parts of the answer swapped, which is the form n : 1, not 1 : n. Giving 8 : 1.875 divides only the second part by 8, so the first part is still 8, not 1.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (b) £250 — Since cost is proportional to the cube of the radius, C = kr³. Using r = 3, C = 54: 3³ = 27, so 54 = k × 27, giving k = 54 ÷ 27 = 2. The equation is C = 2r³. When r = 5: 5³ = 125, so C = 2 × 125 = 250. Treating the relationship as proportional to r² instead of r³ gives k = 54 ÷ 9 = 6 and then C = 6 × 25 = 150, which models area scaling, not volume scaling. Treating it as proportional to r itself gives k = 54 ÷ 3 = 18 and then C = 18 × 5 = 90. Finding k correctly from the cube but then multiplying it by the radius instead of by the cube of the radius gives 2 × 5 = 10, which applies the right constant to the wrong power of r. The cost of a container of radius 5 cm is £250.
- (c) 2:3 — The white paint is 5 − 2 = 3 litres. The ratio of blue paint to white paint is 2 : 3, which has no common factor, so it is already in simplest form. Getting 2 : 5 compares the blue paint to the total amount of shade instead of to the white paint. Getting 3 : 2 has the two parts the wrong way round. Getting 5 : 3 uses the total amount of shade instead of the blue paint as the first part.
- (d) 40 — Substitute x = 5 and y = 8 into y = k ÷ x to get 8 = k ÷ 5, so k = 8 × 5 = 40. Getting 13 comes from adding the two numbers (5 + 8) instead of multiplying. Getting 1.6 comes from dividing 8 by 5 instead of multiplying. Getting 3 comes from subtracting the two numbers (8 − 5) instead of multiplying.
- (d) 8 — The product of price and number of tickets is constant: k = 4 × 12 = 48. At £6 per ticket, the number of tickets is 48 ÷ 6 = 8. Getting 18 comes from treating price and tickets as directly proportional and working out 12 × 6 ÷ 4 instead of dividing k by the new price. Getting 12 assumes the number of tickets does not change when the price changes. Getting 6 comes from writing down the new price instead of working out the number of tickets.
- (b) £16 — Since cost is proportional to the square root of diameter, C = k√d. Using d = 9, C = 12: √9 = 3, so 12 = k × 3, giving k = 12 ÷ 3 = 4. The equation is C = 4√d. When d = 16: √16 = 4, so C = 4 × 4 = 16. Halving the new diameter instead of taking its square root gives 16 ÷ 2 = 8, and then C = 4 × 8 = 32 — halving a number is not the same as taking its square root, as √16 = 4, not 8. Multiplying k by the diameter itself instead of by its square root gives C = 4 × 16 = 64, skipping the square root altogether. Reporting √16 on its own, without multiplying by k, gives only 4, not the cost. The cost of manufacturing a lens of diameter 16 mm is £16.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (d) £270 — Method: the £90 is a difference between two shares, so turn it into a number of parts before finding the value of one part. Working: the largest share is 3 parts and the smallest is 1 part, so the difference is 3 − 1 = 2 parts and 2 parts are worth £90; one part = £90 ÷ 2 = £45; the whole amount is 1 + 2 + 3 = 6 parts, so 6 × £45 = £270. Answer: £270. The distractors: £540 comes from treating the £90 as the value of one part and multiplying it by the 6 parts; £180 comes from finding the £45 correctly but adding only the 1-part and 3-part shares and forgetting the middle share; £135 comes from multiplying £45 by 3 and giving the largest share instead of the total.
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (c) 7.6 — Density = mass ÷ volume, so 356.5 ÷ 47 = 7.585..., which rounds to 7.6 g/cm³ (1 d.p.). (0.1 comes from dividing the volume by the mass instead of the mass by the volume, the wrong way round. 7.5 comes from rounding 7.585 down instead of up to 1 decimal place. 403.5 comes from adding the mass and the volume instead of dividing.)
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (b) 4 : 25 — For similar shapes, the ratio of areas is the ratio of lengths squared: 2² : 5² = 4 : 25. 2 : 5 comes from using the perimeter ratio itself as the area ratio, without squaring it at all. 8 : 125 comes from cubing each part instead of squaring (2³ : 5³) — cubing is the rule for volume, not area. 4 : 5 comes from squaring only the first part of the ratio (2² = 4), and leaving the second part unsquared.
What is on this worksheet?
The sheet holds 24 questions drawn from the MathsUK bank — the content area covered: Ratio, proportion and rates of change (statements R4, R5, R9, R10, R11, R12, R13). It is pitched at GCSE Higher and takes about 45 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 24 questions before checking — about 45 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 24 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- 🎯 Grade 4 pass booster · 25 questions · ~40 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⭕ Circle theorems practice · 18 questions · ~40 min