24 questions across ratio, direct and inverse proportion, compound measures and area and volume scale factors.
⚗️ Ratio and proportion mastery — Higher
Ratio, proportion and rates of change is 20% of a Higher paper and it is the area that rewards method over recall. This sheet works through it in one sitting: simplifying and sharing in a ratio, including the questions that give you one share or the difference rather than the total; expressing one quantity as a fraction or percentage of another; direct and inverse proportion, both numerically and as an equation with a constant k; compound measures — speed, density and pressure — with unit conversions built in rather than avoided; and the similar-shapes work where lengths, areas and volumes scale by the factor, its square and its cube. That last group is where Higher candidates lose the most marks in this area, so it is deliberately over-represented here.
- 1.A jumper costs £45 at Shop A, where it is reduced by 20%. The same jumper costs £34 at Shop B, where a further 10% reduction is then applied. Work out the difference between the two reduced prices.
- 2.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 3.y is inversely proportional to x². When x = 2, y = 8. Construct the equation connecting x and y, then work out the value of y when x = 4.
- 4.The price of a cycling helmet rises from £80 to £116. Work out the percentage increase.
- 5.Two cars leave the same point at the same time and travel in opposite directions. One travels at 80 km/h and the other at 60 km/h. Work out how long it takes until the cars are 350 km apart.
- 6.Write 45 minutes : 2 hours as a ratio in its simplest form.
- 7.The price of a jacket increases by 50% and then decreases by 50%. Describe the overall change from the original price.
- 8.A cyclist rides 30 km in 1 hour 30 minutes. Work out the average speed of the cyclist in km/h.
- 9.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 10.The rent on a flat increases by 10% one year and by a further 10% the following year. Work out the overall percentage increase over the two years.
- 11.A 1.5 kg bag of pasta costs £2.85 and a 2.4 kg bag of the same pasta costs £4.32. Work out which bag gives better value for money.
- 12.Jamal invests £600 in a savings account paying 3% simple interest per year. Work out the total amount in the account after 4 years.
- 13.Two mathematically similar tins have heights 8 cm and 12 cm. Jayden says that the volume of the larger tin is 1.5 times the volume of the smaller tin. Give a reason why Jayden is incorrect, and work out the correct volume scale factor.
- 14.Work out the value of x when 4/x = 2/5.
- 15.A concrete block exerts a force of 45 N on the ground through a base with an area of 0.05 m². Work out the pressure on the ground, in N/m².
- 16.y is directly proportional to √x. When x = 25, y = 20. Construct the equation connecting x and y, then work out the value of x when y = 32.
- 17.The strength of a radio signal, in units, is inversely proportional to the square of the distance from the transmitter, in km. At a distance of 2 km the signal strength is 20 units. Construct the equation connecting signal strength S and distance d, then work out the distance at which the signal strength is 5 units.
- 18.A metal sample has a mass of 342.6 g and a volume of 18 cm³. Work out the density of the sample, in g/cm³, to 1 decimal place.
- 19.It takes 8 painters 6 days to paint a fence. Working at the same rate, work out how many days 4 painters would take to paint the same fence.
- 20.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
- 21.Two mathematically similar water bottles have a volume scale factor of 8 from the smaller bottle to the larger bottle. Work out the surface area scale factor from the smaller bottle to the larger bottle.
- 22.Write the ratio 3/4 : 1/2 as a ratio of whole numbers in its simplest form.
- 23.A jug holds 3 litres of a drink that is 60% fruit juice. 1 litre of water is added to the jug. Work out the percentage of the new mixture that is fruit juice.
- 24.3 builders put up a fence in 12 days. All the builders work at the same rate, so the number of days is inversely proportional to the number of builders. Work out how long 9 builders take to put up the same fence.
Answer key
- (d) £5.40 — Method: work out the reduced price at each shop separately, then subtract the smaller from the larger. Working: Shop A's reduced price is £45 × 0.8 = £36, and Shop B's reduced price is £34 × 0.9 = £30.60, so the difference is £36 − £30.60 = £5.40. Answer: £5.40. £11.00 comes from comparing the two ORIGINAL prices, £45 − £34, without applying either shop's reduction at all. £1.60 comes from finding Shop A's reduced price correctly, £36, but then subtracting Shop B's original (unreduced) price of £34 instead of its reduced price. £66.60 comes from adding the two reduced prices together, £36 + £30.60, instead of subtracting them.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (a) 2 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 8: 2² = 4, so 8 = k ÷ 4, giving k = 8 × 4 = 32. The equation is y = 32/x². When x = 4: 4² = 16, so y = 32 ÷ 16 = 2. Treating the relationship as inversely proportional to x itself, rather than to x², gives k = 8 × 2 = 16 and then y = 16 ÷ 4 = 4, a different relationship. Using x instead of x² in the new calculation gives y = 32 ÷ 4 = 8, skipping the square. Multiplying by x² instead of dividing by it gives y = 32 × 16 = 512, the wrong operation for an inverse relationship. When x = 4, y = 2.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (c) a decrease of 25% — Method: use multipliers. An increase of 50% is × 1.5 and a decrease of 50% is × 0.5. Working: 1.5 × 0.5 = 0.75, so the final price is 75% of the original. Answer: a decrease of 25%. The distractors: no change comes from assuming +50% and −50% cancel; a decrease of 50% comes from applying only the second change; an increase of 25% has the direction wrong.
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (c) 21% — Method: an increase of 10% is a multiplier of 1.1, and two successive increases are found by multiplying the multipliers. Working: 1.1 × 1.1 = 1.21, so the rent is 121% of the original, which is an increase of 21%. Answer: 21%. The distractors: 20% comes from adding the two percentages, which ignores that the second 10% is taken of a larger amount; 121% is the multiplier written as the change rather than the change itself; 11% comes from slipping in the multiplication and getting 1.11 instead of 1.21.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (c) £672 — Simple interest per year = 3% of £600 = £18. Over 4 years the interest is 18 × 4 = £72. Total in the account = £600 + £72 = £672. A student who gives just the interest, without adding it to the principal, writes £72. A student who adds only one year's interest instead of four gets £600 + £18 = £618. A student who wrongly compounds the interest each year gets 600 × 1.03⁴ = £675.31.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (a) 10 — Method: two equal fractions can be rearranged by cross-multiplying, multiplying each numerator by the other denominator. Working: 4 × 5 = 2 × x, so 2x = 20 and x = 20 ÷ 2 = 10. Answer: 10. The distractors: 20 comes from cross-multiplying to 4 × 5 = 20 and stopping there, without dividing by the 2; 8 comes from multiplying the two numerators, 4 × 2; 2.5 comes from working only with the right-hand fraction, 5 ÷ 2, and ignoring the 4.
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (b) 19.0 g/cm³ — Density = mass ÷ volume. 342.6 ÷ 18 = 19.0333…, which rounds to 19.0 g/cm³ (1 d.p.). 6166.8 g/cm³ comes from multiplying the mass by the volume instead of dividing (342.6 × 18). 324.6 g/cm³ comes from subtracting the volume from the mass (342.6 − 18) instead of dividing. 0.1 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (18 ÷ 342.6 = 0.0525…, rounded to 1 d.p.).
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (b) 4 — Method: find the length scale factor by taking the cube root of the volume scale factor, then square it to get the area scale factor. Working: 8 = 2³, so the length scale factor is 2, and the area scale factor is 2² = 4. Answer: 4. 8 comes from using the volume scale factor itself as if it were the area scale factor. 64 comes from squaring the volume scale factor, 8² = 64, instead of first taking its cube root. 2 comes from correctly finding the length scale factor but then forgetting to square it.
- (b) 3:2 — Write both fractions over a common denominator of 4: 3/4 stays as 3/4, and 1/2 = 2/4. Comparing the numerators gives the ratio 3 : 2. Getting 2 : 3 swaps the two parts round. Getting 3 : 1 comes from using the numerator of the first fraction and the original numerator of the second fraction (1) without converting to a common denominator. Getting 2 : 1 comes from using only the denominators, 4 and 2, and simplifying those instead of the numerators.
- (c) 45% — Method: adding water changes the total volume but not the amount of fruit juice, so find the juice, find the new total volume, and write the first as a percentage of the second. Working: 3 × 0.6 = 1.8 litres of fruit juice; the new volume is 3 + 1 = 4 litres; 1.8 ÷ 4 = 0.45, which is 45%. Answer: 45%. The distractors: 60% is the strength before the water goes in, and assumes that adding water leaves the strength unchanged; 15% comes from dividing the 60% by the 4 litres of mixture instead of dividing the 1.8 litres of juice by the 4 litres; 75% is the fraction of the new mixture that came out of the original jug, 3 litres out of 4, which ignores that only 60% of that 3 litres was juice.
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
What is on this worksheet?
The sheet holds 24 questions drawn from the MathsUK bank — the content area covered: Ratio, proportion and rates of change (statements R4, R5, R9, R10, R11, R12, R13). It is pitched at GCSE Higher and takes about 45 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 24 questions before checking — about 45 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 24 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- 🎯 Grade 4 pass booster · 25 questions · ~40 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⭕ Circle theorems practice · 18 questions · ~40 min