24 questions across ratio, direct and inverse proportion, compound measures and area and volume scale factors.
⚗️ Ratio and proportion mastery — Higher
Ratio, proportion and rates of change is 20% of a Higher paper and it is the area that rewards method over recall. This sheet works through it in one sitting: simplifying and sharing in a ratio, including the questions that give you one share or the difference rather than the total; expressing one quantity as a fraction or percentage of another; direct and inverse proportion, both numerically and as an equation with a constant k; compound measures — speed, density and pressure — with unit conversions built in rather than avoided; and the similar-shapes work where lengths, areas and volumes scale by the factor, its square and its cube. That last group is where Higher candidates lose the most marks in this area, so it is deliberately over-represented here.
- 1.Two investors put money into a business in the ratio 3:5. The first investor puts in £1,200. Work out the total amount invested by both investors.
- 2.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 3.The price of a games console is reduced by 10%. In a later sale the reduced price is reduced by 10% again. Work out the overall percentage decrease.
- 4.A model car is built at a scale of 1 : 20 compared with the real car. Work out the factor by which the surface area to be painted on the real car is bigger than the surface area of the model.
- 5.An architect builds a scale model of a staircase before construction. The model is mathematically similar to the real staircase, at a scale of 1 : 10. The model covers a floor area of 0.4 m² on the plan. Work out the floor area the real staircase will cover, giving your answer in m².
- 6.Write 45 minutes : 2 hours as a ratio in its simplest form.
- 7.A recipe for pastry uses flour and butter in the ratio 3:2. A baker has 180 g of butter and wants to make pastry using all of it. Work out the total mass of pastry the baker can make.
- 8.A jug of squash is made by mixing water and syrup in the ratio 6:1. Nia wants to make 8.4 litres of squash. Work out how much syrup she needs, in litres.
- 9.y is directly proportional to √x. When x = 4, y = 8. Construct the equation connecting x and y, then work out the value of y when x = 9.
- 10.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 11.A shade of paint is made by mixing blue paint and white paint. To make 5 litres of the shade, 2 litres of blue paint is used and the rest is white paint. Write the ratio of blue paint to white paint in its simplest form.
- 12.Grace's mean mark in her maths tests rises from 70 to 84. Work out the percentage increase in her mean mark.
- 13.Amelia uses 2 kg of flour to bake 5 cakes. Using the same recipe, work out how many cakes she can bake with 6 kg of flour.
- 14.A sculptor makes two mathematically similar statues. The smaller statue is 20 cm tall and 80 ml of varnish covers its surface. The larger statue is 50 cm tall. Work out how much varnish is needed to cover the surface of the larger statue.
- 15.Ffion is paid £11.20 per hour. She works 6 hours on Monday and 4.5 hours on Tuesday. Work out her total pay for the two days.
- 16.y is inversely proportional to x, so y = k ÷ x. When x = 5, the value of y is 8. Work out the value of k.
- 17.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 18.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 19.The manufacturing cost of a specialist lens, in pounds, is proportional to the square root of its diameter, in millimetres. A lens of diameter 9 mm costs £12 to manufacture. Construct the equation connecting cost C and diameter d, then work out the cost of manufacturing a lens of diameter 16 mm.
- 20.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 21.Write the ratio 8 : 15 in the form 1 : n.
- 22.Two mathematically similar water bottles have a volume scale factor of 8 from the smaller bottle to the larger bottle. Work out the surface area scale factor from the smaller bottle to the larger bottle.
- 23.In a science lesson Priya has 10 litres of a solution that is 30% salt. She adds water to make a solution that is 20% salt. Work out how many litres of water she adds.
- 24.Write the ratio 0.75 : 2 as a ratio of whole numbers in its simplest form.
Answer key
- (c) £3,200 — Method: find the value of one part of the ratio from the first investor's amount, then work out the second investor's share before adding both together. Working: £1,200 is 3 parts, so one part is £1,200 ÷ 3 = £400. The second investor's share is 5 × £400 = £2,000, and the total is £1,200 + £2,000 = £3,200. So the total invested is £3,200. Distractor £2,000 is only the second investor's share, without adding the first investor's £1,200. Distractor £2,400 comes from doubling the first investor's amount instead of using the ratio. Distractor £6,000 comes from multiplying £1,200 by 5 directly instead of first finding the value of one part.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (d) 19% — Method: write each decrease as a multiplier, multiply the multipliers, then compare the result with 100%. Working: a 10% decrease is a multiplier of 0.9, so the two reductions together give 0.9 × 0.9 = 0.81; the final price is 81% of the original, so the price has fallen by 100% − 81% = 19%. Answer: an overall decrease of 19%. The distractors: 20% comes from adding the two reductions, 10% + 10%, which charges the second 10% against the original price instead of against the already reduced price; 21% comes from using the increase multiplier by mistake, since 1.1 × 1.1 = 1.21, and reading that 21% as a decrease; 81% is the percentage of the original price still being paid, not the percentage taken off.
- (d) 400 — The area scale factor is the length scale factor squared: 20² = 400, so the real car's surface area is 400 times the model's. 20 comes from using the length scale factor itself, without squaring it. 8000 comes from cubing the length scale factor (20³), instead of squaring it — cubing is the rule for volume, not area. 40 comes from doubling the length scale factor (2 × 20), instead of squaring it.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (c) 450 g — Method: use the amount of butter given to find the value of one part of the ratio, then find the mass of flour, and finally add flour and butter to get the total. Working: 180 g of butter is 2 parts, so one part is 180 ÷ 2 = 90 g. The flour is 3 parts, so 3 × 90 = 270 g, and the total mass is 270 + 180 = 450 g. So the baker can make 450 g of pastry. Distractor 270 g is only the mass of flour, forgetting to add the butter back on. Distractor 300 g comes from treating the 180 g as 3 parts instead of 2, swapping which ratio number matches the butter. Distractor 540 g comes from multiplying 180 by 3 directly instead of first finding the value of one part.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (b) 12 — Since y is directly proportional to √x, y = k√x. Using x = 4, y = 8: √4 = 2, so 8 = k × 2, giving k = 8 ÷ 2 = 4. The equation is y = 4√x. When x = 9: √9 = 3, so y = 4 × 3 = 12. Treating the relationship as if y were proportional to x itself, rather than to √x, gives k = 8 ÷ 4 = 2 and then y = 2 × 9 = 18, which is a different relationship. Multiplying k by the new x-value instead of by its square root gives y = 4 × 9 = 36, skipping the square root altogether. Reporting √9 on its own, without multiplying by k, gives only 3, not the value of y. When x = 9, y = 12.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) 2:3 — The white paint is 5 − 2 = 3 litres. The ratio of blue paint to white paint is 2 : 3, which has no common factor, so it is already in simplest form. Getting 2 : 5 compares the blue paint to the total amount of shade instead of to the white paint. Getting 3 : 2 has the two parts the wrong way round. Getting 5 : 3 uses the total amount of shade instead of the blue paint as the first part.
- (a) 20% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is 84 − 70 = 14 marks, and 14 ÷ 70 = 0.2, so 0.2 × 100 = 20. Answer: an increase of 20%. The distractors: 14% comes from quoting the 14 mark increase as though marks and per cent were the same thing; 17% comes from dividing the 14 by the new mean 84 instead of by the original 70, which gives 17% to the nearest per cent; 120% is the new mean written as a percentage of the old one, which is the whole of the new mean rather than the increase.
- (c) 15 — Method: the number of cakes is in direct proportion to the mass of flour, so find the multiplier between the two masses and apply it to the number of cakes. Working: 6 ÷ 2 = 3, so there is three times as much flour, and 5 × 3 = 15. Answer: 15. The distractors: 10 comes from multiplying the 5 cakes by 2, the mass in the recipe, instead of by the multiplier 3; 20 comes from multiplying by the difference 6 − 2 = 4, treating a proportion problem as a difference problem; 12 comes from rounding 5 ÷ 2 down to 2 cakes per kilogram and working out 6 × 2.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (d) 40 — Substitute x = 5 and y = 8 into y = k ÷ x to get 8 = k ÷ 5, so k = 8 × 5 = 40. Getting 13 comes from adding the two numbers (5 + 8) instead of multiplying. Getting 1.6 comes from dividing 8 by 5 instead of multiplying. Getting 3 comes from subtracting the two numbers (8 − 5) instead of multiplying.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (b) £16 — Since cost is proportional to the square root of diameter, C = k√d. Using d = 9, C = 12: √9 = 3, so 12 = k × 3, giving k = 12 ÷ 3 = 4. The equation is C = 4√d. When d = 16: √16 = 4, so C = 4 × 4 = 16. Halving the new diameter instead of taking its square root gives 16 ÷ 2 = 8, and then C = 4 × 8 = 32 — halving a number is not the same as taking its square root, as √16 = 4, not 8. Multiplying k by the diameter itself instead of by its square root gives C = 4 × 16 = 64, skipping the square root altogether. Reporting √16 on its own, without multiplying by k, gives only 4, not the cost. The cost of manufacturing a lens of diameter 16 mm is £16.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (b) 1 : 1.875 — To write a ratio in the form 1 : n, divide both parts by the first part, 8: 8 ÷ 8 = 1 and 15 ÷ 8 = 1.875, giving 1 : 1.875. Giving 1 : 0.53 divides the wrong way round, computing 8 ÷ 15 instead of 15 ÷ 8. Giving 1.875 : 1 has the two parts of the answer swapped, which is the form n : 1, not 1 : n. Giving 8 : 1.875 divides only the second part by 8, so the first part is still 8, not 1.
- (b) 4 — Method: find the length scale factor by taking the cube root of the volume scale factor, then square it to get the area scale factor. Working: 8 = 2³, so the length scale factor is 2, and the area scale factor is 2² = 4. Answer: 4. 8 comes from using the volume scale factor itself as if it were the area scale factor. 64 comes from squaring the volume scale factor, 8² = 64, instead of first taking its cube root. 2 comes from correctly finding the length scale factor but then forgetting to square it.
- (b) 5 litres — Method: adding water changes the total volume but adds no salt, so work out the volume of salt, then the total volume that makes that salt 20% of the mixture, then the extra water. Working: 30% of 10 litres is 0.3 × 10 = 3 litres of salt. For the same 3 litres to be 20% of the new mixture, the new total volume is 3 ÷ 0.2 = 15 litres. The water added is the extra volume, 15 − 10 = 5 litres. Answer: 5 litres. The distractors: 3 litres is the volume of salt in the solution, which is the first step and not what the question asks for; 15 litres is the total volume of the new mixture, which counts the 10 litres already in the container as water that was poured in; 2 litres comes from taking 20% of the original 10 litres, applying the new percentage to the old volume instead of to the new one.
- (d) 3 : 8 — Multiply both parts by 4 to clear the decimal: 0.75 × 4 = 3 and 2 × 4 = 8, giving 3 : 8, which has no common factor other than 1. Giving 75 : 200 multiplies by 100 instead of 4, and has not then been simplified down to 3 : 8. Giving 0.75 : 2 has not been converted into whole numbers at all. Giving 3 : 2 converts the first part correctly but leaves the second part unscaled.
What is on this worksheet?
The sheet holds 24 questions drawn from the MathsUK bank — the content area covered: Ratio, proportion and rates of change (statements R4, R5, R9, R10, R11, R12, R13). It is pitched at GCSE Higher and takes about 45 minutes to work through in full. It is built for independent practice, with full answers at the end for self-marking.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 24 questions before checking — about 45 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 24 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- 🎯 Grade 4 pass booster · 25 questions · ~40 min
- 📈 Quadratics: factorise, complete the square, formula · 24 questions · ~45 min
- ⭕ Circle theorems practice · 18 questions · ~40 min