12 short questions across all six content areas, designed as a lesson starter or a daily warm-up.
⏱️ Ten-minute starters — Foundation
Twelve short questions, two from each of the six content areas: number, algebra, ratio, geometry, probability and statistics. Nothing here needs more than a minute, and nothing needs a calculator. It is built as a lesson starter — print it, hand it out, take ten minutes, mark it together — and it works just as well as a daily warm-up at home in the fortnight before a mock. The value is in the spread rather than the depth: a student who has spent a week on algebra can find out in ten minutes what a week away from statistics has cost. Generate a new sheet whenever you want a fresh twelve on the same pattern.
- 1.To make orange paint, red and yellow paint are mixed in the ratio 6:15. Write the amount of red paint as a fraction of the amount of yellow paint, in its simplest form.
- 2.Triangles ABE and CDE share the vertex E, where lines AC and BD cross at E. AE equals CE, and BE equals DE. Angle AEB and angle CED are formed as vertically opposite angles where the lines cross. Which condition proves that triangle ABE is congruent to triangle CDE?
- 3.Tom is asked to classify the statement 5(2x − 3) = 10x − 15. Which statement about it is correct?
- 4.A sculptor makes two mathematically similar statues. The smaller statue is 20 cm tall and 80 ml of varnish covers its surface. The larger statue is 50 cm tall. Work out how much varnish is needed to cover the surface of the larger statue.
- 5.A square has sides of length y cm. Write down an expression for the perimeter of the square.
- 6.Triangle ABC has AB = 6 cm, BC = 8 cm and angle B = 90°. Triangle XYZ has XY = 6 cm, YZ = 8 cm and angle Y = 90°. Which congruence statement correctly shows the matching vertices?
- 7.A tank holds 3.2 m³ of water. Work out this volume in litres.
- 8.A straight-line graph shows the cost, C pounds, of hiring a small van for m miles driven. The line passes through the origin and the point (25, 20). Work out the gradient of the line.
- 9.A garden centre's sales, in thousands of pounds, at the end of each quarter last year were: quarter 1 — 18, quarter 2 — 34, quarter 3 — 30, quarter 4 — 22. Work out the increase in sales from quarter 1 to the quarter with the highest sales.
- 10.Work out 50% of 60.
- 11.A charity fundraiser runs a game using a spinner with 5 equal sections numbered 1 to 5. A player wins a £4 prize if the spinner lands on 5, and wins nothing otherwise. It costs £1 to play, and the game is played 100 times during the fundraiser. Decide which statement correctly describes the game.
- 12.The point (−4, 7) is moved 4 units to the right and 9 units down. Write down the coordinates of the point it reaches.
Answer key
- (b) 2/5 — The ratio red : yellow is 6:15, so write red over yellow: 6/15. Divide both numbers by their highest common factor, 3: 6÷3 = 2, 15÷3 = 5, giving 2/5. (5/2 comes from writing the ratio the wrong way round, yellow over red, 15/6, which simplifies to 5/2. 2/7 comes from comparing the red paint to the total amount of paint, 6 parts out of 21. 5/7 comes from comparing the yellow paint to the total amount of paint, 15 parts out of 21.)
- (d) SAS, vertically opposite angle included — AE equals CE and BE equals DE give two pairs of equal sides, and angle AEB equals angle CED because they are vertically opposite angles formed where AC and BD cross; vertically opposite angles are always equal without needing to be measured. This included angle sits between the two known sides in each triangle, giving SAS, so 'SAS, vertically opposite angle included' is correct. 'ASA, vertically opposite angle at E' is wrong because ASA needs two pairs of equal angles with the side between them, but only one angle is known in each triangle here, and the two other known facts are sides, not angles. 'SSS, three equal side pairs' is wrong because only two pairs of sides are given; there is no third pair of equal sides. 'Cannot prove — no angle measured' is wrong because vertically opposite angles are always equal automatically when two straight lines cross, so no separate measurement is needed.
- (b) An identity, since both sides are equal for every x. — Expanding the left-hand side: 5(2x−3)=10x−15, which is exactly the same as the right-hand side for every value of x, so it is an identity, not an equation that is only true for one particular x. A candidate who treats every equals-sign statement as an equation, without checking whether it holds for all values of x, would choose the equation option. A candidate who mistakes it for a formula is assuming it relates two different letters or quantities, but only x appears — there is no second variable such as area or cost — so it is not a formula. A candidate who mistakes it for an inequality is assuming the two sides are only equal for particular values of x, but expanding shows they are identical for every value, not just some.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (d) 4y — Method: the perimeter is the total distance round the outside of the shape, and a square has four sides all of the same length. Working: the four sides are y, y, y and y, so the perimeter is y + y + y + y, which is written as 4y. Answer: 4y. The distractors: 2y comes from adding only two of the four sides, as if the square were being treated like a rectangle with one length and one width; y² comes from working out the area of the square, y × y, instead of its perimeter; y + 4 comes from adding 4 to the side length instead of multiplying the side length by 4.
- (c) ABC ≅ XYZ — Method: match each vertex in ABC to its corresponding vertex in XYZ, using the equal sides and angles given, then write the letters in that matching order. Working: AB matches XY, BC matches YZ, and angle B matches angle Y, so A corresponds to X, B corresponds to Y, and C corresponds to Z, giving ABC ≅ XYZ. Options: 'ABC ≅ ZYX' puts Z in A's position, but A corresponds to X, not Z; 'ABC ≅ YXZ' puts Y in A's position, but A corresponds to X; 'ABC ≅ ZXY' puts Z in A's position and X in B's position, neither of which is correct. Answer: ABC ≅ XYZ.
- (c) 3200 — Method: to change cubic metres to litres, multiply by 1000. Working: 3.2 × 1000 = 3200. Answer: 3200 litres. A candidate who multiplies by 100 instead of 1000 gets 320. A candidate who multiplies by 10000 instead of 1000 gets 32000. A candidate who does not convert at all gives 3.2.
- (a) 0.8 — The gradient of a line through the origin is the y-coordinate of a point divided by its x-coordinate: 20 ÷ 25 = 0.8. Choosing 1.25 comes from dividing the wrong way round, 25 ÷ 20. Choosing 20 comes from reading off the cost at the point instead of dividing it by the number of miles. Choosing 5 comes from subtracting the two coordinates (25 − 20) instead of dividing them.
- (a) £16,000 — Method: first find the quarter with the highest sales figure, then subtract quarter 1's sales from it — remembering that every figure is given in THOUSANDS of pounds. Working: the highest sales figure is quarter 2, at £34,000 (34 thousand pounds). The increase from quarter 1 is £34,000 − £18,000 = £16,000. Giving £34,000 reads off the highest sales figure on its own, without subtracting quarter 1's sales — that is the highest quarter's total, not the increase. Giving £12,000 uses quarter 3's sales, 30, the SECOND-highest figure, instead of quarter 2's 34, the actual highest — 30 − 18 = 12, but quarter 3 is not the quarter with the highest sales. Giving £16 gets the subtraction right, 34 − 18 = 16, but forgets that every figure in the question is in thousands of pounds, so the increase is £16,000, not £16. Always identify the correct quarter FIRST, and always check the units the numbers are given in before writing your final answer.
- (d) 30 — Method: 50% is one half, so 50% of a quantity is the quantity divided by 2. Working: 60 ÷ 2 = 30. Answer: 30. The distractors: 120 comes from multiplying by 2 instead of dividing; 3000 comes from multiplying by 50 without dividing by 100; 6 comes from finding 10% instead of 50%.
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
- (b) (0, −2) — Method: a translation acts on the two coordinates separately: moving right or left changes the x-coordinate only, moving up or down changes the y-coordinate only, and right and up add while left and down subtract. Working: the point starts at (−4, 7); moving 4 units to the right gives an x-coordinate of −4 + 4 = 0; moving 9 units down gives a y-coordinate of 7 − 9 = −2. Answer: (0, −2). The distractors: (5, 3) comes from pairing each number with the wrong coordinate, adding 9 to −4 and taking 4 from 7; (0, 16) comes from treating 'down' as an addition, giving 7 + 9 = 16 for the second coordinate; (−8, −2) comes from treating 'to the right' as a subtraction, giving −4 − 4 = −8 for the first coordinate.
What is on this worksheet?
The sheet holds 12 questions drawn from the MathsUK bank — the content areas covered: Number, Algebra, Ratio, proportion and rates of change, Geometry and measures, Probability, Statistics. It is pitched at GCSE Foundation and takes about 10 minutes to work through in full. It works as a class handout, a homework, or a warm-up before a test.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 12 questions before checking — about 10 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 12 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- ✏️ Paper 1 non-calculator warm-up — Foundation · 20 questions · ~25 min
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- 🎯 Grade 4 pass booster · 25 questions · ~40 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min