12 short questions across all six content areas, designed as a lesson starter or a daily warm-up.
⏱️ Ten-minute starters — Foundation
Twelve short questions, two from each of the six content areas: number, algebra, ratio, geometry, probability and statistics. Nothing here needs more than a minute, and nothing needs a calculator. It is built as a lesson starter — print it, hand it out, take ten minutes, mark it together — and it works just as well as a daily warm-up at home in the fortnight before a mock. The value is in the spread rather than the depth: a student who has spent a week on algebra can find out in ten minutes what a week away from statistics has cost. Generate a new sheet whenever you want a fresh twelve on the same pattern.
- 1.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 2.A water tank has a capacity of 500 litres. It currently holds 350 litres of water. Write the amount of empty space in the tank as a fraction of the tank's capacity. Give your answer in its simplest form.
- 3.A fair spinner has 6 equal sections, and 2 of the sections are coloured purple. The spinner is spun 180 times. Work out how many times you would expect it to land on purple.
- 4.The ratio of the amount of money Harry has to the amount of money Isla has is 5:3. Harry has £35. Work out how much money Isla has.
- 5.y = 3x − 2. Work out the value of y when x = 4.y = 3x − 2
- 6.A quality inspector tests 145 light bulbs and finds that 33 are faulty. Work out the relative frequency of a bulb being faulty, as a percentage correct to 1 decimal place.
- 7.A section of a kitchen wall has an area of 45,000 cm². Work out the area of this section in m².
- 8.Work out the value of 5m² + 3m when m = −2.4
- 9.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 10.180 people entered a fun run. A frequency tree splits them into 108 adults and the rest children. It then splits each of those groups into those who finished and those who did not. 99 of the adults finished, and 153 of the 180 people finished altogether. Work out how many children did not finish.
- 11.A fair spinner has 8 equal sections. 3 of the sections are red. The spinner is spun 240 times. Work out how many times you would expect it to land on red.
- 12.A rectangular bookmark measures 2 cm by 25 cm. Work out the area of the bookmark.
Answer key
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (b) 3/10 — Work out the empty space: 500 − 350 = 150 litres. Form the fraction 150/500; both numbers share a factor of 50, so 150 ÷ 50 = 3 and 500 ÷ 50 = 10, giving 3/10. 7/10 comes from writing the fraction of the tank that is full (350/500), instead of the empty space. 1/2 comes from miscalculating 500 − 350 as 250 instead of 150. 3/7 comes from comparing the empty space with the water held (150/350), instead of with the tank's total capacity.
- (b) 60 — The probability of landing on purple in a single spin is 2/6. The expected number of times it lands on purple in 180 spins is 180 × 2/6 = 60. A candidate who answers 90 has used 3/6 instead of 2/6, miscounting the purple sections as 3. A candidate who answers 30 has used 1/6 instead of 2/6, forgetting one of the two purple sections. A candidate who answers 120 has used the probability of NOT landing on purple, 4/6, by mistake.
- (c) £21 — Method: the two amounts are in the same ratio as 5:3, so write 5:3 = 35:x, find the value of one part and then take the number of parts asked for. Working: Harry's £35 is 5 parts, so one part is £35 ÷ 5 = £7; Isla has 3 parts, so 3 × £7 = £21. Answer: £21. The distractors: £7 is the value of a single part, given as Isla's share instead of being multiplied by the 3 parts she has; £28 comes from finding one part correctly and then working out £35 − £7, subtracting one part from Harry's money instead of taking three parts; £33 comes from treating the ratio additively — the parts differ by 5 − 3 = 2, so £2 is taken off Harry's £35, but a ratio compares by multiplying, not by subtracting.
- (c) 10 — Method: substitute the value of x, then follow the order of operations, carrying out the multiplication before the subtraction. Working: with x = 4 the rule reads y = 3 × 4 − 2; the multiplication gives 3 × 4 = 12, and taking 2 away gives 12 − 2. Answer: y = 10. The distractors: 14 comes from adding the 2 instead of subtracting it; 12 comes from working out 3 × 4 and stopping there, leaving the −2 unused; 6 comes from subtracting first, 4 − 2, and multiplying the result by 3.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (d) 4.50 m² — 1 m² = 100 cm × 100 cm = 10,000 cm², so to convert cm² to m² you divide by 10,000: 45,000 ÷ 10,000 = 4.50 m². Dividing by 100 instead of 10,000, treating area like a length conversion, gives 45,000 ÷ 100 = 450.00 m², a common mistake since 1 m = 100 cm. Multiplying by 100 instead of dividing gives 45,000 × 100 = 4500000.00 m², using the conversion factor the wrong way round entirely. Dividing by 100,000 instead of 10,000 gives 0.45 m², an extra factor of 10 too far.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (d) 18 — Method: a frequency tree can be filled from either end, because a pair of branches adds up to the number above it and the matching end branches add up to the total for that outcome. Working: the children number 180 − 108 = 72. Of the 153 finishers, 99 were adults, so the children who finished number 153 − 99 = 54. Along the children's branch, 72 − 54 = 18 children did not finish. Answer: 18 children did not finish. The distractors: 27 is 180 − 153 and counts everyone who did not finish, adults included; 9 is 108 − 99 and counts only the adults who did not finish; 54 is the number of children who did finish, which is the branch next to the one asked for.
- (c) 90 — Method: over many future trials the expected number of successes is the number of trials multiplied by the probability of a success. Working: the sections are equal, so each is equally likely and P(red) is 3 out of 8. Over 240 spins the expected number of reds is 240 × 3 ÷ 8 = 90. Answer: about 90 of the spins would be expected to land on red. The distractors: 150 uses the 5 sections that are not red, 240 × 5 ÷ 8 = 150, which is the expected number of spins that do not land on red; 30 is 240 ÷ 8 and is the expected count for one single section; 80 comes from dividing by the number of red sections instead of by the number of sections, 240 ÷ 3 = 80.
- (b) 50 cm² — Method: the area of a rectangle is length × width. Working: 2 × 25 = 50. Answer: 50 cm². The distractors: 54 cm comes from working out the perimeter, 2 × (2 + 25), which is a length and not an area; 27 cm comes from adding the two sides, 2 + 25, instead of multiplying them; 25 cm² comes from halving the product, 50 ÷ 2, which is the rule for the area of a triangle rather than of a rectangle.
What is on this worksheet?
The sheet holds 12 questions drawn from the MathsUK bank — the content areas covered: Number, Algebra, Ratio, proportion and rates of change, Geometry and measures, Probability, Statistics. It is pitched at GCSE Foundation and takes about 10 minutes to work through in full. It works as a class handout, a homework, or a warm-up before a test.
How to use the sheet well
- Print it or open it on screen — both work. Printing is A4; the screen view fits phones and tablets.
- Do all 12 questions before checking — about 10 minutes is the guide, but there is no time pressure.
- Check the answers — press “Show answers” or print the answer page separately.
- Redo the questions you got wrong — twice as effective as doing 12 fresh ones.
- “New questions” — builds a fresh sheet on the same statements, so you can practise again without repeats.
Why this sheet helps
MathsUK worksheets use questions graded by difficulty and a fair spread of correct-answer positions (the answer is not always (a)) — so the student really has to think about each question rather than guess a pattern. Every question is tagged to a DfE content statement and checked before it enters the bank. The answers come with a step-by-step explanation, not just a value — so a wrong answer becomes a lesson.
Similar worksheets worth a look
- ✏️ Paper 1 non-calculator warm-up — Foundation · 20 questions · ~25 min
- 🧮 Paper 1 non-calculator warm-up — Higher · 20 questions · ~25 min
- 🎯 Grade 4 pass booster · 25 questions · ~40 min
- ⚖️ Foundation to Higher crossover check · 20 questions · ~35 min