Printable · GCSE Foundation · ages 14-16
Gradients and intercepts of linear functions worksheet — GCSE Foundation
Fifteen questions on "gradients and intercepts of linear functions" — DfE statement A10. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Gradients and intercepts of linear functions worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A straight line passes through the points (0, 4) and (1, 9). Write down the gradient of the line.
- 2.Isla says that the lines y = 2x + 1 and y = −2x + 3 are parallel. Write down the statement that gives the correct answer for the correct reason.y = 2x + 1y = -2x + 3
- 3.A zip-line runs from a platform 25 m high to a landing point 5 m high, over a horizontal distance of 40 m. Work out the gradient of the zip-line.
- 4.A printer starts a job with 480 sheets of paper loaded and prints at a steady rate. The number of sheets left, S, after t minutes is given by S = 480 − 24t. Work out how many minutes it takes for the paper to run out completely.
- 5.Write down the y-intercept of the line with equation y = 3x + 8.y = 3x + 8
- 6.Work out the gradient of the straight line with equation 3y = 12 − 6x.
- 7.A ramp rises 3 m over a horizontal distance of 12 m. Work out the gradient of the ramp.
- 8.Work out the gradient of the straight line that passes through the points (−1, 5) and (3, −7).
- 9.The graph of a straight line has equation y = 4x − 5. Beth says the y-intercept is 4. Work out the correct y-intercept.y = 4x − 5
- 10.The graph of y = mx + 6 passes through the point (−2, 0). Work out the value of m.
- 11.A hot air balloon is at a height of 20 m and rises at a steady rate. After 4 minutes it is at a height of 52 m. Work out the rate at which the balloon rises, in metres per minute.
- 12.Work out the coordinates of the point where the graph of y = 2x − 6 crosses the x-axis.y = 2x − 6
- 13.The line y = 3x + 6 meets the x-axis at one point. Work out the coordinates of that point.y = 3x + 6
- 14.A plumber charges a call-out fee plus an hourly rate for a job. The total cost, £C, for a job lasting h hours is given by the formula C = 40 + 25h. What does the number 40 represent in this formula?
- 15.A tank already contains some water and is then filled at a constant rate. After 2 minutes it contains 50 litres in total; after 7 minutes it contains 150 litres in total. Work out the rate at which water is added, in litres per minute.
Answer key
- (c) 5 — Method: gradient = change in y ÷ change in x between the two points. Working: change in y = 9 − 4 = 5, change in x = 1 − 0 = 1, so gradient = 5 ÷ 1 = 5. Answer: the gradient is 5. 13 comes from adding the y-values instead of subtracting them. 4 comes from using the y-value at x = 0 instead of the change in y between the two points. 1/5 comes from inverting the gradient, dividing the change in x by the change in y instead of the other way round.
- (b) No, because their gradients are 2 and −2 — Method: two lines are parallel exactly when their gradients are equal as signed numbers, so m is read from each equation written in the form y = mx + c and the two are compared. Working: y = 2x + 1 has gradient 2 and y = −2x + 3 has gradient −2; those are not equal, so the lines are not parallel, and indeed one slopes upwards while the other slopes downwards. Answer: No, because their gradients are 2 and −2. The distractors: saying yes because both gradients have size 2 comes from comparing the sizes of the gradients and ignoring their signs; saying yes because the gradients add to 0 comes from using a sum of zero as the test for parallel lines instead of equality of gradients; saying no because the y-intercepts are 1 and 3 reaches the right verdict by the wrong route, since the intercepts decide where the lines sit rather than whether they are parallel.
- (b) −0.5 — Method: gradient = change in height ÷ horizontal distance, and the height decreases so the change is negative. Working: change in height = 5 − 25 = −20, horizontal distance = 40, so gradient = −20 ÷ 40 = −0.5. Answer: the gradient is −0.5. 0.5 comes from dropping the negative sign, ignoring that the zip-line descends. 2 comes from inverting the gradient, dividing the horizontal distance by the drop in height instead of the other way round. −0.8 comes from dividing the drop by the platform height, 25, instead of by the horizontal distance, 40.
- (a) 20 — Method: the paper has run out when S = 0, so substitute S = 0 into the equation and solve for t. Working: 0 = 480 − 24t, so 24t = 480, and t = 480 / 24 = 20. Answer: it takes 20 minutes. The value 480 comes from giving the starting number of sheets, the intercept of the equation, instead of solving for t. The value 456 comes from working out 480 − 24 and stopping after one step instead of solving the equation fully. The value 0.05 comes from inverting the division, working out 24 / 480 instead of 480 / 24.
- (d) 8 — Method: compare the equation with y = mx + c, where c is the y-intercept. Working: in y = 3x + 8, the constant term is 8. Answer: the y-intercept is 8. 3 comes from confusing the y-intercept with the gradient. −8 comes from a sign error, treating the constant term as negative. 11 comes from wrongly adding the gradient and the constant term together.
- (c) −2 — Method: rearrange the equation into the form y = mx + c, then read off the gradient. Working: 3y = 12 − 6x, so dividing every term by 3 gives y = 4 − 2x, so the gradient is −2. Answer: the gradient is −2. 2 comes from dropping the negative sign after dividing by 3. 4 comes from using the y-intercept, 4, instead of the gradient. −6 comes from reading off the coefficient of x before dividing the whole equation by 3.
- (a) 0.25 — Method: gradient = vertical rise ÷ horizontal distance. Working: gradient = 3 ÷ 12 = 0.25. Answer: the gradient of the ramp is 0.25. 4 comes from inverting the gradient, dividing the horizontal distance by the vertical rise instead of the other way round. 9 comes from subtracting the rise from the horizontal distance instead of dividing. 36 comes from multiplying the rise and the horizontal distance instead of dividing.
- (b) −3 — Method: the gradient of a straight line is the change in y divided by the change in x, with the two coordinates taken in the same order in the numerator as in the denominator. Working: going from (−1, 5) to (3, −7), the change in y is −7 − 5 = −12 and the change in x is 3 − (−1) = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3. The distractors: 3 comes from subtracting the y-coordinates in one order and the x-coordinates in the other, giving 12 ÷ 4; −1/3 comes from dividing the change in x by the change in y instead of the other way round, giving 4 ÷ (−12); −6 comes from working out 3 − (−1) as 3 − 1 = 2, so that the change in y is divided by 2 rather than by 4.
- (d) −5 — In y = mx + c, the y-intercept is c, the constant term, not the coefficient of x. Here c = −5, so the y-intercept is −5. 4 is Beth's value, the coefficient of x (the gradient), not the intercept. 5 comes from taking the constant term but dropping its negative sign. −4 comes from taking the gradient but giving it the sign of the intercept.
- (c) 3 — Method: a point that lies on a graph makes its equation true, so substituting the coordinates into y = mx + 6 leaves an equation in m alone. Working: substituting x = −2 and y = 0 gives 0 = m × (−2) + 6, which rearranges to −2m = −6, so m = (−6) ÷ (−2) = 3. Answer: 3. The distractors: −3 comes from dividing −6 by 2 and keeping the minus sign, overlooking that the divisor is negative too, so the two signs cancel; −2 comes from writing down the x-coordinate of the given point in place of the gradient; 6 comes from reading the constant in y = mx + 6 as the gradient, confusing m with c.
- (a) 8 — Method: rate = height gained ÷ time taken. Working: height gained = 52 − 20 = 32 m, time taken = 4 minutes, so rate = 32 ÷ 4 = 8 metres per minute. Answer: the rate is 8 metres per minute. 32 comes from working out the height gained but forgetting to divide by the time taken. 13 comes from dividing the final height, 52, by the time taken instead of the height gained. 5 comes from dividing the starting height, 20, by the time taken instead of the height gained.
- (d) (3, 0) — Method: every point on the x-axis has y-coordinate 0, so substituting y = 0 into the equation and solving gives the x-coordinate of the crossing point. Working: 0 = 2x − 6 gives 2x = 6, so x = 6 ÷ 2 = 3 and the graph crosses the x-axis at (3, 0). Answer: (3, 0). The distractors: (0, −6) is where the graph crosses the y-axis, found by substituting x = 0 rather than y = 0; (−3, 0) comes from moving the 6 across the equals sign without changing its sign, giving 2x = −6; (6, 0) comes from reading the constant straight off as the crossing point and never dividing by the gradient 2.
- (b) (−2, 0) — Method: a graph meets the x-axis where the y-value is 0, so setting y = 0 turns the equation into a linear equation in x. Working: 0 = 3x + 6 gives 3x = −6, so x = (−6) ÷ 3 = −2 and the meeting point is (−2, 0). Answer: (−2, 0). The distractors: (2, 0) comes from solving 3x = −6 and then dropping the minus sign from the result; (0, 6) is the y-axis crossing, found by substituting x = 0 instead of y = 0; (6, 0) comes from reading the constant 6 straight off as the x-coordinate, without dividing by 3 and without changing its sign.
- (d) The fixed call-out fee, charged before the hourly rate. — Method: compare the formula with C = (fixed charge) + (rate) × h, where the fixed charge is the part that does not depend on h. Working: in C = 40 + 25h, the term 25h depends on the number of hours, h, but 40 does not change however many hours the job takes. Answer: 40 is the fixed call-out fee. 'The hourly rate' confuses the fixed term with the coefficient of h, which is actually 25. 'The total cost for a job lasting 1 hour' comes from substituting h = 1 into the formula (40 + 25 = 65) rather than reading off the constant term. 'The number of hours worked before charging starts' wrongly treats the constant, which is in pounds, as if it were measured in hours.
- (b) 20 — The rate is the gradient: the change in litres divided by the change in time. From 2 to 7 minutes, the tank gains 150 − 50 = 100 litres over 7 − 2 = 5 minutes, so the rate is 100 ÷ 5 = 20 litres per minute. 100 comes from working out the change in litres but forgetting to divide by the change in time. 25 comes from using only the first reading, 50 ÷ 2, and ignoring the second reading entirely. 0.05 comes from dividing the change in time by the change in litres instead of the other way round, 5 ÷ 100.
Build your own mix at the worksheet builder.