Printable · GCSE Foundation · ages 14-16
Substitution into formulae worksheet — GCSE Foundation
Fifteen questions on "substitution into formulae" — DfE statement A2. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Answer key: Substitution into formulae worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 5 — Method: substitute the value into the formula, work out the index first and the addition afterwards. Working: x² = (−2) × (−2) = 4, so y = 4 + 1 = 5. Answer: 5. The distractors: −3 comes from squaring only the 2 and keeping the minus sign outside the index, giving −4 + 1; 1 comes from adding the 1 to x before squaring, giving (−2 + 1)²; 4 comes from squaring correctly but stopping there and never adding the 1.
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
- (c) £9.70 — F = 2.50 + 1.20 × 6 = 2.50 + 7.20 = £9.70. £7.20 comes from forgetting to add the £2.50 fixed charge. £10.20 comes from adding the 2.50 to the number of miles before multiplying by 1.20, 1.20 × (6 + 2.50). £22.20 comes from adding the fixed charge and the rate together first and then multiplying by the miles, (2.50 + 1.20) × 6.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (d) 1 hour 32 minutes — T = 40 × 1.8 + 20 = 72 + 20 = 92 minutes. Since 92 = 60 + 32, the cooking time is 1 hour 32 minutes. A candidate who rounds the mass to 2 kg before substituting gets 40 × 2 + 20 = 100 minutes = 1 hour 40 minutes. A candidate who forgets to add the 20 minutes gets 40 × 1.8 = 72 minutes = 1 hour 12 minutes. A candidate who multiplies the mass by (40 + 20) = 60 instead of substituting into the formula gets 1.8 × 60 = 108 minutes = 1 hour 48 minutes.
- (c) 26.6 — h² = 1.6² = 2.56, so B = 68 ÷ 2.56 = 26.5625, which rounds to 26.6 (1 d.p.). A candidate who forgets to square the height gets 68 ÷ 1.6 = 42.5. A candidate who squares the mass instead of the height gets 68² ÷ 1.6 = 2890.0. A candidate who truncates 26.5625 instead of rounding it gets 26.5.
- (b) 20 — F = 4s, so when s = 5, F = 4 × 5 = 20. 9 comes from adding 4 and 5 instead of multiplying, the mistake described in the question. 25 comes from squaring s (5²) instead of multiplying by 4. 45 comes from writing the digits 4 and 5 next to each other instead of carrying out the multiplication.
- (c) 14 — Substitute b = 6 into 3b − 4: 3 × 6 − 4 = 18 − 4 = 14. 5 comes from treating 3b as 3 + b instead of 3 × b, giving 3 + 6 − 4. 6 comes from subtracting 4 from b before multiplying by 3, 3 × (6 − 4). 18 comes from working out 3 × 6 correctly but forgetting to subtract the 4.
- (a) 18 — Method: substitute the value, apply the index before the multiplication, and remember that a negative number multiplied by itself gives a positive result. Working: x² = (−3) × (−3) = 9, and then 2 × 9 = 18. Answer: 18. The distractors: −18 comes from squaring only the 3 and leaving the minus sign outside the index, giving 2 × (−9); 36 comes from multiplying 2 by −3 first and squaring afterwards, giving (−6)²; −12 comes from reading x² as 2x, so that the calculation becomes 2 × 2 × (−3).
- (c) 8 — Method: substitute x = 3 into each expression in turn, working out the bracket first in the expression that has one and the multiplication first in the expression that does not. Working: 2(x + 1) gives 2 × (3 + 1) = 2 × 4 = 8, and 2x + 2 gives 2 × 3 + 2 = 6 + 2 = 8, so both expressions take the value 8, as Grace claims. Answer: 8. The distractors: 7 comes from multiplying only the x inside the bracket and then adding the 1, giving 2 × 3 + 1; 10 comes from reading 2x + 2 as 2(x + 2) and working out 2 × 5; 6 comes from substituting into 2x and stopping before the 2 is added.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (d) 12 — Method: substitute the value into both terms, remembering that subtracting a negative number has the same effect as adding the matching positive number. Working: n² = (−3) × (−3) = 9, and subtracting n means subtracting −3, which adds 3, so the calculation is 9 + 3 = 12. Answer: 12. The distractors: 6 comes from subtracting 3 rather than subtracting −3, giving 9 − 3; −6 comes from squaring −3 as −9 while still adding the 3, giving −9 + 3; −3 comes from reading n² as 2n, giving 2 × (−3) = −6 and then −6 + 3.
- (d) 7 — Method: substitute both values, work out the two multiplications first, and only then subtract. Working: 3a = 3 × 5 = 15 and 2b = 2 × 4 = 8, so the expression becomes 15 − 8 = 7. Answer: 7. The distractors: 23 comes from adding the two products instead of subtracting, giving 15 + 8; −7 comes from subtracting the wrong way round and working out 8 − 15; 52 comes from working from left to right instead of following the order of operations, giving 3 × 5 = 15, then 15 − 2 = 13, then 13 × 4.
- (a) 17 — Substitute a = 3 into 5a + 2: 5 × 3 + 2 = 15 + 2 = 17. 10 comes from treating 5a as 5 + a instead of 5 × a, giving 5 + 3 + 2. 25 comes from adding the 2 to a before multiplying by 5, 5 × (3 + 2). 15 comes from working out 5 × 3 correctly but forgetting to add the 2.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
Build your own mix at the worksheet builder.