- 1.Look at the statement 2x + 5 = 17. Considering whether it is an expression, an equation, a formula, or an identity, which classification is correct?
- 2.Solve 2x² − 32 = 0.
- 3.On Monday, a runner covers 15 km in 2.5 hours. On Tuesday, she covers 12 km in 1.5 hours. Using the formula speed = distance ÷ time, work out on which day she ran faster, and by how much.
- 4.The graph of y = 20/x is drawn for x > 0. As the value of x increases, what happens to the value of y?
- 5.A plumber charges a call-out fee of £30 plus £25 for each hour worked. The total bill for a job was £130. Work out how many hours the plumber worked.
- 6.A rectangle has width x cm. Its length is 3 cm more than its width. The perimeter of the rectangle is 38 cm. Form an equation and solve it to find x.
- 7.A car's speed-time graph shows the following: its speed increases steadily from 0 m/s to 20 m/s over the first 10 seconds, then stays constant at 20 m/s for the next 15 seconds. Work out the total distance travelled in the first 25 seconds.
- 8.The formula for the perimeter of a square is P = 4s, where s is the side length. Make s the subject of the formula.
- 9.A cyclist's distance-time graph shows the following: she travels 12 km in the first 30 minutes at a steady speed, then rests for 30 minutes, then travels a further 8 km in the next 15 minutes. Work out her average speed, in km/h, for the whole journey.
- 10.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 11.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 12.A park is drawn on a grid in which 1 unit represents 1 km. The car park is at the point (0, 0) and the lake is at the point (3, 5). Work out the direct distance, in km, from the car park to the lake, giving your answer to 1 decimal place.
- 13.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 14.Priya buys b balloons for a party. Each balloon costs 15p. Write down an expression for the total cost, in pence.
- 15.Write down the gradient of the line with equation y = 6 + 4x.
Answer key
- (d) An equation, true for one value of x — 2x + 5 = 17 is only true when x = 6, so it is an equation. A candidate who ignores the equals sign and focuses only on the x terms and numbers present picks the expression option. A candidate who sees an equals sign and assumes it must relate two different quantities, as a formula does, picks that option, missing that there is only one quantity, x, involved here. A candidate who wrongly checks whether both sides look similar in structure rather than testing specific values picks the identity option, missing that the two sides are not equal for every value of x.
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (b) 8 — The perimeter is 2(x + (x + 3)) = 4x + 6, so 4x + 6 = 38, which gives 4x = 32 and x = 8. A candidate who forgets the '+3' and treats the rectangle as a square, solving 2(2x) = 38, gets x = 9.5. A candidate who forgets to double the sum of the sides, solving 2x + 3 = 38, gets x = 17.5. A candidate who uses 3x instead of x + 3 for the length, solving 2(x + 3x) = 38, gets x = 4.75.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
- (c) s = P / 4 — Method: undo the multiplication by 4 by dividing both sides by 4. Working: P = 4s, so dividing both sides by 4 gives s = P / 4. The value s = 4P comes from multiplying by 4 instead of dividing — using the wrong inverse operation. The value s = P + 4 comes from adding 4 instead of dividing. The value s = P − 4 comes from subtracting 4 instead of dividing.
- (c) 16 km/h — Method: total distance = 12 + 8 = 20 km. Total time = 30 + 30 + 15 = 75 minutes = 1.25 hours. Average speed = total distance ÷ total time = 20 ÷ 1.25 = 16 km/h. Distractor origins: 20 km/h gives the total distance without ever dividing by the total time; 24 km/h uses only the speed of the first stage (12 km in 30 minutes), ignoring the second stage and the rest; 28 km/h averages the two separate stage speeds, 24 km/h and 32 km/h, instead of using total distance over total time.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (a) 5.8 — The horizontal distance is 3 and the vertical distance is 5, so using Pythagoras' theorem the distance is √(3² + 5²) = √34 = 5.8 (1 d.p.). A candidate who adds the two differences instead of using Pythagoras gets 3 + 5 = 8.0. A candidate who works out 3² + 5² = 34 but forgets to take the square root gets 34.0. A candidate who subtracts the squares instead of adding them gets √(5² − 3²) = √16 = 4.0.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (d) 15b — Method: each balloon costs 15p, so b balloons cost 15 × b pence. Working: 15 × b = 15b. Answer: 15b. b + 15 comes from treating the 15p as a one-off addition rather than a rate applied to every balloon. b − 15 comes from misreading the situation as a discount rather than a cost per balloon. b/15 comes from dividing instead of multiplying, swapping the two operations.
- (d) 4 — Method: compare the equation with the general form y = mx + c after writing the x term first, then read off the coefficient of x. Working: y = 6 + 4x can be written as y = 4x + 6, so comparing with y = mx + c gives m = 4. Answer: the gradient is 4. The value 6 comes from reading off the constant, written first in the equation, and treating it as the gradient because it comes before the x term. The value 10 comes from adding the two numbers in the equation, 6 + 4, instead of reading off the coefficient of x. The value 24 comes from multiplying the two numbers in the equation, 6 × 4, instead of reading off the coefficient of x.