Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A phone plan costs a fixed £15 per month plus 8p per minute of calls. In one month, Jamal's bill was £23.80. Form an equation using m for the number of minutes, and solve it to find how many minutes Jamal used that month.
- 2.Work out the value of 3b − 4 when b = 6
- 3.A taxi firm charges a fixed fee of £3.50 plus £2.20 per mile. Work out the total cost of a journey of 6 miles.
- 4.A tree is 2 metres tall. Each year its height increases by 10% of its height at the start of that year. Work out the height of the tree after 3 years, giving your answer to 1 decimal place.
- 5.A ball is thrown in the air. Its height, h metres, above the ground after t seconds is given in this table: when t = 0, h = 0; when t = 1, h = 15; when t = 2, h = 20; when t = 3, h = 15; when t = 4, h = 0. Use the table to find the two times, in seconds, at which the ball is at ground level.
- 6.A ball's height, h metres, t seconds after being thrown follows h = (t − 1)(9 − t). Given that the ball is at ground level at t = 1 and t = 9, work out at what time t the ball reaches its maximum height, using symmetry.
- 7.The graph of t = 240 ÷ s shows how the time, t hours, taken for a car journey of 240 miles depends on its average speed, s mph. Use the relationship to work out the time taken when the average speed is 48 mph.
- 8.A taxi charges a fixed fee of £3 plus £2 for every mile travelled. The journey is m miles. Write down an expression for the total cost, in pounds.
- 9.Point R has coordinates (3, −5). Point R is reflected in the line y = 2 to point S. Write down the coordinates of S.
- 10.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 11.The formula connecting distance (d), speed (s) and time (t) is d = st. Make s the subject of the formula.
- 12.Four sequences are shown below. Sequence P: 4, 8, 16, 32, ... Sequence Q: 4, 8, 12, 16, ... Sequence R: 4, 7, 12, 19, ... Sequence S: 4, 9, 16, 25, ... Work out which of the sequences P, Q, R and S is geometric.
- 13.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 14.The graph of P = 480 ÷ V shows how the pressure, P pascals, of a gas depends on its volume, V cm³, at constant temperature. Use the relationship to work out the volume when the pressure is 32 pascals, and then work out by how much the volume increases when the pressure drops to 24 pascals.
- 15.On Monday, a runner covers 15 km in 2.5 hours. On Tuesday, she covers 12 km in 1.5 hours. Using the formula speed = distance ÷ time, work out on which day she ran faster, and by how much.
Answer key
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (c) 14 — Substitute b = 6 into 3b − 4: 3 × 6 − 4 = 18 − 4 = 14. 5 comes from treating 3b as 3 + b instead of 3 × b, giving 3 + 6 − 4. 6 comes from subtracting 4 from b before multiplying by 3, 3 × (6 − 4). 18 comes from working out 3 × 6 correctly but forgetting to subtract the 4.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (c) 5 hours — Substitute s = 48 into the relationship: t = 240 ÷ 48 = 5 hours. Inverting the relationship, s ÷ 240 = 48 ÷ 240 = 0.2, gives 0.2 hours. Misplacing the decimal point in the division, 240 ÷ 48 read as 4.8, gives 4.8 hours. Halving the speed to 24 mph by mistake before dividing, 240 ÷ 24 = 10, gives 10 hours.
- (b) 3 + 2m — Method: add the fixed fee to the cost of the miles travelled. Working: the miles cost 2 × m = 2m pounds, and the fixed fee is £3, so the total is 3 + 2m. Answer: 3 + 2m. 2 + 3m comes from swapping which number is the fixed fee and which is the per-mile rate. 5 + m comes from adding the fixed fee and the rate together into one number, 3 + 2 = 5, before adding the miles, instead of multiplying the rate by the number of miles. 5m comes from multiplying that combined total by the miles, treating the whole £5 as if it were a per-mile rate.
- (c) (3, 9) — Reflecting in the horizontal line y = 2 keeps the x-coordinate the same and maps y to 2 × 2 − y = 4 − (−5) = 9, so S = (3, 9). A candidate who uses k − y instead of 2k − y gets 2 − (−5) = 7, giving (3, 7). A candidate who reflects in the x-axis instead of the line y = 2, simply changing the sign of y, gets (3, 5). A candidate who also changes the sign of the x-coordinate, as if reflecting in both axes, gets (−3, 9).
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (c) P — Sequence P has a common ratio of 2 (4 × 2 = 8, 8 × 2 = 16, 16 × 2 = 32), so it is geometric. Sequence Q has a common difference of 4, which is arithmetic, not geometric — a candidate who confuses a constant difference with a constant ratio picks Q. Sequence R has increasing differences of 3, 5, 7, a quadratic sequence, not geometric — a candidate who assumes any fast-growing sequence must be geometric picks R. Sequence S is the square numbers from 2² onwards (2², 3², 4², 5²), which is also quadratic, not geometric — a candidate who thinks squaring always means geometric growth picks S.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (b) 5 cm³ — When P = 32, V = 480 ÷ 32 = 15 cm³. When P = 24, V = 480 ÷ 24 = 20 cm³. The increase in volume is 20 − 15 = 5 cm³. Giving only the second volume, 20 cm³, forgets to subtract the first volume. Giving only the first volume, 15 cm³, answers the wrong part of the question. Subtracting the two pressures instead of the two volumes, 32 − 24 = 8, mixes up which quantity the question asks for.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
Build your own mix at the worksheet builder.