Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A taxi firm charges a fixed fee of £3.50 plus £2.20 per mile. Work out the total cost of a journey of 6 miles.
- 2.A school trip costs a £15 deposit plus £9 per student for the coach. The total cost for a class is £186. Work out how many students went on the trip.
- 3.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 4.Which of these is an equation, rather than an expression, a formula or an identity?
- 5.The braking distance of a car, in metres, is estimated using the formula d = 0.4v² + 6, where v is the speed in mph. A car travelling at 35 mph brakes. Work out the estimated braking distance.
- 6.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 7.A cyclist's distance-time graph shows the following: she travels 12 km in the first 30 minutes at a steady speed, then rests for 30 minutes, then travels a further 8 km in the next 15 minutes. Work out her average speed, in km/h, for the whole journey.
- 8.Three consecutive integers add up to 72. Using n for the smallest integer, form an equation and solve it to find the smallest of the three integers.
- 9.The graph of t = 240 ÷ s shows how the time, t hours, taken for a car journey of 240 miles depends on its average speed, s mph. Use the relationship to work out the time taken when the average speed is 48 mph.
- 10.A phone plan costs a fixed £15 per month plus 8p per minute of calls. In one month, Jamal's bill was £23.80. Form an equation using m for the number of minutes, and solve it to find how many minutes Jamal used that month.
- 11.A stack of firewood has 3 logs in the top layer. Each layer below has 4 more logs than the layer above it. Work out the number of logs in the 6th layer from the top.
- 12.Kai writes the expression 8 − 3x + 5x² and says it has three terms. Ryan says it only has two terms because a number on its own is not a term. Work out the correct number of terms in the expression.
- 13.Solve 2x² − 32 = 0.
- 14.A runner's journey is shown on a distance-time graph: she runs 8 km in the first hour, rests for 30 minutes with no distance gained, then runs a further 4 km in the next 30 minutes. Work out her average speed for the whole journey, in kilometres per hour.
- 15.The diagram shows a distance–time graph for a cyclist travelling at a constant speed, for the first 6 minutes of a journey. Distance is in kilometres and time is in minutes. Work out how far the cyclist would travel in 20 minutes at the same speed.
Answer key
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (c) 3x + 5 = 17 — An equation contains an equals sign and is true only for particular value(s) of the unknown — solving 3x + 5 = 17 gives the single value x = 4. 3x + 5 is an expression: it has no equals sign, so it cannot be solved, only simplified or evaluated. A = πr² is a formula: it shows the general relationship between different quantities (area and radius), rather than asking for one unknown value. 3(x + 5) ≡ 3x + 15 is an identity: the ≡ sign shows it is true for every value of x, not just one. The equation is 3x + 5 = 17.
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (c) 16 km/h — Method: total distance = 12 + 8 = 20 km. Total time = 30 + 30 + 15 = 75 minutes = 1.25 hours. Average speed = total distance ÷ total time = 20 ÷ 1.25 = 16 km/h. Distractor origins: 20 km/h gives the total distance without ever dividing by the total time; 24 km/h uses only the speed of the first stage (12 km in 30 minutes), ignoring the second stage and the rest; 28 km/h averages the two separate stage speeds, 24 km/h and 32 km/h, instead of using total distance over total time.
- (d) 23 — Method: let the smallest integer be n, so the three consecutive integers are n, n + 1 and n + 2. Form the equation n + (n + 1) + (n + 2) = 72. Working: simplify the left side: 3n + 3 = 72, so 3n = 69, giving n = 23. Answer: 23. 24 comes from dividing 72 by 3 directly, 72 ÷ 3 = 24, which finds the middle integer rather than realising the three numbers differ. 25 comes from correctly finding n = 23 but reading off the largest integer, n + 2, instead of the smallest as asked. 21 comes from dividing first and subtracting after, (72 ÷ 3) − 3, instead of subtracting 3 before dividing by 3.
- (c) 5 hours — Substitute s = 48 into the relationship: t = 240 ÷ 48 = 5 hours. Inverting the relationship, s ÷ 240 = 48 ÷ 240 = 0.2, gives 0.2 hours. Misplacing the decimal point in the division, 240 ÷ 48 read as 4.8, gives 4.8 hours. Halving the speed to 24 mph by mistake before dividing, 240 ÷ 24 = 10, gives 10 hours.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (b) 3 — Method: a term is any part of an expression separated from the rest by a + or − sign, including a number on its own. Working: 8 − 3x + 5x² splits at the + and − signs into 8, −3x and 5x² — that is three separate terms. Answer: 3. Ryan's answer of 2 comes from wrongly excluding the number 8, thinking a term must contain a letter. 5 comes from miscounting by treating the coefficients and powers as separate terms as well as the letters. 1 comes from treating the whole expression as a single term because it is written without brackets.
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (b) 10 km — Method: find the constant speed from the graph (distance ÷ time for any point on the line), then multiply that speed by 20 minutes. Working: the line passes through (4 minutes, 2 km), so the speed is 2 ÷ 4 = 0.5 km per minute; in 20 minutes the cyclist travels 0.5 × 20 = 10 km. Answer: 10 km. Distractor refutation: 3 km comes from reading off the distance shown at the end of the plotted section (6 minutes) and stopping there, instead of extending the line to 20 minutes. 20 km comes from misreading the speed as 1 km per minute instead of 0.5 km per minute, doubling the true rate. 40 km comes from dividing 20 by the speed instead of multiplying by it, a reciprocal mix-up.
Build your own mix at the worksheet builder.