Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.Four sequences are shown below. Sequence P: 4, 8, 16, 32, ... Sequence Q: 4, 8, 12, 16, ... Sequence R: 4, 7, 12, 19, ... Sequence S: 4, 9, 16, 25, ... Work out which of the sequences P, Q, R and S is geometric.
- 2.The formula connecting speed, distance and time is v = s ÷ t. Work out v, in km/h, when s = 180 and t = 4.
- 3.A scout leader is 44 years old and one of the scouts is 16 years old. Work out how many years it will be until the leader is exactly twice as old as the scout.
- 4.The formula for the perimeter of a rectangle is P = 2(l + w). One rectangle has l = 9 cm and w = 4 cm. A second rectangle has l = 6 cm and w = 5 cm. Work out how many cm greater the perimeter of the first rectangle is than the perimeter of the second.
- 5.A tree is 2 metres tall. Each year its height increases by 10% of its height at the start of that year. Work out the height of the tree after 3 years, giving your answer to 1 decimal place.
- 6.The mean of four numbers is 12.5. Three of the numbers are 8, 15 and 19. Form an equation using n for the fourth number, and solve it to find n.
- 7.A stack of firewood has 3 logs in the top layer. Each layer below has 4 more logs than the layer above it. Work out the number of logs in the 6th layer from the top.
- 8.The braking distance of a car, in metres, is estimated using the formula d = 0.4v² + 6, where v is the speed in mph. A car travelling at 35 mph brakes. Work out the estimated braking distance.
- 9.Which of these is an equation, rather than an expression, a formula or an identity?
- 10.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 11.A gardener charges a fixed fee of £15 plus £8 for each hour worked. The total charge, £T, for a job lasting h hours is given by T = 15 + 8h. Work out the charge for a job lasting 4 hours, and identify what kind of statement T = 15 + 8h is.
- 12.A park is drawn on a grid in which 1 unit represents 1 km. The car park is at the point (0, 0) and the lake is at the point (3, 5). Work out the direct distance, in km, from the car park to the lake, giving your answer to 1 decimal place.
- 13.A phone company works out a monthly bill, £B, using the formula B = 18 + 0.05t, where £18 is the fixed monthly charge and t is the number of extra text messages sent beyond the free allowance, each charged at 5p. Farida's bill for one month is £24.50. Work out the number of extra text messages, t, she sent.
- 14.Work out the value of 5m² + 3m when m = −2.4
- 15.A taxi firm charges a fixed fee of £3.50 plus £2.20 per mile. Work out the total cost of a journey of 6 miles.
Answer key
- (c) P — Sequence P has a common ratio of 2 (4 × 2 = 8, 8 × 2 = 16, 16 × 2 = 32), so it is geometric. Sequence Q has a common difference of 4, which is arithmetic, not geometric — a candidate who confuses a constant difference with a constant ratio picks Q. Sequence R has increasing differences of 3, 5, 7, a quadratic sequence, not geometric — a candidate who assumes any fast-growing sequence must be geometric picks R. Sequence S is the square numbers from 2² onwards (2², 3², 4², 5²), which is also quadratic, not geometric — a candidate who thinks squaring always means geometric growth picks S.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (b) 12 years — Method: call the number of years t, add t to both ages, and form an equation from the comparison at that future time. Working: in t years the leader will be 44 + t and the scout will be 16 + t, so 44 + t = 2(16 + t); expanding gives 44 + t = 32 + 2t, and subtracting t and 32 from both sides gives t = 12. Checking: in 12 years the leader will be 56 and the scout 28, and 56 = 2 × 28. Answer: 12 years. The distractors: 6 years comes from halving the leader's present age instead, so that the scout has to reach 22, which takes 6 years; 14 years comes from halving the 28-year gap between the two ages; 28 years comes from giving the age gap itself as the number of years.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
- (d) 8 — Since the mean of the four numbers is 12.5, their total is 4 × 12.5 = 50. The three known numbers add up to 8 + 15 + 19 = 42, so n = 50 − 42 = 8. A candidate who multiplies the mean by 3 instead of 4 gets a total of 37.5, giving n = 37.5 − 42 = −4.5. A candidate who forgets to subtract the three known numbers and gives the total itself as n states n = 50. A candidate who subtracts the mean from the total of the three known numbers instead of the other way round gets n = 42 − 12.5 = 29.5.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
- (c) 3x + 5 = 17 — An equation contains an equals sign and is true only for particular value(s) of the unknown — solving 3x + 5 = 17 gives the single value x = 4. 3x + 5 is an expression: it has no equals sign, so it cannot be solved, only simplified or evaluated. A = πr² is a formula: it shows the general relationship between different quantities (area and radius), rather than asking for one unknown value. 3(x + 5) ≡ 3x + 15 is an identity: the ≡ sign shows it is true for every value of x, not just one. The equation is 3x + 5 = 17.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (a) 5.8 — The horizontal distance is 3 and the vertical distance is 5, so using Pythagoras' theorem the distance is √(3² + 5²) = √34 = 5.8 (1 d.p.). A candidate who adds the two differences instead of using Pythagoras gets 3 + 5 = 8.0. A candidate who works out 3² + 5² = 34 but forgets to take the square root gets 34.0. A candidate who subtracts the squares instead of adding them gets √(5² − 3²) = √16 = 4.0.
- (a) 130 — Method: substitute the total bill into the formula, then subtract the fixed charge and divide by the cost per text message. Working: 24.50 = 18 + 0.05t, so 0.05t = 24.50 − 18 = 6.50, t = 6.50 ÷ 0.05 = 130. Answer: 130 extra text messages. 490 comes from dividing the whole bill by 0.05 without first subtracting the £18 fixed charge: 24.50 ÷ 0.05 = 490. 13 comes from dividing the £6.50 by 0.5 instead of 0.05, moving the decimal point one place too far: 6.50 ÷ 0.5 = 13. 65 comes from dividing the £6.50 by 0.1 instead of 0.05.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
Build your own mix at the worksheet builder.