Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 2.A park is drawn on a grid in which 1 unit represents 1 km. The car park is at the point (0, 0) and the lake is at the point (3, 5). Work out the direct distance, in km, from the car park to the lake, giving your answer to 1 decimal place.
- 3.Four sequences are shown below. Sequence P: 4, 8, 16, 32, ... Sequence Q: 4, 8, 12, 16, ... Sequence R: 4, 7, 12, 19, ... Sequence S: 4, 9, 16, 25, ... Work out which of the sequences P, Q, R and S is geometric.
- 4.A stack of firewood has 3 logs in the top layer. Each layer below has 4 more logs than the layer above it. Work out the number of logs in the 6th layer from the top.
- 5.The formula for the perimeter of a square is P = 4s, where s is the side length. Make s the subject of the formula.
- 6.The formula connecting speed, distance and time is v = s ÷ t. Work out v, in km/h, when s = 180 and t = 4.
- 7.A regular hexagon has sides of length (x + 2) cm. Write down an expression, in terms of x, for the perimeter of the hexagon.
- 8.The graph of t = 240 ÷ s shows how the time, t hours, taken for a car journey of 240 miles depends on its average speed, s mph. Use the relationship to work out the time taken when the average speed is 48 mph.
- 9.A ferry's distance-time graph is a straight line from (0 minutes, 0 km) to (25 minutes, 15 km). Work out the ferry's speed in kilometres per hour.
- 10.A currency conversion graph shows that £4 is equivalent to 5 US dollars. Use this to work out how many US dollars are equivalent to £24.
- 11.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 12.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 13.A phone plan costs a fixed £15 per month plus 8p per minute of calls. In one month, Jamal's bill was £23.80. Form an equation using m for the number of minutes, and solve it to find how many minutes Jamal used that month.
- 14.Solve 2x² − 32 = 0.
- 15.Priya buys b balloons for a party. Each balloon costs 15p. Write down an expression for the total cost, in pence.
Answer key
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (a) 5.8 — The horizontal distance is 3 and the vertical distance is 5, so using Pythagoras' theorem the distance is √(3² + 5²) = √34 = 5.8 (1 d.p.). A candidate who adds the two differences instead of using Pythagoras gets 3 + 5 = 8.0. A candidate who works out 3² + 5² = 34 but forgets to take the square root gets 34.0. A candidate who subtracts the squares instead of adding them gets √(5² − 3²) = √16 = 4.0.
- (c) P — Sequence P has a common ratio of 2 (4 × 2 = 8, 8 × 2 = 16, 16 × 2 = 32), so it is geometric. Sequence Q has a common difference of 4, which is arithmetic, not geometric — a candidate who confuses a constant difference with a constant ratio picks Q. Sequence R has increasing differences of 3, 5, 7, a quadratic sequence, not geometric — a candidate who assumes any fast-growing sequence must be geometric picks R. Sequence S is the square numbers from 2² onwards (2², 3², 4², 5²), which is also quadratic, not geometric — a candidate who thinks squaring always means geometric growth picks S.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (c) s = P / 4 — Method: undo the multiplication by 4 by dividing both sides by 4. Working: P = 4s, so dividing both sides by 4 gives s = P / 4. The value s = 4P comes from multiplying by 4 instead of dividing — using the wrong inverse operation. The value s = P + 4 comes from adding 4 instead of dividing. The value s = P − 4 comes from subtracting 4 instead of dividing.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (c) 5 hours — Substitute s = 48 into the relationship: t = 240 ÷ 48 = 5 hours. Inverting the relationship, s ÷ 240 = 48 ÷ 240 = 0.2, gives 0.2 hours. Misplacing the decimal point in the division, 240 ÷ 48 read as 4.8, gives 4.8 hours. Halving the speed to 24 mph by mistake before dividing, 240 ÷ 24 = 10, gives 10 hours.
- (a) 36 km/h — Speed is distance ÷ time. Convert 25 minutes to hours: 25 ÷ 60 = 5/12 hours. Then 15 ÷ (5/12) = 15 × 12/5 = 36 km/h. Dividing 15 by 25 without converting minutes to hours gives 0.6 km/h. Multiplying 15 by 25/60 instead of dividing by it gives 6.25 km/h. Working out the speed in km per minute, 0.6, and then multiplying by 24 instead of 60 gives 14.4 km/h.
- (a) 30 US dollars — £24 is 6 times £4, and the same scale factor applies to US dollars, so multiply 5 by 6: 5 × 6 = 30, giving 30 US dollars. Multiplying £24 by 4/5, the pounds-per-dollar ratio, instead of by 5/4, the dollars-per-pound ratio, gives 24 × 4/5 = 19.2, applying the ratio the wrong way round and giving 19.20 US dollars. Adding the extra £20 straight onto the 5 as if £1 equalled 1 US dollar, 5 + 20 = 25, gives 25 US dollars. Multiplying £24 by 5 without first dividing by the original £4, 24 × 5 = 120, gives 120 US dollars.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (d) 15b — Method: each balloon costs 15p, so b balloons cost 15 × b pence. Working: 15 × b = 15b. Answer: 15b. b + 15 comes from treating the 15p as a one-off addition rather than a rate applied to every balloon. b − 15 comes from misreading the situation as a discount rather than a cost per balloon. b/15 comes from dividing instead of multiplying, swapping the two operations.