Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 2.A stack of firewood has 3 logs in the top layer. Each layer below has 4 more logs than the layer above it. Work out the number of logs in the 6th layer from the top.
- 3.A ferry's distance-time graph is a straight line from (0 minutes, 0 km) to (25 minutes, 15 km). Work out the ferry's speed in kilometres per hour.
- 4.Work out the value of 5m² + 3m when m = −2.4
- 5.A plumber charges a call-out fee of £30 plus £25 for each hour worked. The total bill for a job was £130. Work out how many hours the plumber worked.
- 6.A taxi fare in pounds is given by F = 2.50 + 1.20m, where m is the number of miles travelled. Sam takes a taxi for a journey of 6 miles. Work out the fare.
- 7.A ball is thrown in the air. Its height, h metres, above the ground after t seconds is given in this table: when t = 0, h = 0; when t = 1, h = 15; when t = 2, h = 20; when t = 3, h = 15; when t = 4, h = 0. Use the table to find the two times, in seconds, at which the ball is at ground level.
- 8.The graph of y = x² − 2x − 8 takes these values: when x = −2, y = 0; when x = −1, y = −5; when x = 0, y = −8; when x = 3, y = −5; when x = 4, y = 0. Use these values to write down the two solutions of x² − 2x − 8 = 0.y = x² − 2x − 8
- 9.Which expression means the same as 3 × a × b?
- 10.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 11.Solve 5x² − 15x = 0.
- 12.The formula for the perimeter of a square is P = 4s, where s is the side length. Make s the subject of the formula.
- 13.A phone plan costs a fixed £15 per month plus 8p per minute of calls. In one month, Jamal's bill was £23.80. Form an equation using m for the number of minutes, and solve it to find how many minutes Jamal used that month.
- 14.The formula for the perimeter of a rectangle is P = 2(l + w). One rectangle has l = 9 cm and w = 4 cm. A second rectangle has l = 6 cm and w = 5 cm. Work out how many cm greater the perimeter of the first rectangle is than the perimeter of the second.
- 15.A formula is F = 4s. A pupil says that when s = 5 the value of F is 9, because they added 4 and 5 instead of multiplying. Work out the correct value of F when s = 5.
Answer key
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (a) 36 km/h — Speed is distance ÷ time. Convert 25 minutes to hours: 25 ÷ 60 = 5/12 hours. Then 15 ÷ (5/12) = 15 × 12/5 = 36 km/h. Dividing 15 by 25 without converting minutes to hours gives 0.6 km/h. Multiplying 15 by 25/60 instead of dividing by it gives 6.25 km/h. Working out the speed in km per minute, 0.6, and then multiplying by 24 instead of 60 gives 14.4 km/h.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (c) £9.70 — F = 2.50 + 1.20 × 6 = 2.50 + 7.20 = £9.70. £7.20 comes from forgetting to add the £2.50 fixed charge. £10.20 comes from adding the 2.50 to the number of miles before multiplying by 1.20, 1.20 × (6 + 2.50). £22.20 comes from adding the fixed charge and the rate together first and then multiplying by the miles, (2.50 + 1.20) × 6.
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (c) x = −2 or x = 4 — The solutions of x² − 2x − 8 = 0 are the x-values where y = 0. From the table, y = 0 when x = −2 and when x = 4, so those are the two solutions. Distractor origins: x = −1 or x = 3 picks the pair of x-values that give equal (but non-zero) y-values instead of y = 0; x = 0 or x = −8 mixes up an x-value with its corresponding y-value; x = −2 only reads off one of the two roots and misses the other.
- (a) 3ab — 3 × a × b means 3, a and b are all multiplied together, and in algebraic notation this is written with no multiplication signs: 3ab. Writing 3 + a + b turns every multiplication into an addition, giving a completely different expression. Writing a³b misreads the 3 as a power on a rather than as a coefficient in front of both letters. Writing 3a + b multiplies the 3 by a correctly but then adds b instead of also multiplying it in. The expression that means 3 × a × b is 3ab.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (c) x = 0 or x = 3 — Method: take out the common factor 5x: 5x(x − 3) = 0, so 5x = 0 or x − 3 = 0, giving x = 0 or x = 3. Distractor origins: x = 0 or x = 15 comes from forgetting to divide the second term by the common factor 5x correctly, leaving 15 instead of 3; x = 3 loses the solution x = 0 by dividing both sides by x; x = 5 or x = 3 mistakes the coefficient 5 itself for one of the solutions.
- (c) s = P / 4 — Method: undo the multiplication by 4 by dividing both sides by 4. Working: P = 4s, so dividing both sides by 4 gives s = P / 4. The value s = 4P comes from multiplying by 4 instead of dividing — using the wrong inverse operation. The value s = P + 4 comes from adding 4 instead of dividing. The value s = P − 4 comes from subtracting 4 instead of dividing.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (b) 20 — F = 4s, so when s = 5, F = 4 × 5 = 20. 9 comes from adding 4 and 5 instead of multiplying, the mistake described in the question. 25 comes from squaring s (5²) instead of multiplying by 4. 45 comes from writing the digits 4 and 5 next to each other instead of carrying out the multiplication.
Build your own mix at the worksheet builder.