Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 2.A person's body mass index is given by the formula B = m ÷ h², where m is the mass in kg and h is the height in metres. Work out B, to 1 decimal place, when m = 68 and h = 1.6.
- 3.A ball's height, h metres, t seconds after being thrown follows h = (t − 1)(9 − t). Given that the ball is at ground level at t = 1 and t = 9, work out at what time t the ball reaches its maximum height, using symmetry.
- 4.The graph of y = 20/x is drawn for x > 0. As the value of x increases, what happens to the value of y?
- 5.The graph of P = 480 ÷ V shows how the pressure, P pascals, of a gas depends on its volume, V cm³, at constant temperature. Use the relationship to work out the volume when the pressure is 32 pascals, and then work out by how much the volume increases when the pressure drops to 24 pascals.
- 6.A currency conversion graph shows that £4 is equivalent to 5 US dollars. Use this to work out how many US dollars are equivalent to £24.
- 7.Which expression is equivalent to 0.5(4x + 6) − x?
- 8.A hiker's distance-time graph shows the following: he walks 5 km in the first 1 hour at a steady speed, rests for 1 hour, then walks a further 9 km in the next 2 hours, also at a steady speed. Work out his average speed for the whole journey, in km/h.
- 9.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 10.A scout leader is 44 years old and one of the scouts is 16 years old. Work out how many years it will be until the leader is exactly twice as old as the scout.
- 11.A stack of firewood has 3 logs in the top layer. Each layer below has 4 more logs than the layer above it. Work out the number of logs in the 6th layer from the top.
- 12.The formula for converting a distance in miles, m, to kilometres, k, is k = 8m ÷ 5. Work out k when m = 10.
- 13.The formula for the perimeter of a square is P = 4s, where s is the side length. Make s the subject of the formula.
- 14.A rectangle has length (2x + 5) cm and width (x − 2) cm. Work out an expression, in terms of x, for the perimeter of the rectangle. Give your answer in its simplest form.
- 15.A taxi company charges a £2.50 booking fee plus £1.80 per mile. A journey costs £15.10 in total. Work out the number of miles travelled.
Answer key
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (c) 26.6 — h² = 1.6² = 2.56, so B = 68 ÷ 2.56 = 26.5625, which rounds to 26.6 (1 d.p.). A candidate who forgets to square the height gets 68 ÷ 1.6 = 42.5. A candidate who squares the mass instead of the height gets 68² ÷ 1.6 = 2890.0. A candidate who truncates 26.5625 instead of rounding it gets 26.5.
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (b) 5 cm³ — When P = 32, V = 480 ÷ 32 = 15 cm³. When P = 24, V = 480 ÷ 24 = 20 cm³. The increase in volume is 20 − 15 = 5 cm³. Giving only the second volume, 20 cm³, forgets to subtract the first volume. Giving only the first volume, 15 cm³, answers the wrong part of the question. Subtracting the two pressures instead of the two volumes, 32 − 24 = 8, mixes up which quantity the question asks for.
- (a) 30 US dollars — £24 is 6 times £4, and the same scale factor applies to US dollars, so multiply 5 by 6: 5 × 6 = 30, giving 30 US dollars. Multiplying £24 by 4/5, the pounds-per-dollar ratio, instead of by 5/4, the dollars-per-pound ratio, gives 24 × 4/5 = 19.2, applying the ratio the wrong way round and giving 19.20 US dollars. Adding the extra £20 straight onto the 5 as if £1 equalled 1 US dollar, 5 + 20 = 25, gives 25 US dollars. Multiplying £24 by 5 without first dividing by the original £4, 24 × 5 = 120, gives 120 US dollars.
- (c) x + 3 — Expand the bracket: 0.5(4x + 6) = 2x + 3. Then subtract the x: 2x + 3 − x = x + 3. The option 2x + 3 comes from expanding the bracket correctly but then forgetting to subtract the x at all. The option x + 6 comes from forgetting to multiply the 6 inside the bracket by 0.5 (treating it as 2x + 6), then subtracting x. The option 3x + 3 comes from adding the x instead of subtracting it: 2x + 3 + x = 3x + 3.
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (b) 12 years — Method: call the number of years t, add t to both ages, and form an equation from the comparison at that future time. Working: in t years the leader will be 44 + t and the scout will be 16 + t, so 44 + t = 2(16 + t); expanding gives 44 + t = 32 + 2t, and subtracting t and 32 from both sides gives t = 12. Checking: in 12 years the leader will be 56 and the scout 28, and 56 = 2 × 28. Answer: 12 years. The distractors: 6 years comes from halving the leader's present age instead, so that the scout has to reach 22, which takes 6 years; 14 years comes from halving the 28-year gap between the two ages; 28 years comes from giving the age gap itself as the number of years.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (a) 16 — k = 8m ÷ 5 = (8 × 10) ÷ 5 = 80 ÷ 5 = 16. A candidate who multiplies 8 by 10 but forgets to divide by 5 gets 80. A candidate who divides 10 by 8 and multiplies by 5, using the fraction upside down, gets 10 × 5 ÷ 8 = 6.25. A candidate who adds instead of substituting into the formula gets 8 + 10 = 18.
- (c) s = P / 4 — Method: undo the multiplication by 4 by dividing both sides by 4. Working: P = 4s, so dividing both sides by 4 gives s = P / 4. The value s = 4P comes from multiplying by 4 instead of dividing — using the wrong inverse operation. The value s = P + 4 comes from adding 4 instead of dividing. The value s = P − 4 comes from subtracting 4 instead of dividing.
- (b) 6x + 6 — Perimeter = 2[(2x + 5) + (x − 2)] = 2(3x + 3) = 6x + 6. A candidate who adds the length and width but forgets to double for the perimeter gets 3x + 3. A candidate who makes a sign error and adds 2 instead of subtracting it before doubling gets 2[(2x + 5) + (x + 2)] = 6x + 14. A candidate who multiplies the length and width instead of adding them, confusing the perimeter formula with the area formula, and then doubles that product, gets 2(2x + 5)(x − 2) = 4x² + 2x − 20.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
Build your own mix at the worksheet builder.