Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.The graph of t = 240 ÷ s shows how the time, t hours, taken for a car journey of 240 miles depends on its average speed, s mph. Use the relationship to work out the time taken when the average speed is 48 mph.
- 2.A rectangle has length k cm and width 5 cm less than its length. Write down an expression for the width of the rectangle, in cm.
- 3.A formula is F = 4s. A pupil says that when s = 5 the value of F is 9, because they added 4 and 5 instead of multiplying. Work out the correct value of F when s = 5.
- 4.The graph of y = 20/x is drawn for x > 0. As the value of x increases, what happens to the value of y?
- 5.The mean of four numbers is 12.5. Three of the numbers are 8, 15 and 19. Form an equation using n for the fourth number, and solve it to find n.
- 6.Write down the gradient of the line with equation y = 6 + 4x.
- 7.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 8.A taxi firm charges a fixed fee of £3.50 plus £2.20 per mile. Work out the total cost of a journey of 6 miles.
- 9.The braking distance of a car, in metres, is estimated using the formula d = 0.4v² + 6, where v is the speed in mph. A car travelling at 35 mph brakes. Work out the estimated braking distance.
- 10.A stack of firewood has 3 logs in the top layer. Each layer below has 4 more logs than the layer above it. Work out the number of logs in the 6th layer from the top.
- 11.The formula connecting speed, distance and time is v = s ÷ t. Work out v, in km/h, when s = 180 and t = 4.
- 12.The formula for converting a temperature in Fahrenheit, F, to Celsius, C, is C = 5(F − 32) ÷ 9. Work out C, to 1 decimal place, when F = 98.6.
- 13.A ball's height, h metres, t seconds after being thrown follows h = (t − 1)(9 − t). Given that the ball is at ground level at t = 1 and t = 9, work out at what time t the ball reaches its maximum height, using symmetry.
- 14.A plumber charges a call-out fee of £30 plus £25 per hour worked. Work out the total charge for a job that takes 3 hours.
- 15.A square tile has an area of 144 cm². Work out the side length of the tile.
Answer key
- (c) 5 hours — Substitute s = 48 into the relationship: t = 240 ÷ 48 = 5 hours. Inverting the relationship, s ÷ 240 = 48 ÷ 240 = 0.2, gives 0.2 hours. Misplacing the decimal point in the division, 240 ÷ 48 read as 4.8, gives 4.8 hours. Halving the speed to 24 mph by mistake before dividing, 240 ÷ 24 = 10, gives 10 hours.
- (b) k − 5 — Method: the width is 5 less than the length, so subtract 5 from the length. Working: length − 5 = k − 5. Answer: k − 5. 5 − k comes from subtracting in the wrong order, taking the length away from 5 instead of the other way round. k + 5 comes from adding instead of subtracting, missing that the width is smaller than the length. 5k comes from multiplying the length by 5 instead of subtracting 5 from it.
- (b) 20 — F = 4s, so when s = 5, F = 4 × 5 = 20. 9 comes from adding 4 and 5 instead of multiplying, the mistake described in the question. 25 comes from squaring s (5²) instead of multiplying by 4. 45 comes from writing the digits 4 and 5 next to each other instead of carrying out the multiplication.
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (d) 8 — Since the mean of the four numbers is 12.5, their total is 4 × 12.5 = 50. The three known numbers add up to 8 + 15 + 19 = 42, so n = 50 − 42 = 8. A candidate who multiplies the mean by 3 instead of 4 gets a total of 37.5, giving n = 37.5 − 42 = −4.5. A candidate who forgets to subtract the three known numbers and gives the total itself as n states n = 50. A candidate who subtracts the mean from the total of the three known numbers instead of the other way round gets n = 42 − 12.5 = 29.5.
- (d) 4 — Method: compare the equation with the general form y = mx + c after writing the x term first, then read off the coefficient of x. Working: y = 6 + 4x can be written as y = 4x + 6, so comparing with y = mx + c gives m = 4. Answer: the gradient is 4. The value 6 comes from reading off the constant, written first in the equation, and treating it as the gradient because it comes before the x term. The value 10 comes from adding the two numbers in the equation, 6 + 4, instead of reading off the coefficient of x. The value 24 comes from multiplying the two numbers in the equation, 6 × 4, instead of reading off the coefficient of x.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (d) 37.0 — C = 5(98.6 − 32) ÷ 9 = 5 × 66.6 ÷ 9 = 333 ÷ 9 = 37.0. A candidate who forgets to subtract 32 first gets 5 × 98.6 ÷ 9 = 54.8 (1 d.p.). A candidate who forgets the 5 ÷ 9 factor entirely and just works out F − 32 gets 66.6. A candidate who multiplies by 9 ÷ 5 instead of 5 ÷ 9 gets 66.6 × 9 ÷ 5 = 119.9 (1 d.p.).
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (c) 12 cm — For a square, area = side². So side² = 144, giving side = ±12. Since a length must be positive, the side length is 12 cm. A candidate who gives both square roots without rejecting the negative one, which cannot be a length, answers 12 cm or −12 cm. A candidate who halves 144 instead of taking its square root gets 72 cm. A candidate who divides 144 by 4, confusing the area formula with a perimeter calculation, gets 36 cm.
Build your own mix at the worksheet builder.