Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.The point C is 6 units to the right of the origin and 0 units up. Write down the coordinates of C.
- 2.The point P has coordinates (0, 12). Write down the axis that P lies on and the y-coordinate of P.
- 3.A plumber charges a call-out fee of £30 plus £25 for each hour worked. The total bill for a job was £130. Work out how many hours the plumber worked.
- 4.Priya buys b balloons for a party. Each balloon costs 15p. Write down an expression for the total cost, in pence.
- 5.A sequence has the position-to-term rule n² + 2, where n is the position number. Work out the 6th term.
- 6.A rectangular sheep pen has perimeter P, length l and width w, connected by the formula P = 2l + 2w. A farmer has 60 m of fencing for the perimeter and sets the width at 8 m. Work out the length of the pen.
- 7.y = 5 − 2x. Work out the value of x when y = 11.
- 8.A quadratic graph has equation y = (x − 4)². A student says this graph crosses the x-axis at two different points. Explain why the student is wrong.
- 9.Make m the subject of the formula w = m − 8.
- 10.Which expression means the same as a × a × a?
- 11.A runner's journey is shown on a distance-time graph: she runs 8 km in the first hour, rests for 30 minutes with no distance gained, then runs a further 4 km in the next 30 minutes. Work out her average speed for the whole journey, in kilometres per hour.
- 12.A hiker's distance-time graph shows the following: he walks 5 km in the first 1 hour at a steady speed, rests for 1 hour, then walks a further 9 km in the next 2 hours, also at a steady speed. Work out his average speed for the whole journey, in km/h.
- 13.A ribbon of length L metres is cut into 5 equal pieces, and then 3 metres is removed from one piece. Write down an expression, in metres, for the length of that piece after 3 metres is removed.
- 14.Work out the coordinates of the point where the graph of y = 2x − 6 crosses the x-axis.y = 2x − 6
- 15.Factorise fully 56x − 24
Answer key
- (a) (6, 0) — Method: a pair of coordinates records movement from the origin, the across movement written first and the up or down movement second. Working: C is 6 units to the right of the origin, so the across number is 6; it is 0 units up, so the up number is 0; written in order that gives (6, 0), a point on the x-axis. Answer: (6, 0). The distractors: (0, 6) comes from writing the two movements the wrong way round; (0, 0) comes from reading '0 units up' as meaning the point never left the origin at all, which ignores the movement across; (7, 0) comes from counting the origin itself as the first unit while counting 6 units to the right.
- (d) the y-axis, and 12 — Method: coordinates are written (x, y), so the first number is the distance across and the second the distance up; a point whose first coordinate is 0 has not moved across from the origin and therefore lies on the vertical axis. Working: in (0, 12) the first number is 0, so P is on the y-axis, and the second number, 12, is the y-coordinate of P. Answer: the y-axis, and 12. The distractors: 'the x-axis, and 12' comes from mixing up which axis the condition 'the first coordinate is 0' describes; 'the y-axis, and 0' comes from placing P correctly but reading the pair the wrong way round, so that the first number is quoted as the y-coordinate; 'the x-axis, and 0' comes from making both of those mistakes at once.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (d) 15b — Method: each balloon costs 15p, so b balloons cost 15 × b pence. Working: 15 × b = 15b. Answer: 15b. b + 15 comes from treating the 15p as a one-off addition rather than a rate applied to every balloon. b − 15 comes from misreading the situation as a discount rather than a cost per balloon. b/15 comes from dividing instead of multiplying, swapping the two operations.
- (a) 38 — Method: substitute the position number into the rule and follow the order of operations, so the squaring is carried out before the 2 is added. Working: n = 6 gives 6² + 2; 6² means 6 × 6 = 36, and then 2 is added to 36. Answer: 38. The distractors: 14 comes from multiplying the position by 2 instead of squaring it, 6 × 2 + 2; 36 comes from squaring correctly and then forgetting to add the 2; 64 comes from adding the 2 first and squaring afterwards, (6 + 2)².
- (c) 22 m — Rearranging P = 2l + 2w for l gives l = (P − 2w)/2. Substituting P = 60 and w = 8: l = (60 − 16)/2 = 44/2 = 22 m. Answering 30 m comes from ignoring the width altogether and working out l = P/2, which only holds when w = 0. Answering 38 m comes from adding 2w instead of subtracting it: (60 + 16)/2 = 38. Answering 11 m comes from dividing by 4 instead of 2, as if the formula were P = 4l + 4w. The pen's length is 22 m.
- (d) −3 — Substitute y = 11 into y = 5 − 2x, giving 11 = 5 − 2x. Subtracting 5 from both sides gives 6 = −2x, so x = 6 ÷ (−2) = −3. A candidate who mishandles the negative sign when rearranging, treating the equation as 6 = 2x, gets x = 3. A candidate who correctly finds −2x = 6 but forgets to divide by 2 at all gets x = 6. A candidate who adds 5 and 11 instead of subtracting, getting 2x = 16, gets x = 8.
- (a) It touches the x-axis once, only at x = 4. — (x − 4)² is a square, so it equals zero only when x − 4 = 0, that is at x = 4 — the curve just touches the x-axis there rather than crossing it, since a square cannot be negative on either side to cross through. Saying it crosses at x = 4 and x = −4 wrongly introduces a plus-or-minus, as if taking a square root of x, rather than recognising the bracket is already squared and only zero once. Saying it never touches the x-axis forgets that a squared term CAN equal zero, even though it can never be negative. Saying it crosses at x = 2 and x = −2 confuses (x − 4)² with the different expression x² − 4.
- (b) m = w + 8 — To make m the subject of w = m − 8, add 8 to both sides so the subtraction is undone: m = w + 8. Writing m = w − 8 forgets to change the operation at all — it just relabels the equation without moving the 8 across. Writing m = 8 − w swaps the order and puts the wrong sign on w, as if the equation had been w = 8 − m instead. Writing m = w/8 mistakes subtraction for a scaling relationship and divides by 8 instead of adding it. The correct rearrangement is m = w + 8.
- (c) a³ — a × a × a means a multiplied by itself three times, which is written using powers as a³ — the small 3 shows how many times a is multiplied by itself. Writing 3a instead uses the 3 as a coefficient, as if the expression meant a + a + a (three lots of a added together) rather than three a's multiplied together. Writing a² only accounts for two of the three a's being multiplied together, missing one factor. Writing 3 + a treats the repeated multiplication as an addition of 3 and a, which has no connection to the original expression. The expression that means a × a × a is a³.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (c) L/5 − 3 — Each of the 5 equal pieces is L/5 metres long, and removing 3 metres from one piece gives L/5 − 3. Subtracting the 3 metres before dividing by 5, (L − 3)/5, divides the removed length between all 5 pieces instead of taking it from just one. Dividing only the 3 by 5 instead of dividing L by 5, L − 3/5, divides the wrong number. Writing 5/L − 3 inverts the fraction, swapping which number is the numerator.
- (d) (3, 0) — Method: every point on the x-axis has y-coordinate 0, so substituting y = 0 into the equation and solving gives the x-coordinate of the crossing point. Working: 0 = 2x − 6 gives 2x = 6, so x = 6 ÷ 2 = 3 and the graph crosses the x-axis at (3, 0). Answer: (3, 0). The distractors: (0, −6) is where the graph crosses the y-axis, found by substituting x = 0 rather than y = 0; (−3, 0) comes from moving the 6 across the equals sign without changing its sign, giving 2x = −6; (6, 0) comes from reading the constant straight off as the crossing point and never dividing by the gradient 2.
- (d) 8(7x − 3) — Method: find the highest common factor of the two terms, write it in front of a bracket and divide each term by it. Working: 56 = 8 × 7 and 24 = 8 × 3, so the highest common factor is 8; dividing gives 56x ÷ 8 = 7x and 24 ÷ 8 = 3, and the subtraction sign stays between them. Answer: 8(7x − 3), which multiplies back out to 56x − 24. The distractors: 8(7x + 3) comes from dropping the minus sign of −24 while dividing; 8(56x − 3) comes from dividing only the number term by 8 and leaving 56x untouched inside the bracket; 8(7x − 16) comes from subtracting 8 from 24 instead of dividing 24 by 8.
Build your own mix at the worksheet builder.