Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.The area of a circle is given by the formula A = πr², where r is the radius. Rearrange the formula to make r the subject.
- 2.Which of these statements is an identity?
- 3.Point P has coordinates (5, 2). Point P is rotated 180° about the origin to point Q. Write down the coordinates of Q.
- 4.A plumber charges a call-out fee of £30 plus £25 per hour worked. Work out the total charge for a job that takes 3 hours.
- 5.Make x the subject of the formula y = 4(x − 6).
- 6.A straight line passes through the points (2, 5) and (4, 11). Work out the gradient of the line.
- 7.A water butt holds 200 litres and is being drained at a steady 8 litres per minute. Write down the function for the amount of water y, in litres, left after x minutes.
- 8.Make x the subject of the formula y = 2x − 9.y = 2x − 9
- 9.Sophie's mother is 34 years old. In x years' time she will be 50 years old. Work out the value of x.
- 10.A rectangle has length (2x + 5) cm and width (x − 2) cm. Work out an expression, in terms of x, for the perimeter of the rectangle. Give your answer in its simplest form.
- 11.Factorise fully 56x − 24
- 12.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 13.A rectangle has width x cm. Its length is 3 cm more than its width. The perimeter of the rectangle is 38 cm. Form an equation and solve it to find x.
- 14.Solve 2x − 2 = 2
- 15.A plumber charges a £40 call-out fee plus £25 for each hour worked. The total charge, £C, for a job lasting h hours is given by C = 40 + 25h. Work out the charge for a job lasting 3 hours, and name what kind of statement C = 40 + 25h is.
Answer key
- (c) r = √(A/π) — A = πr² means r has been squared and then multiplied by π. To make r the subject, first divide both sides by π to get A/π = r², then take the square root of both sides: r = √(A/π). Writing r = A/π stops after dividing by π and forgets that r is still squared — it never undoes the square. Writing r = √A/π takes the square root before dividing by π, which square-roots only the A and not the whole of A/π. Writing r = (A/π)² squares A/π instead of taking its square root — the opposite of what is needed to undo r². The correct rearrangement is r = √(A/π).
- (c) 2(x + 4) ≡ 2x + 8 — 2(x + 4) ≡ 2x + 8 is an identity because expanding the bracket on the left gives exactly the right-hand side for every value of x — try any number and both sides match. 2(x + 4) = 20 is an equation: expanding gives 2x + 8 = 20, which is only true for the single value x = 6. 2(x + 4) = 2x + 4 is not true for any value of x at all: expanding the left side gives 2x + 8, which can never equal 2x + 4 since 8 ≠ 4. x + 4 = 2x is also an equation, true only for the single value x = 4. The identity is 2(x + 4) ≡ 2x + 8.
- (b) (−5, −2) — A rotation of 180° about the origin reverses the sign of both coordinates, so Q = (−5, −2). A candidate who reverses the sign of only the y-coordinate, as if reflecting in the x-axis, gets (5, −2). A candidate who reverses the sign of only the x-coordinate, as if reflecting in the y-axis, gets (−5, 2). A candidate who swaps the coordinates instead of reversing their signs gets (2, 5).
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (c) x = (y + 24)/4 — Method: expand the bracket first, then undo the operations done to x in reverse order. Working: y = 4(x − 6) = 4x − 24, so y + 24 = 4x, so x = (y + 24)/4. Answer: x = (y + 24)/4. x = (y + 6)/4 comes from expanding the bracket incorrectly, treating 4(x − 6) as 4x − 6 instead of 4x − 24. x = 4y + 96 comes from multiplying by 4 instead of dividing by 4 to undo the multiplication, giving 4(y + 24) = 4y + 96. x = y/4 − 6 comes from dividing by 4 first without expanding the bracket, then subtracting 6 as if the bracket's operation still applied afterwards.
- (c) 3 — Gradient = (change in y) ÷ (change in x) = (11 − 5) ÷ (4 − 2) = 6 ÷ 2 = 3. A candidate who puts the change in x over the change in y instead would get 2 ÷ 6 = 1/3. A candidate who subtracts the y-coordinates in the reverse order, but not the x-coordinates, would get (5 − 11) ÷ (4 − 2) = −3. A candidate who adds the coordinates instead of subtracting them would get (11 + 5) ÷ (4 + 2) = 16/6 = 8/3.
- (c) y = 200 − 8x — Method: in a linear model the amount present at the start is the constant term and the steady rate of change is the gradient, which is negative because the amount is falling. Working: at x = 0 minutes there are 200 litres, so the constant term is 200; 8 litres are lost every minute, so after x minutes 8x litres have gone and the amount left is y = 200 − 8x. Answer: y = 200 − 8x. The distractors: y = 8x + 200 treats the draining as filling, so the butt would gain 8 litres a minute; y = 200x − 8 swaps the two numbers over, using the starting 200 litres as the rate per minute and the 8 litres per minute as the starting amount; y = −8x − 200 makes the starting amount negative as well as the rate, so the butt would begin 200 litres in deficit.
- (a) x = (y + 9) / 2 — Method: undo the subtraction of 9 first, then undo the multiplication by 2. Working: y = 2x − 9, so adding 9 to both sides gives y + 9 = 2x, then dividing both sides by 2 gives x = (y + 9) / 2. The value x = (y − 9) / 2 comes from a sign error, keeping the −9 instead of moving it to +9. The value x = 2(y + 9) comes from multiplying by 2 instead of dividing. The value x = y / 2 + 9 comes from dividing by 2 before adding 9, the wrong order of operations, instead of dividing the whole bracket.
- (a) 16 — Method: the future age is the present age plus the number of years, so form that equation and solve it. Working: 34 + x = 50, and subtracting 34 from both sides gives x = 50 − 34 = 16. Answer: 16. The distractors: 84 comes from adding the two ages instead of subtracting, 34 + 50; 50 comes from giving her future age rather than the number of years that pass; 24 comes from a column subtraction in which the smaller digit is taken from the larger in each column, 4 − 0 and 5 − 3, instead of exchanging.
- (b) 6x + 6 — Perimeter = 2[(2x + 5) + (x − 2)] = 2(3x + 3) = 6x + 6. A candidate who adds the length and width but forgets to double for the perimeter gets 3x + 3. A candidate who makes a sign error and adds 2 instead of subtracting it before doubling gets 2[(2x + 5) + (x + 2)] = 6x + 14. A candidate who multiplies the length and width instead of adding them, confusing the perimeter formula with the area formula, and then doubles that product, gets 2(2x + 5)(x − 2) = 4x² + 2x − 20.
- (d) 8(7x − 3) — Method: find the highest common factor of the two terms, write it in front of a bracket and divide each term by it. Working: 56 = 8 × 7 and 24 = 8 × 3, so the highest common factor is 8; dividing gives 56x ÷ 8 = 7x and 24 ÷ 8 = 3, and the subtraction sign stays between them. Answer: 8(7x − 3), which multiplies back out to 56x − 24. The distractors: 8(7x + 3) comes from dropping the minus sign of −24 while dividing; 8(56x − 3) comes from dividing only the number term by 8 and leaving 56x untouched inside the bracket; 8(7x − 16) comes from subtracting 8 from 24 instead of dividing 24 by 8.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (b) 8 — The perimeter is 2(x + (x + 3)) = 4x + 6, so 4x + 6 = 38, which gives 4x = 32 and x = 8. A candidate who forgets the '+3' and treats the rectangle as a square, solving 2(2x) = 38, gets x = 9.5. A candidate who forgets to double the sum of the sides, solving 2x + 3 = 38, gets x = 17.5. A candidate who uses 3x instead of x + 3 for the length, solving 2(x + 3x) = 38, gets x = 4.75.
- (a) x = 2 — Method: undo the subtraction first, then undo the multiplication, doing the same to both sides each time. Working: adding 2 to both sides gives 2x = 4, and dividing both sides by 2 gives x = 2. Answer: x = 2. The distractors: x = 4 comes from stopping at 2x = 4 and writing 4 as the value of x; x = 0 comes from subtracting 2 from both sides instead of adding it, giving 2x = 0; x = 8 comes from multiplying 4 by 2 instead of dividing by 2.
- (b) £115, and C = 40 + 25h is a formula — Substitute h = 3 into the rule, multiplying before adding. The hours cost 25 × 3 = 75, and adding the call-out fee gives 40 + 75 = 115, so the charge is £115. The rule itself links two different quantities, C and h, and lets one be worked out from the other, so it is a formula; an expression would have no equals sign in it. Adding the fee before multiplying gives 65 × 3 = 195, which charges the call-out fee three times over, and stopping at 40 + 25 leaves £65, the charge for a single hour.
Build your own mix at the worksheet builder.