Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
- (d) 1 hour 32 minutes — T = 40 × 1.8 + 20 = 72 + 20 = 92 minutes. Since 92 = 60 + 32, the cooking time is 1 hour 32 minutes. A candidate who rounds the mass to 2 kg before substituting gets 40 × 2 + 20 = 100 minutes = 1 hour 40 minutes. A candidate who forgets to add the 20 minutes gets 40 × 1.8 = 72 minutes = 1 hour 12 minutes. A candidate who multiplies the mass by (40 + 20) = 60 instead of substituting into the formula gets 1.8 × 60 = 108 minutes = 1 hour 48 minutes.
- (c) P — Sequence P has a common ratio of 2 (4 × 2 = 8, 8 × 2 = 16, 16 × 2 = 32), so it is geometric. Sequence Q has a common difference of 4, which is arithmetic, not geometric — a candidate who confuses a constant difference with a constant ratio picks Q. Sequence R has increasing differences of 3, 5, 7, a quadratic sequence, not geometric — a candidate who assumes any fast-growing sequence must be geometric picks R. Sequence S is the square numbers from 2² onwards (2², 3², 4², 5²), which is also quadratic, not geometric — a candidate who thinks squaring always means geometric growth picks S.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (c) £2.80 — 3n + 1.50 = 9.90, so 3n = 8.40 and n = 2.80, so each notebook costs £2.80. A candidate who forgets to subtract the cost of the pen and divides the total by 3 gets n = 9.90 ÷ 3 = £3.30. A candidate who adds the cost of the pen instead of subtracting it gets 3n = 11.40 and n = £3.80. A candidate who treats the pen as a fourth notebook and divides the total by 4 gets n = 9.90 ÷ 4 = £2.48 (2 d.p.).
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
- (c) 14 — Substitute b = 6 into 3b − 4: 3 × 6 − 4 = 18 − 4 = 14. 5 comes from treating 3b as 3 + b instead of 3 × b, giving 3 + 6 − 4. 6 comes from subtracting 4 from b before multiplying by 3, 3 × (6 − 4). 18 comes from working out 3 × 6 correctly but forgetting to subtract the 4.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (a) 12 — Method: write both ages as they were six years ago, call Leo's present age x, and form an equation from the comparison at that time. Working: six years ago Harry was 24 − 6 = 18 and Leo was x − 6, so 18 = 3(x − 6); expanding gives 18 = 3x − 18, adding 18 to both sides gives 36 = 3x, and dividing by 3 gives x = 12. Checking: six years ago Harry was 18 and Leo was 6, and 18 = 3 × 6. Answer: 12. The distractors: 6 comes from solving 18 = 3(x − 6) as far as Leo's age six years ago, 18 ÷ 3 = 6, and giving that as his age now; 8 comes from dividing Harry's present age by 3, 24 ÷ 3 = 8, using the multiple at the wrong moment in time; 36 comes from stopping at 3x = 36 and giving 36 as Leo's age.
- (d) An equation, true for one value of x — 2x + 5 = 17 is only true when x = 6, so it is an equation. A candidate who ignores the equals sign and focuses only on the x terms and numbers present picks the expression option. A candidate who sees an equals sign and assumes it must relate two different quantities, as a formula does, picks that option, missing that there is only one quantity, x, involved here. A candidate who wrongly checks whether both sides look similar in structure rather than testing specific values picks the identity option, missing that the two sides are not equal for every value of x.
- (a) 36 km/h — Speed is distance ÷ time. Convert 25 minutes to hours: 25 ÷ 60 = 5/12 hours. Then 15 ÷ (5/12) = 15 × 12/5 = 36 km/h. Dividing 15 by 25 without converting minutes to hours gives 0.6 km/h. Multiplying 15 by 25/60 instead of dividing by it gives 6.25 km/h. Working out the speed in km per minute, 0.6, and then multiplying by 24 instead of 60 gives 14.4 km/h.
- (a) They always charge the same, since 3(2n + 4) = 6n + 12. — Expand Advert A's formula by multiplying both terms inside the bracket by 3: 3 × 2n = 6n, and 3 × 4 = 12, giving 3(2n + 4) = 6n + 12, which is identical to Advert B's formula — so the two adverts always charge the same amount, whatever n is. Getting 6n + 4 comes from multiplying the 2n by 3 but leaving the 4 unmultiplied. Getting 2n + 7 comes from adding 3 to the bracket instead of multiplying by it. Saying it depends on n avoids expanding the bracket at all — once expanded, both formulas are identical for every value of n, so the cost can be compared directly.
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
- (d) 23 — Method: let the smallest integer be n, so the three consecutive integers are n, n + 1 and n + 2. Form the equation n + (n + 1) + (n + 2) = 72. Working: simplify the left side: 3n + 3 = 72, so 3n = 69, giving n = 23. Answer: 23. 24 comes from dividing 72 by 3 directly, 72 ÷ 3 = 24, which finds the middle integer rather than realising the three numbers differ. 25 comes from correctly finding n = 23 but reading off the largest integer, n + 2, instead of the smallest as asked. 21 comes from dividing first and subtracting after, (72 ÷ 3) − 3, instead of subtracting 3 before dividing by 3.
Build your own mix at the worksheet builder.