Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (c) x + 3 — Expand the bracket: 0.5(4x + 6) = 2x + 3. Then subtract the x: 2x + 3 − x = x + 3. The option 2x + 3 comes from expanding the bracket correctly but then forgetting to subtract the x at all. The option x + 6 comes from forgetting to multiply the 6 inside the bracket by 0.5 (treating it as 2x + 6), then subtracting x. The option 3x + 3 comes from adding the x instead of subtracting it: 2x + 3 + x = 3x + 3.
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (d) 5 — Method: rearrange the formula to make m the subject, then substitute F = 15.50. Working: F = 3 + 2.5m, so subtracting 3 from both sides gives F − 3 = 2.5m, then dividing by 2.5 gives m = (F − 3) / 2.5. Substituting F = 15.50: m = (15.50 − 3) / 2.5 = 12.50 / 2.5 = 5. The value 6.2 comes from dividing 15.50 by 2.5 without subtracting the fixed £3 first. The value 3.2 comes from dividing first and subtracting afterwards, in the wrong order: (15.50 / 2.5) − 3 = 3.2. The value 7.4 comes from adding £3 instead of subtracting it before dividing: (15.50 + 3) / 2.5 = 7.4.
- (b) 6x + 6 — Perimeter = 2[(2x + 5) + (x − 2)] = 2(3x + 3) = 6x + 6. A candidate who adds the length and width but forgets to double for the perimeter gets 3x + 3. A candidate who makes a sign error and adds 2 instead of subtracting it before doubling gets 2[(2x + 5) + (x + 2)] = 6x + 14. A candidate who multiplies the length and width instead of adding them, confusing the perimeter formula with the area formula, and then doubles that product, gets 2(2x + 5)(x − 2) = 4x² + 2x − 20.
- (a) y + 1 — The brother's age now is y − 4. In 5 years' time this becomes y − 4 + 5 = y + 1. A candidate who adds 4 instead of subtracting it, then adds 5, gets y + 4 + 5 = y + 9. A candidate who subtracts 5 instead of adding it gets y − 4 − 5 = y − 9. A candidate who works out the brother's current age but forgets to add on the 5 years gets y − 4.
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (a) 3ab — 3 × a × b means 3, a and b are all multiplied together, and in algebraic notation this is written with no multiplication signs: 3ab. Writing 3 + a + b turns every multiplication into an addition, giving a completely different expression. Writing a³b misreads the 3 as a power on a rather than as a coefficient in front of both letters. Writing 3a + b multiplies the 3 by a correctly but then adds b instead of also multiplying it in. The expression that means 3 × a × b is 3ab.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (c) 22 — p² means p × p. Substitute p = 2.5: p² = 6.25, so 4p² = 4 × 6.25 = 25, and 25 − 3 = 22. 97 comes from squaring 4p together instead of just p, (4 × 2.5)² − 3 = 10² − 3 = 97. 7 comes from using p instead of p², 4 × 2.5 − 3. 1 comes from squaring the 3 instead of the p, 4 × 2.5 − 3².
- (b) x = 5 — Area = length × width, so x(x + 3) = 40, which rearranges to x² + 3x − 40 = 0. This factorises as (x + 8)(x − 5) = 0: the two numbers in the brackets must multiply to −40 and add to +3, and the pair 8 and −5 does both. This gives x = −8 or x = 5. Since x is a length, it cannot be negative, so x = 5. A candidate who gives both solutions without rejecting the negative one, which cannot be a length, answers x = 5 or x = −8. A candidate who picks the wrong factor pair of 40, such as 10 and −4 instead of 8 and −5, gets (x + 10)(x − 4) = 0 and answers x = 4. A candidate who rejects the wrong root, keeping the negative solution instead of the positive one, answers x = −8.
- (d) 15b — Method: each balloon costs 15p, so b balloons cost 15 × b pence. Working: 15 × b = 15b. Answer: 15b. b + 15 comes from treating the 15p as a one-off addition rather than a rate applied to every balloon. b − 15 comes from misreading the situation as a discount rather than a cost per balloon. b/15 comes from dividing instead of multiplying, swapping the two operations.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
Build your own mix at the worksheet builder.