Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (c) 5 — Method: let a be the number of adult tickets, so the number of child tickets is 9 − a. Form the equation 10a + 6(9 − a) = 74. Working: expand the bracket: 10a + 54 − 6a = 74, so 4a = 20, giving a = 5. Answer: 5 adult tickets. 4 comes from correctly finding the number of child tickets but reporting it instead of the number of adult tickets asked for. 1.25 comes from a sign error expanding the bracket, writing 10a + 54 + 6a = 74 instead of subtracting, which gives 16a = 20. 7.4 comes from dividing the total takings by the adult ticket price only, ignoring the children entirely, 74 ÷ 10.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (d) 8 — Since the mean of the four numbers is 12.5, their total is 4 × 12.5 = 50. The three known numbers add up to 8 + 15 + 19 = 42, so n = 50 − 42 = 8. A candidate who multiplies the mean by 3 instead of 4 gets a total of 37.5, giving n = 37.5 − 42 = −4.5. A candidate who forgets to subtract the three known numbers and gives the total itself as n states n = 50. A candidate who subtracts the mean from the total of the three known numbers instead of the other way round gets n = 42 − 12.5 = 29.5.
- (a) 130 — Method: substitute the total bill into the formula, then subtract the fixed charge and divide by the cost per text message. Working: 24.50 = 18 + 0.05t, so 0.05t = 24.50 − 18 = 6.50, t = 6.50 ÷ 0.05 = 130. Answer: 130 extra text messages. 490 comes from dividing the whole bill by 0.05 without first subtracting the £18 fixed charge: 24.50 ÷ 0.05 = 490. 13 comes from dividing the £6.50 by 0.5 instead of 0.05, moving the decimal point one place too far: 6.50 ÷ 0.5 = 13. 65 comes from dividing the £6.50 by 0.1 instead of 0.05.
- (b) x ≥ 5 — Expand the bracket: 2(3x − 1) = 6x − 2, so the inequality is 6x − 2 ≥ 4x + 8. Subtract 4x from both sides and add 2 to both sides: 2x ≥ 10. Divide both sides by 2: x ≥ 5. A candidate who only multiplies the 3x by 2 and forgets to multiply the −1 gets 6x − 1 ≥ 4x + 8, leading to x ≥ 4.5. A candidate who adds 4x instead of subtracting it gets 10x ≥ 10, leading to x ≥ 1. A candidate who multiplies by 2 instead of dividing gets x ≥ 20.
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (a) 3ab — 3 × a × b means 3, a and b are all multiplied together, and in algebraic notation this is written with no multiplication signs: 3ab. Writing 3 + a + b turns every multiplication into an addition, giving a completely different expression. Writing a³b misreads the 3 as a power on a rather than as a coefficient in front of both letters. Writing 3a + b multiplies the 3 by a correctly but then adds b instead of also multiplying it in. The expression that means 3 × a × b is 3ab.
- (c) 5 hours — Substitute s = 48 into the relationship: t = 240 ÷ 48 = 5 hours. Inverting the relationship, s ÷ 240 = 48 ÷ 240 = 0.2, gives 0.2 hours. Misplacing the decimal point in the division, 240 ÷ 48 read as 4.8, gives 4.8 hours. Halving the speed to 24 mph by mistake before dividing, 240 ÷ 24 = 10, gives 10 hours.
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
Build your own mix at the worksheet builder.