Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 16 — k = 8m ÷ 5 = (8 × 10) ÷ 5 = 80 ÷ 5 = 16. A candidate who multiplies 8 by 10 but forgets to divide by 5 gets 80. A candidate who divides 10 by 8 and multiplies by 5, using the fraction upside down, gets 10 × 5 ÷ 8 = 6.25. A candidate who adds instead of substituting into the formula gets 8 + 10 = 18.
- (a) They always charge the same, since 3(2n + 4) = 6n + 12. — Expand Advert A's formula by multiplying both terms inside the bracket by 3: 3 × 2n = 6n, and 3 × 4 = 12, giving 3(2n + 4) = 6n + 12, which is identical to Advert B's formula — so the two adverts always charge the same amount, whatever n is. Getting 6n + 4 comes from multiplying the 2n by 3 but leaving the 4 unmultiplied. Getting 2n + 7 comes from adding 3 to the bracket instead of multiplying by it. Saying it depends on n avoids expanding the bracket at all — once expanded, both formulas are identical for every value of n, so the cost can be compared directly.
- (a) 30 US dollars — £24 is 6 times £4, and the same scale factor applies to US dollars, so multiply 5 by 6: 5 × 6 = 30, giving 30 US dollars. Multiplying £24 by 4/5, the pounds-per-dollar ratio, instead of by 5/4, the dollars-per-pound ratio, gives 24 × 4/5 = 19.2, applying the ratio the wrong way round and giving 19.20 US dollars. Adding the extra £20 straight onto the 5 as if £1 equalled 1 US dollar, 5 + 20 = 25, gives 25 US dollars. Multiplying £24 by 5 without first dividing by the original £4, 24 × 5 = 120, gives 120 US dollars.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (b) 6 — 3n + 4.5 = 22.5, so 3n = 18 and n = 6. A candidate who divides 22.5 by 3 first and ignores the 4.5 gets n = 7.5. A candidate who makes a sign error and forms the equation 3n − 4.5 = 22.5 gets 3n = 27 and n = 9. A candidate who divides by 3 before subtracting the 4.5, working out 22.5 ÷ 3 + 4.5, gets n = 12.
- (c) 22 — p² means p × p. Substitute p = 2.5: p² = 6.25, so 4p² = 4 × 6.25 = 25, and 25 − 3 = 22. 97 comes from squaring 4p together instead of just p, (4 × 2.5)² − 3 = 10² − 3 = 97. 7 comes from using p instead of p², 4 × 2.5 − 3. 1 comes from squaring the 3 instead of the p, 4 × 2.5 − 3².
- (d) 15b — Method: each balloon costs 15p, so b balloons cost 15 × b pence. Working: 15 × b = 15b. Answer: 15b. b + 15 comes from treating the 15p as a one-off addition rather than a rate applied to every balloon. b − 15 comes from misreading the situation as a discount rather than a cost per balloon. b/15 comes from dividing instead of multiplying, swapping the two operations.
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (a) Subtracting 4x gives 3 = 10, which is never true. — Method: try to solve the equation as normal and see what happens. Working: subtract 4x from both sides: 4x + 3 − 4x = 4x + 10 − 4x, giving 3 = 10. This statement is false for every value of x, so the equation has no solution. Answer: subtracting 4x gives 3 = 10, which is never true. "x would have to be negative" invents a constraint on x that the equation never states. "It's true for every x" confuses this equation with an identity, where both sides would simplify to the same expression. "x = 7" misreads the false statement 3 = 10 as something to solve for x, rather than recognising it means no solution exists.
- (c) x = −2 or x = 4 — The solutions of x² − 2x − 8 = 0 are the x-values where y = 0. From the table, y = 0 when x = −2 and when x = 4, so those are the two solutions. Distractor origins: x = −1 or x = 3 picks the pair of x-values that give equal (but non-zero) y-values instead of y = 0; x = 0 or x = −8 mixes up an x-value with its corresponding y-value; x = −2 only reads off one of the two roots and misses the other.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
Build your own mix at the worksheet builder.