Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (c) £2.80 — 3n + 1.50 = 9.90, so 3n = 8.40 and n = 2.80, so each notebook costs £2.80. A candidate who forgets to subtract the cost of the pen and divides the total by 3 gets n = 9.90 ÷ 3 = £3.30. A candidate who adds the cost of the pen instead of subtracting it gets 3n = 11.40 and n = £3.80. A candidate who treats the pen as a fourth notebook and divides the total by 4 gets n = 9.90 ÷ 4 = £2.48 (2 d.p.).
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (a) Subtracting 4x gives 3 = 10, which is never true. — Method: try to solve the equation as normal and see what happens. Working: subtract 4x from both sides: 4x + 3 − 4x = 4x + 10 − 4x, giving 3 = 10. This statement is false for every value of x, so the equation has no solution. Answer: subtracting 4x gives 3 = 10, which is never true. "x would have to be negative" invents a constraint on x that the equation never states. "It's true for every x" confuses this equation with an identity, where both sides would simplify to the same expression. "x = 7" misreads the false statement 3 = 10 as something to solve for x, rather than recognising it means no solution exists.
- (a) 30 US dollars — £24 is 6 times £4, and the same scale factor applies to US dollars, so multiply 5 by 6: 5 × 6 = 30, giving 30 US dollars. Multiplying £24 by 4/5, the pounds-per-dollar ratio, instead of by 5/4, the dollars-per-pound ratio, gives 24 × 4/5 = 19.2, applying the ratio the wrong way round and giving 19.20 US dollars. Adding the extra £20 straight onto the 5 as if £1 equalled 1 US dollar, 5 + 20 = 25, gives 25 US dollars. Multiplying £24 by 5 without first dividing by the original £4, 24 × 5 = 120, gives 120 US dollars.
- (b) 10 km — Method: find the constant speed from the graph (distance ÷ time for any point on the line), then multiply that speed by 20 minutes. Working: the line passes through (4 minutes, 2 km), so the speed is 2 ÷ 4 = 0.5 km per minute; in 20 minutes the cyclist travels 0.5 × 20 = 10 km. Answer: 10 km. Distractor refutation: 3 km comes from reading off the distance shown at the end of the plotted section (6 minutes) and stopping there, instead of extending the line to 20 minutes. 20 km comes from misreading the speed as 1 km per minute instead of 0.5 km per minute, doubling the true rate. 40 km comes from dividing 20 by the speed instead of multiplying by it, a reciprocal mix-up.
- (c) 16 km/h — Method: total distance = 12 + 8 = 20 km. Total time = 30 + 30 + 15 = 75 minutes = 1.25 hours. Average speed = total distance ÷ total time = 20 ÷ 1.25 = 16 km/h. Distractor origins: 20 km/h gives the total distance without ever dividing by the total time; 24 km/h uses only the speed of the first stage (12 km in 30 minutes), ignoring the second stage and the rest; 28 km/h averages the two separate stage speeds, 24 km/h and 32 km/h, instead of using total distance over total time.
- (b) 3 — Method: a term is any part of an expression separated from the rest by a + or − sign, including a number on its own. Working: 8 − 3x + 5x² splits at the + and − signs into 8, −3x and 5x² — that is three separate terms. Answer: 3. Ryan's answer of 2 comes from wrongly excluding the number 8, thinking a term must contain a letter. 5 comes from miscounting by treating the coefficients and powers as separate terms as well as the letters. 1 comes from treating the whole expression as a single term because it is written without brackets.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
- (a) They always charge the same, since 3(2n + 4) = 6n + 12. — Expand Advert A's formula by multiplying both terms inside the bracket by 3: 3 × 2n = 6n, and 3 × 4 = 12, giving 3(2n + 4) = 6n + 12, which is identical to Advert B's formula — so the two adverts always charge the same amount, whatever n is. Getting 6n + 4 comes from multiplying the 2n by 3 but leaving the 4 unmultiplied. Getting 2n + 7 comes from adding 3 to the bracket instead of multiplying by it. Saying it depends on n avoids expanding the bracket at all — once expanded, both formulas are identical for every value of n, so the cost can be compared directly.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
Build your own mix at the worksheet builder.