Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 130 — Method: substitute the total bill into the formula, then subtract the fixed charge and divide by the cost per text message. Working: 24.50 = 18 + 0.05t, so 0.05t = 24.50 − 18 = 6.50, t = 6.50 ÷ 0.05 = 130. Answer: 130 extra text messages. 490 comes from dividing the whole bill by 0.05 without first subtracting the £18 fixed charge: 24.50 ÷ 0.05 = 490. 13 comes from dividing the £6.50 by 0.5 instead of 0.05, moving the decimal point one place too far: 6.50 ÷ 0.5 = 13. 65 comes from dividing the £6.50 by 0.1 instead of 0.05.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (c) 26.6 — h² = 1.6² = 2.56, so B = 68 ÷ 2.56 = 26.5625, which rounds to 26.6 (1 d.p.). A candidate who forgets to square the height gets 68 ÷ 1.6 = 42.5. A candidate who squares the mass instead of the height gets 68² ÷ 1.6 = 2890.0. A candidate who truncates 26.5625 instead of rounding it gets 26.5.
- (b) 3 — Method: a term is any part of an expression separated from the rest by a + or − sign, including a number on its own. Working: 8 − 3x + 5x² splits at the + and − signs into 8, −3x and 5x² — that is three separate terms. Answer: 3. Ryan's answer of 2 comes from wrongly excluding the number 8, thinking a term must contain a letter. 5 comes from miscounting by treating the coefficients and powers as separate terms as well as the letters. 1 comes from treating the whole expression as a single term because it is written without brackets.
- (b) 8 kg — The cost above the flat £5 charge is 17 − 5 = £12. At £2 per kg, this covers 12 ÷ 2 = 6 kg above the first 2 kg, so the total weight is 2 + 6 = 8 kg. Dividing the full £17 by £2 per kg without first taking off the £5 flat charge gives 17 ÷ 2 = 8.5 kg. Taking off the £5 flat charge and dividing by £2 per kg, but forgetting to add back the 2 kg that the flat charge covers, gives 12 ÷ 2 = 6 kg. Taking off £2 instead of £5 as the flat charge, (17 − 2) ÷ 2 = 7.5 kg, swaps which number is the fixed fee.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (a) 36 km/h — Speed is distance ÷ time. Convert 25 minutes to hours: 25 ÷ 60 = 5/12 hours. Then 15 ÷ (5/12) = 15 × 12/5 = 36 km/h. Dividing 15 by 25 without converting minutes to hours gives 0.6 km/h. Multiplying 15 by 25/60 instead of dividing by it gives 6.25 km/h. Working out the speed in km per minute, 0.6, and then multiplying by 24 instead of 60 gives 14.4 km/h.
- (b) k − 5 — Method: the width is 5 less than the length, so subtract 5 from the length. Working: length − 5 = k − 5. Answer: k − 5. 5 − k comes from subtracting in the wrong order, taking the length away from 5 instead of the other way round. k + 5 comes from adding instead of subtracting, missing that the width is smaller than the length. 5k comes from multiplying the length by 5 instead of subtracting 5 from it.
- (c) 3x + 5 = 17 — An equation contains an equals sign and is true only for particular value(s) of the unknown — solving 3x + 5 = 17 gives the single value x = 4. 3x + 5 is an expression: it has no equals sign, so it cannot be solved, only simplified or evaluated. A = πr² is a formula: it shows the general relationship between different quantities (area and radius), rather than asking for one unknown value. 3(x + 5) ≡ 3x + 15 is an identity: the ≡ sign shows it is true for every value of x, not just one. The equation is 3x + 5 = 17.
- (c) 22 — p² means p × p. Substitute p = 2.5: p² = 6.25, so 4p² = 4 × 6.25 = 25, and 25 − 3 = 22. 97 comes from squaring 4p together instead of just p, (4 × 2.5)² − 3 = 10² − 3 = 97. 7 comes from using p instead of p², 4 × 2.5 − 3. 1 comes from squaring the 3 instead of the p, 4 × 2.5 − 3².
- (c) 12 cm — For a square, area = side². So side² = 144, giving side = ±12. Since a length must be positive, the side length is 12 cm. A candidate who gives both square roots without rejecting the negative one, which cannot be a length, answers 12 cm or −12 cm. A candidate who halves 144 instead of taking its square root gets 72 cm. A candidate who divides 144 by 4, confusing the area formula with a perimeter calculation, gets 36 cm.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (b) 20 — F = 4s, so when s = 5, F = 4 × 5 = 20. 9 comes from adding 4 and 5 instead of multiplying, the mistake described in the question. 25 comes from squaring s (5²) instead of multiplying by 4. 45 comes from writing the digits 4 and 5 next to each other instead of carrying out the multiplication.
Build your own mix at the worksheet builder.