- (b) 158 minutes — Rearranging C = 15 + 0.2m for m: subtract 15 from both sides to get C − 15 = 0.2m, then divide by 0.2: m = (C − 15)/0.2. Substituting C = 46.60: m = (46.60 − 15)/0.2 = 31.60/0.2 = 158. Answering 233 minutes comes from dividing the whole £46.60 by 0.2 without first taking off the £15 fixed charge. Answering 308 minutes comes from adding the £15 instead of subtracting it: (46.60 + 15)/0.2. Answering 218 minutes divides first and subtracts 15 afterwards, in the wrong order: 46.60/0.2 − 15 = 233 − 15 = 218. Ali made 158 minutes of calls.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (d) 4 — Method: compare the equation with the general form y = mx + c after writing the x term first, then read off the coefficient of x. Working: y = 6 + 4x can be written as y = 4x + 6, so comparing with y = mx + c gives m = 4. Answer: the gradient is 4. The value 6 comes from reading off the constant, written first in the equation, and treating it as the gradient because it comes before the x term. The value 10 comes from adding the two numbers in the equation, 6 + 4, instead of reading off the coefficient of x. The value 24 comes from multiplying the two numbers in the equation, 6 × 4, instead of reading off the coefficient of x.
- (b) 5 cm³ — When P = 32, V = 480 ÷ 32 = 15 cm³. When P = 24, V = 480 ÷ 24 = 20 cm³. The increase in volume is 20 − 15 = 5 cm³. Giving only the second volume, 20 cm³, forgets to subtract the first volume. Giving only the first volume, 15 cm³, answers the wrong part of the question. Subtracting the two pressures instead of the two volumes, 32 − 24 = 8, mixes up which quantity the question asks for.
- (a) 16 — Method: the future age is the present age plus the number of years, so form that equation and solve it. Working: 34 + x = 50, and subtracting 34 from both sides gives x = 50 − 34 = 16. Answer: 16. The distractors: 84 comes from adding the two ages instead of subtracting, 34 + 50; 50 comes from giving her future age rather than the number of years that pass; 24 comes from a column subtraction in which the smaller digit is taken from the larger in each column, 4 − 0 and 5 − 3, instead of exchanging.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (c) 3x + 5 = 17 — An equation contains an equals sign and is true only for particular value(s) of the unknown — solving 3x + 5 = 17 gives the single value x = 4. 3x + 5 is an expression: it has no equals sign, so it cannot be solved, only simplified or evaluated. A = πr² is a formula: it shows the general relationship between different quantities (area and radius), rather than asking for one unknown value. 3(x + 5) ≡ 3x + 15 is an identity: the ≡ sign shows it is true for every value of x, not just one. The equation is 3x + 5 = 17.
- (c) x + 3 — Expand the bracket: 0.5(4x + 6) = 2x + 3. Then subtract the x: 2x + 3 − x = x + 3. The option 2x + 3 comes from expanding the bracket correctly but then forgetting to subtract the x at all. The option x + 6 comes from forgetting to multiply the 6 inside the bracket by 0.5 (treating it as 2x + 6), then subtracting x. The option 3x + 3 comes from adding the x instead of subtracting it: 2x + 3 + x = 3x + 3.
- (d) 37.0 — C = 5(98.6 − 32) ÷ 9 = 5 × 66.6 ÷ 9 = 333 ÷ 9 = 37.0. A candidate who forgets to subtract 32 first gets 5 × 98.6 ÷ 9 = 54.8 (1 d.p.). A candidate who forgets the 5 ÷ 9 factor entirely and just works out F − 32 gets 66.6. A candidate who multiplies by 9 ÷ 5 instead of 5 ÷ 9 gets 66.6 × 9 ÷ 5 = 119.9 (1 d.p.).
- (b) 8 kg — The cost above the flat £5 charge is 17 − 5 = £12. At £2 per kg, this covers 12 ÷ 2 = 6 kg above the first 2 kg, so the total weight is 2 + 6 = 8 kg. Dividing the full £17 by £2 per kg without first taking off the £5 flat charge gives 17 ÷ 2 = 8.5 kg. Taking off the £5 flat charge and dividing by £2 per kg, but forgetting to add back the 2 kg that the flat charge covers, gives 12 ÷ 2 = 6 kg. Taking off £2 instead of £5 as the flat charge, (17 − 2) ÷ 2 = 7.5 kg, swaps which number is the fixed fee.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.