Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) x = 2 — Method: expand the bracket by multiplying both terms inside it by 2, then undo the addition and the multiplication in turn. Working: expanding gives 2x + 6 = 10; subtracting 6 from both sides gives 2x = 4; dividing both sides by 2 gives x = 2. Answer: x = 2. The distractors: x = 5 comes from dividing both sides by 2 first, reaching x + 3 = 5 and writing 5 without taking the 3 away; x = 8 comes from adding 6 to both sides instead of subtracting it, giving 2x = 16; x = 3.5 comes from expanding 2(x + 3) as 2x + 3, multiplying only the x by the 2, which leads to 2x = 7.
- (d) 3m³ — Method: multiply the powers of m by adding their indices, then bring the number coefficient to the front. Working: m² × m has indices 2 and 1; add them to get 3, giving m³, then × 3 gives 3m³. Answer: 3m³. 3m² comes from multiplying the indices instead of adding them: 2 × 1 = 2, giving m², then × 3 = 3m². m³ comes from correctly combining the m's but dropping the coefficient 3. m⁶ comes from multiplying the index by the coefficient instead of writing the coefficient in front: taking the 2 in m² and the 3 to give m raised to the power 2 × 3, which is m⁶, with the lone m left out.
- (c) 45 km/h — Method: speed = distance ÷ time = 90 ÷ 2 = 45 km/h. Distractor origins: 180 km/h multiplies distance by time instead of dividing (90 × 2 = 180); 88 km/h subtracts the time from the distance (90 − 2 = 88); 92 km/h adds the time to the distance (90 + 2 = 92).
- (d) 9 — Method: expand the brackets fully first, then collect the x-terms and constants before dividing. Working: 4(x − 3) = 4x − 12, so 4x − 12 = 2x + 6; 4x − 2x = 6 + 12; 2x = 18; x = 9. Answer: x = 9. 4.5 comes from expanding only the x-term in the bracket and forgetting to multiply the 3, giving 4x − 3 = 2x + 6, then 2x = 9, x = 4.5. −3 comes from a sign error when expanding, giving 4x + 12 = 2x + 6, then 2x = −6, x = −3. 3 comes from a sign error collecting the x-terms, adding instead of subtracting: 4x + 2x = 6 + 12, so 6x = 18, x = 3.
- (d) 6 — Method: write an expression for each person's savings after w weeks, and set them equal. Working: 40 + 6w = 10 + 11w. Subtract 6w from both sides: 40 = 10 + 5w. Subtract 10: 30 = 5w, so w = 6. Answer: 6 weeks. 0 comes from setting only the weekly amounts equal, 6w = 11w, and ignoring the different starting amounts entirely. 10 comes from adding the two starting amounts and dividing by the difference in weekly amounts, (40 + 10) ÷ (11 − 6), instead of forming and solving the correct equation. 1.76 comes from adding the two weekly amounts instead of subtracting them when rearranging, (40 − 10) ÷ (11 + 6).
- (c) y = 9x + 3 — Method: in a linear cost model the charge that is paid once is the constant term and the charge made for each item is the coefficient of x. Working: each pizza costs £9, so x pizzas cost 9x pounds; the £3 delivery fee is paid once whatever the value of x, so it is added on as a constant and the total cost is y = 9x + 3. Answer: y = 9x + 3. The distractors: y = 3x + 9 comes from swapping the two charges over, treating the £3 delivery as a per-pizza cost and the £9 as the one-off charge; y = 9x leaves out the delivery fee altogether, which undercharges every order by £3; y = 12x comes from adding the delivery fee to the price of each pizza, £9 + £3 = £12 each, so the fee is charged once per pizza instead of once per order.
- (c) L/5 − 3 — Each of the 5 equal pieces is L/5 metres long, and removing 3 metres from one piece gives L/5 − 3. Subtracting the 3 metres before dividing by 5, (L − 3)/5, divides the removed length between all 5 pieces instead of taking it from just one. Dividing only the 3 by 5 instead of dividing L by 5, L − 3/5, divides the wrong number. Writing 5/L − 3 inverts the fraction, swapping which number is the numerator.
- (c) 32 — The terms are 60, 53, 46, 39, 32 — each found by subtracting 7 from the term before, so the 5th term is 32. Subtracting 7 five times from the first term instead of four times, 60 − 7 × 5 = 25, treats the first term as if it came before the sequence starts. Adding 7 four times instead of subtracting, 60 + 7 × 4 = 88, uses the wrong operation. Stopping one term early gives the 4th term, 39.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (d) 3 — Method: add the constant term to both sides first, then divide by the coefficient of x. Working: 3x = 4 + 5 = 9; x = 9 ÷ 3 = 3. Answer: x = 3. −1/3 comes from a sign error when moving the 5, subtracting instead of adding: 3x = 4 − 5 = −1, then x = −1/3. 6 comes from subtracting the coefficient 3 instead of dividing by it: 9 − 3 = 6. 9 comes from correctly finding 3x = 9 but forgetting to divide by 3.
- (c) 16 km/h — Method: total distance = 12 + 8 = 20 km. Total time = 30 + 30 + 15 = 75 minutes = 1.25 hours. Average speed = total distance ÷ total time = 20 ÷ 1.25 = 16 km/h. Distractor origins: 20 km/h gives the total distance without ever dividing by the total time; 24 km/h uses only the speed of the first stage (12 km in 30 minutes), ignoring the second stage and the rest; 28 km/h averages the two separate stage speeds, 24 km/h and 32 km/h, instead of using total distance over total time.
- (b) £115, and C = 40 + 25h is a formula — Substitute h = 3 into the rule, multiplying before adding. The hours cost 25 × 3 = 75, and adding the call-out fee gives 40 + 75 = 115, so the charge is £115. The rule itself links two different quantities, C and h, and lets one be worked out from the other, so it is a formula; an expression would have no equals sign in it. Adding the fee before multiplying gives 65 × 3 = 195, which charges the call-out fee three times over, and stopping at 40 + 25 leaves £65, the charge for a single hour.
- (c) t = 1 second and t = 5 seconds — The ball is at ground level when h = 0, which happens when either bracket is zero. t − 1 = 0 gives t = 1, and 5 − t = 0 gives t = 5. The option with t = −1 makes a sign error solving the first bracket. The option with t = −5 makes a sign error solving the second bracket, treating 5 − t = 0 as if it gave a negative solution. The option with t = 4 seconds is an arithmetic slip in solving 5 − t = 0.
- (c) 6 — Method: substitute the value, work out the top of the fraction first, then the division, and add the 3 last. Working: the top gives 10 − 4 = 6, dividing by 2 gives 6 ÷ 2 = 3, and adding 3 gives 3 + 3 = 6. Answer: 6. The distractors: 11 comes from dividing only the 4 by 2 instead of the whole of the top, giving 10 − 2 + 3; 4.5 comes from dividing the + 3 by 2 as well, giving (10 − 4 + 3) ÷ 2; 0 comes from subtracting the wrong way round on the top, giving (4 − 10) ÷ 2 = −3 and then −3 + 3.
- (b) y = 2x − 1 — Method: in a rule that multiplies and then adds, the multiplier is the step in the outputs for each step of 1 in the input, and the number added on is the output when the input is 0. Working: the inputs 0, 1, 2 rise in ones while the outputs −1, 1, 3 rise by 2 each time, so the input is multiplied by 2; an input of 0 gives 2 × 0 = 0 and the output must be −1, so 1 is subtracted. Answer: y = 2x − 1, checked against the last pair by 2 × 2 − 1 = 3. The distractors: y = 2x + 1 comes from finding the multiplier 2 correctly and then reading the output at an input of 0 as +1 instead of −1; y = x − 1 comes from taking the multiplier as 1 because the inputs go up in ones, instead of using the step in the outputs; y = 3x − 1 comes from reading the largest output, 3, as the multiplier.
Build your own mix at the worksheet builder.