Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (a) y = (x − 2)² + 3 — Since (x − 2)² is never negative, (x − 2)² + 3 is always at least 3, so y can never equal 0 and the graph never crosses the x-axis. The other three graphs are all given in a factorised or difference-of-squares form that shows two real roots: y = (x − 2)(x + 3) crosses at x = 2 and x = −3; y = x² − 9 = (x − 3)(x + 3) crosses at x = 3 and x = −3; y = (x + 4)(x − 1) crosses at x = −4 and x = 1.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (b) t − 1 — Method: "fewer than" means a subtraction, and the amount taken away is taken away from the quantity being compared with. Working: Grace has t books and Noah has one book fewer, so Noah has t with 1 taken off, written t − 1. Answer: t − 1. The distractors: t + 1 comes from reading "fewer" as "more" and adding instead of subtracting; 1 − t comes from writing the subtraction the wrong way round, taking Grace's books from the 1 rather than the 1 from Grace's books; t comes from giving the number of books Grace has, which is not the person the question asks about.
- (d) w ≤ 630 — 'No more than 630 kg' means the weight can be exactly 630 kg or anything less, so the correct inequality is w ≤ 630, using 'less than or equal to' to include the limit itself. Writing w < 630 excludes 630 kg itself, as though the limit could not be reached exactly. Writing w ≥ 630 reverses the direction, describing a minimum weight rather than a maximum. Writing w > 630 both reverses the direction and excludes the boundary value. The inequality describing the lift's weight limit is w ≤ 630.
- (b) 6x + 6 — Perimeter = 2[(2x + 5) + (x − 2)] = 2(3x + 3) = 6x + 6. A candidate who adds the length and width but forgets to double for the perimeter gets 3x + 3. A candidate who makes a sign error and adds 2 instead of subtracting it before doubling gets 2[(2x + 5) + (x + 2)] = 6x + 14. A candidate who multiplies the length and width instead of adding them, confusing the perimeter formula with the area formula, and then doubles that product, gets 2(2x + 5)(x − 2) = 4x² + 2x − 20.
- (c) 5 — Method: let a be the number of adult tickets, so the number of child tickets is 9 − a. Form the equation 10a + 6(9 − a) = 74. Working: expand the bracket: 10a + 54 − 6a = 74, so 4a = 20, giving a = 5. Answer: 5 adult tickets. 4 comes from correctly finding the number of child tickets but reporting it instead of the number of adult tickets asked for. 1.25 comes from a sign error expanding the bracket, writing 10a + 54 + 6a = 74 instead of subtracting, which gives 16a = 20. 7.4 comes from dividing the total takings by the adult ticket price only, ignoring the children entirely, 74 ÷ 10.
- (a) 8 — Method: rate = height gained ÷ time taken. Working: height gained = 52 − 20 = 32 m, time taken = 4 minutes, so rate = 32 ÷ 4 = 8 metres per minute. Answer: the rate is 8 metres per minute. 32 comes from working out the height gained but forgetting to divide by the time taken. 13 comes from dividing the final height, 52, by the time taken instead of the height gained. 5 comes from dividing the starting height, 20, by the time taken instead of the height gained.
- (c) 6 — Method: rate = amount of fuel used ÷ time taken. Working: fuel used = 50 − 38 = 12 litres, time taken = 2 hours, so rate = 12 ÷ 2 = 6 litres per hour. Answer: the rate is 6 litres per hour. 44 comes from finding the average of the two fuel amounts, (50 + 38) ÷ 2, instead of the fuel used. 12 comes from working out the fuel used but forgetting to divide by the time taken. 19 comes from dividing the remaining fuel, 38, by the time taken instead of the fuel used.
- (d) 16 boys and 14 girls — Method: write the number of boys in terms of the number of girls, then use the total for the class. Working: if there are g girls then there are g + 2 boys, so g + (g + 2) = 30, that is 2g + 2 = 30, so 2g = 28 and g = 14; the number of boys is 14 + 2 = 16. Answer: 16 boys and 14 girls, which total 30 and differ by 2. The distractors: 14 boys and 16 girls comes from substituting for the wrong group, writing b + (b + 2) = 30 and then calling b the number of boys; 15 boys and 15 girls comes from halving 30 and never using the difference; 17 boys and 13 girls comes from adding the whole 2 to one half of the class and taking the whole 2 off the other half, which leaves a difference of 4.
- (b) £14 — Method: read the fixed charge (the cost at 0 miles) and the rate (the cost per extra mile) from the graph, then use them to work out the cost for a distance beyond the part that is plotted. Working: the graph shows a fixed charge of £2 at 0 miles, and the cost rises by £2 for every extra mile, so for 6 miles the cost is £2 + (£2 × 6) = £2 + £12 = £14. Answer: £14. Distractor refutation: £12 comes from multiplying the rate by the distance and leaving out the £2 fixed charge. £8 comes from misreading the rate as £1 per mile instead of £2 per mile. £24 comes from adding the fixed charge to the rate first and then multiplying the total by the distance, instead of multiplying the rate by the distance and then adding the fixed charge.
- (d) 1 hour 32 minutes — T = 40 × 1.8 + 20 = 72 + 20 = 92 minutes. Since 92 = 60 + 32, the cooking time is 1 hour 32 minutes. A candidate who rounds the mass to 2 kg before substituting gets 40 × 2 + 20 = 100 minutes = 1 hour 40 minutes. A candidate who forgets to add the 20 minutes gets 40 × 1.8 = 72 minutes = 1 hour 12 minutes. A candidate who multiplies the mass by (40 + 20) = 60 instead of substituting into the formula gets 1.8 × 60 = 108 minutes = 1 hour 48 minutes.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (c) 8a + 2 — The perimeter of a rectangle is twice the length plus twice the width: P = 2(3a + 2) + 2(a − 1) = (6a + 4) + (2a − 2) = 8a + 2. Answering 5a adds the length and width once each but doubles only one of them, missing that a rectangle has two of each side. Answering 8a + 6 distributes the 2 into (a − 1) correctly as far as 2a, but then adds 2 instead of subtracting it, as though the bracket had been (a + 1). Answering 12a + 8 uses the length for all four sides instead of using the length twice and the width twice, as if the field were a square with side (3a + 2). The perimeter of the field is (8a + 2) metres.
- (d) 66 — 6 and (4x + 3) are correct factors of 24x + 18. — Substituting x=2 into 24x+18: 24×2+18=48+18=66. Checking the factorisation: 6×4x=24x and 6×3=18, so 6(4x+3)=24x+18, matching the original expression — 6 and (4x+3) are correctly identified as factors. A candidate who substitutes x=2 into (4x+3) but forgets to multiply by the factor 6 afterwards would compute just 4×2+3=11. A candidate who adds 24 and 18 together before multiplying by x, instead of multiplying 24 by x first, would compute (24+18)×2=84. A candidate who distributes the 6 over only the first term inside the brackets, forgetting the second, would check the factorisation as 6×4x=24x but leave the 3 unmultiplied, getting 24x+3 instead of 24x+18 — and would wrongly conclude that 6 and (4x+3) are not correct factors.
Build your own mix at the worksheet builder.