Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 3y² — 'y squared, multiplied by 3' means the square is applied to y only, and the result is then multiplied by 3, written as 3y². Writing y³ mistakes the multiplication by 3 for an extra factor of y, adding to the power instead of using a coefficient. Writing (3y)² squares the whole of 3y, including the 3, which gives 9y² rather than 3y² — the square should apply to y alone. Writing 3 + y² adds the 3 instead of multiplying by it. The expression for 'y squared, multiplied by 3' is 3y².
- (d) −3 — Method: rewrite the equation in the form y = mx + c, then read off the gradient. Working: y = 4 − 3x can be written as y = −3x + 4, so comparing with y = mx + c gives m = −3. Answer: the gradient is −3. The value 3 comes from ignoring the negative sign on the x term. The value 4 comes from reading off the y-intercept instead of the gradient. The value −4 comes from a sign error, applying the negative sign to the intercept instead of the gradient.
- (c) 5 hours — Substitute s = 48 into the relationship: t = 240 ÷ 48 = 5 hours. Inverting the relationship, s ÷ 240 = 48 ÷ 240 = 0.2, gives 0.2 hours. Misplacing the decimal point in the division, 240 ÷ 48 read as 4.8, gives 4.8 hours. Halving the speed to 24 mph by mistake before dividing, 240 ÷ 24 = 10, gives 10 hours.
- (c) (x + 7)/4 — Method: dividing an expression by a number is written as a fraction, with the whole expression on top. Working: (x + 7) ÷ 4 = (x + 7)/4. Answer: (x + 7)/4. 4/(x + 7) comes from writing the numbers the wrong way round, putting 4 on top. 4(x + 7) comes from reading ÷ as ×, multiplying instead of dividing. (x + 7) − 4 comes from reading ÷ as −, subtracting instead of dividing.
- (d) 7n − 2 — Method: find how much the total cost rises each month, then find the constant that fits the cost for one month. Working: the cost rises by £7 for each extra month (12 − 5 = 7, 19 − 12 = 7, 26 − 19 = 7), so the cost has the form 7n + c. Substituting n = 1: 7(1) + c = 5, so c = −2. Answer: the total cost in pounds is 7n − 2. The value 7n comes from leaving out the constant. The value 7n + 5 comes from using the cost of one month as the constant directly, without subtracting the monthly rise first. The value 5n + 7 comes from swapping the roles of the cost of one month, £5, and the monthly rise, £7 — using the cost of one month as the coefficient of n and the rise as the constant.
- (a) 5 — Method: apply the machine's operation to the input, and treat zero as an input like any other. Working: the machine gives 0 + 5, and counting on 5 from zero leaves the 5 unchanged. Answer: 5. The distractors: 0 comes from assuming that an input of 0 must give an output of 0, which is true for a machine that multiplies but not for one that adds; −5 comes from subtracting 5 instead of adding it; 6 comes from treating the input as 1 rather than 0 and working out 1 + 5.
- (b) Week 7 — The height after n weeks is 4 + 5(n − 1) = 5n − 1. The plant is taller than 30 cm when its height, 5n − 1, is more than 30, written 5n − 1 > 30; add 1 to both sides (5n > 31) and divide by 5, which gives n > 6.2, so the first whole week is week 7, where the height is 5 × 7 − 1 = 34 cm. Rounding 6.2 down to week 6 without checking gives a height of only 5 × 6 − 1 = 29 cm, which is not yet taller than 30 cm. Counting one week too many gives week 8. Working out 30 ÷ 5 = 6 and then subtracting 1 from the week number instead of from the height gives week 5.
- (c) s = P / 4 — Method: undo the multiplication by 4 by dividing both sides by 4. Working: P = 4s, so dividing both sides by 4 gives s = P / 4. The value s = 4P comes from multiplying by 4 instead of dividing — using the wrong inverse operation. The value s = P + 4 comes from adding 4 instead of dividing. The value s = P − 4 comes from subtracting 4 instead of dividing.
- (d) 23 — Method: let the smallest integer be n, so the three consecutive integers are n, n + 1 and n + 2. Form the equation n + (n + 1) + (n + 2) = 72. Working: simplify the left side: 3n + 3 = 72, so 3n = 69, giving n = 23. Answer: 23. 24 comes from dividing 72 by 3 directly, 72 ÷ 3 = 24, which finds the middle integer rather than realising the three numbers differ. 25 comes from correctly finding n = 23 but reading off the largest integer, n + 2, instead of the smallest as asked. 21 comes from dividing first and subtracting after, (72 ÷ 3) − 3, instead of subtracting 3 before dividing by 3.
- (b) y = 7 — Method: one of the equations already gives the value of x, so that value is substituted into the other equation. Working: replacing x with 2 in x + y = 9 gives 2 + y = 9, so y = 9 − 2 = 7. Answer: y = 7, and the pair x = 2 with y = 7 satisfies both equations. The distractors: y = 11 comes from rearranging x + y = 9 as y = 9 + x and adding instead of subtracting; y = 9 comes from ignoring the x term and reading the total as the value of y; y = 4.5 comes from halving 9, as though x and y had to be equal.
- (b) 1215 — Method: generate the terms one at a time with the term-to-term rule and compare each with 1000 as you go, stopping at the first one that passes it. Working: the terms are 5, then 5 × 3 = 15, then 45, then 135, then 405, and 405 × 3 = 1215; 405 is still below 1000 while 1215 is above it. Answer: 1215. The distractors: 405 comes from stopping at the last term that is still below 1000 instead of giving the first one above it; 3645 comes from carrying on one term too far, past the first term that passes 1000; 2187 comes from using the multiplier 3 as the first term as well, generating 3, 9, 27, 81, 243, 729, 2187 instead of the sequence described.
- (b) 6 — Method: for any point that lies on y = k/x, the value of k is found by multiplying the x-coordinate and the y-coordinate together, since k = x × y. Working: k = 2 × 3 = 6. Answer: k = 6. Distractor refutation: 1.5 comes from dividing the y-coordinate by the x-coordinate instead of multiplying them. 5 comes from adding the two coordinates instead of multiplying them. 9 comes from misreading the point's x-coordinate as 3 instead of 2, then multiplying 3 × 3.
- (b) A straight line. — y = 3x + 2 is a linear function, since the highest power of x is 1, so its graph is a straight line with gradient 3 and y-intercept 2. Saying it is a U-shaped curve confuses a linear graph with a quadratic graph, which has an x² term. Saying it decreases then increases describes a curve with a turning point, which a straight line does not have. Saying it gets closer to an axis but never reaches it describes a reciprocal graph, y = k/x, not a linear one.
- (b) 60 km/h — Method: the gradient of a distance-time graph is the change in distance divided by the change in time, and for a journey at a steady rate that gradient is the speed. Working: the change in distance is 195 − 15 = 180 km and the change in time is 3 hours, so the gradient is 180 ÷ 3 = 60 km/h. Answer: 60 km/h. The distractors: 180 km/h comes from stopping at the change in distance and never dividing by the 3 hours; 195 km/h comes from reading the final marker as the rate instead of working with the change between the two markers; 3 km/h comes from quoting the time taken, which belongs on the bottom of the fraction, as though it were the value of the fraction itself.
- (b) 2n + 3 — Method: multiply the cost per mile by the number of miles to get an expression, then add the fixed fee as a separate term. Working: n miles at £2 each is 2n; add the £3 fixed fee: 2n + 3. Answer: 2n + 3. 3n + 2 comes from swapping the fee and the rate round, treating £3 as the rate per mile and £2 as the fixed fee. 5n comes from adding the fee and the rate together first (3 + 2 = 5) and multiplying the result by n, instead of keeping the fixed fee as its own term. 2n − 3 comes from subtracting the fixed fee instead of adding it.
Build your own mix at the worksheet builder.