Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) x = 0 or x = −7 — Factorising: x² + 7x = x(x + 7) = 0, so x = 0 or x + 7 = 0, giving x = 0 or x = −7. A candidate who divides both sides of the original equation by x, which loses the solution x = 0, gets only x = −7. A candidate who makes a sign error solving x + 7 = 0 gets x = 0 or x = 7. A candidate who misreads the coefficient and doubles it gets x = 0 or x = −14.
- (c) y = 3x + 2 — Method: divide the change in the outputs by the change in the inputs to find the multiplier, then put one pair of values into the rule to find the number added on. Working: the output rises by 11 − 5 = 6 while the input rises by 3 − 1 = 2, so the multiplier is 6 ÷ 2 = 3; with an input of 1, 3 × 1 = 3 and the output is 5, so 2 is added. Answer: y = 3x + 2, checked against the second pair by 3 × 3 + 2 = 11. The distractors: y = 3x − 2 comes from finding the multiplier 3 and then subtracting the 2 instead of adding it; y = 2x + 3 comes from swapping the multiplier and the number added on; y = x + 4 comes from assuming the input is multiplied by 1 and using 5 − 1 = 4 as the number added on.
- (b) h = 2A/b — The height has been multiplied by the base and the result then divided by 2, so undo the division first. Multiplying both sides by 2 gives 2A = bh. Undoing the multiplication by the base comes next: dividing both sides by b gives 2A/b = h, so h = 2A/b. Dividing by 2 instead of multiplying gives A/(2b), a quarter of the correct height; multiplying by the base instead of dividing gives 2Ab; writing b/(2A) turns the final fraction upside down.
- (a) y = −2x − 1 — Method: the gradient is the change in y divided by the change in x with both differences taken in the same order, and the constant then comes from substituting either point into y = mx + c. Working: m = (−9 − 3) ÷ (4 − (−2)) = (−12) ÷ 6 = −2, so the line is y = −2x + c; substituting (−2, 3) gives 3 = −2 × (−2) + c = 4 + c, so c = 3 − 4 = −1. Answer: y = −2x − 1. The distractors: y = −2x + 1 comes from rearranging 3 = 4 + c the wrong way round and taking the constant as 4 − 3; y = 2x + 7 comes from losing the minus sign when −12 is divided by 6 and then substituting correctly, 3 = 2 × (−2) + c; y = −(1/2)x + 2 comes from writing the gradient upside down as the change in x over the change in y, 6 ÷ (−12).
- (a) 3ab — 3 × a × b means 3, a and b are all multiplied together, and in algebraic notation this is written with no multiplication signs: 3ab. Writing 3 + a + b turns every multiplication into an addition, giving a completely different expression. Writing a³b misreads the 3 as a power on a rather than as a coefficient in front of both letters. Writing 3a + b multiplies the 3 by a correctly but then adds b instead of also multiplying it in. The expression that means 3 × a × b is 3ab.
- (b) (−1, 6) — '6 units above the x-axis' gives a y-coordinate of 6, and the x-coordinate is given as −1, so F = (−1, 6). (6, −1) comes from swapping the x- and y-coordinates. (−1, −6) comes from treating 'above' as a negative direction instead of positive. (1, 6) comes from dropping the negative sign on the given x-coordinate.
- (c) 71 — Method: square x first, then multiply by 3, then subtract 4, following the order of operations. Working: x² = 5² = 25; 3 × 25 = 75; 75 − 4 = 71. Answer: 71. 221 comes from squaring (3x) as a whole first: (3 × 5)² = 225, then − 4 = 221, squaring the coefficient along with x. 75 comes from correctly working out 3x² but forgetting to subtract the 4. 3 comes from subtracting the 4 from x before squaring: (5 − 4)² × 3 = 3, doing the operations in the wrong order.
- (b) 4 — Method: subtract the constant term from both sides first, then divide by the coefficient of x. Working: 4x = 24 − 8 = 16; x = 16 ÷ 4 = 4. Answer: x = 4. Priya's 6 comes from dividing 24 by 4 without first subtracting the 8, ignoring the constant term; substituting it back gives 4 × 6 + 8 = 32, not 24, which is why she is wrong. 16 comes from correctly finding 4x = 16 but forgetting to divide by 4. 12 comes from subtracting the coefficient 4 instead of dividing by it: 16 − 4 = 12. 8 comes from correctly finding 4x = 16 but then halving instead of dividing by 4.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (a) 20 — Method: the paper has run out when S = 0, so substitute S = 0 into the equation and solve for t. Working: 0 = 480 − 24t, so 24t = 480, and t = 480 / 24 = 20. Answer: it takes 20 minutes. The value 480 comes from giving the starting number of sheets, the intercept of the equation, instead of solving for t. The value 456 comes from working out 480 − 24 and stopping after one step instead of solving the equation fully. The value 0.05 comes from inverting the division, working out 24 / 480 instead of 480 / 24.
- (c) P — Sequence P has a common ratio of 2 (4 × 2 = 8, 8 × 2 = 16, 16 × 2 = 32), so it is geometric. Sequence Q has a common difference of 4, which is arithmetic, not geometric — a candidate who confuses a constant difference with a constant ratio picks Q. Sequence R has increasing differences of 3, 5, 7, a quadratic sequence, not geometric — a candidate who assumes any fast-growing sequence must be geometric picks R. Sequence S is the square numbers from 2² onwards (2², 3², 4², 5²), which is also quadratic, not geometric — a candidate who thinks squaring always means geometric growth picks S.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (d) x = 2 — Method: expand the bracket by multiplying both terms inside it by 2, then undo the addition and the multiplication in turn. Working: expanding gives 2x + 6 = 10; subtracting 6 from both sides gives 2x = 4; dividing both sides by 2 gives x = 2. Answer: x = 2. The distractors: x = 5 comes from dividing both sides by 2 first, reaching x + 3 = 5 and writing 5 without taking the 3 away; x = 8 comes from adding 6 to both sides instead of subtracting it, giving 2x = 16; x = 3.5 comes from expanding 2(x + 3) as 2x + 3, multiplying only the x by the 2, which leads to 2x = 7.
- (d) The fixed call-out fee, charged before the hourly rate. — Method: compare the formula with C = (fixed charge) + (rate) × h, where the fixed charge is the part that does not depend on h. Working: in C = 40 + 25h, the term 25h depends on the number of hours, h, but 40 does not change however many hours the job takes. Answer: 40 is the fixed call-out fee. 'The hourly rate' confuses the fixed term with the coefficient of h, which is actually 25. 'The total cost for a job lasting 1 hour' comes from substituting h = 1 into the formula (40 + 25 = 65) rather than reading off the constant term. 'The number of hours worked before charging starts' wrongly treats the constant, which is in pounds, as if it were measured in hours.
- (c) (2, 6) — Method: substitute the x-coordinate of each point into the rule for the line (y = 3 × x) and compare it with the point's y-coordinate. Working: the line passes through the origin and rises 3 squares for every 1 square across, so at x = 2 the line's y-value is 3 × 2 = 6, giving the point (2, 6). Answer: (2, 6). Distractor refutation: (2, 3) comes from counting only 3 squares up in total between the origin and x = 2, instead of 3 squares up for every 1 square across, halving the true rise. (3, 2) comes from swapping the x-coordinate and the y-coordinate round. (2, 5) comes from a miscounted gridline, landing one square below the line.
Build your own mix at the worksheet builder.