Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 6x(2x + 3) — The highest common factor of 12x² and 18x is 6x. Dividing each term by 6x gives 12x² ÷ 6x = 2x and 18x ÷ 6x = 3, so 12x² + 18x = 6x(2x + 3). A candidate who only takes out the number 6 (missing the x) gets 6(2x² + 3x), which is not fully factorised. A candidate who only takes out 2x (missing the extra factor of 3 in 6) gets 2x(6x + 9), also not fully factorised — the bracket still shares a common factor. A candidate who takes out 3x instead of the full 6x gets 3x(4x + 6), which again is not fully factorised since 4x + 6 shares a common factor of 2.
- (b) 2(x + 3) = 2x + 6 — An identity is true for every value of x, not just one. Expanding 2(x + 3) gives 2x + 6, which matches the right-hand side exactly — so the equation holds for every value of x, and it is an identity. Each of the other three is only true for one particular value of x: 5x − 3 = 12 gives x = 3, x + 7 = 15 gives x = 8, and 3x = x + 10 gives x = 5 — these are ordinary equations, not identities.
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (c) 6 — Method: substitute the value, work out the top of the fraction first, then the division, and add the 3 last. Working: the top gives 10 − 4 = 6, dividing by 2 gives 6 ÷ 2 = 3, and adding 3 gives 3 + 3 = 6. Answer: 6. The distractors: 11 comes from dividing only the 4 by 2 instead of the whole of the top, giving 10 − 2 + 3; 4.5 comes from dividing the + 3 by 2 as well, giving (10 − 4 + 3) ÷ 2; 0 comes from subtracting the wrong way round on the top, giving (4 − 10) ÷ 2 = −3 and then −3 + 3.
- (c) 70 — Method: the numbers of tiles form a sequence in which the same amount is added for each extra row, so the total for a number of rows is that amount multiplied by the number of rows. Working: 20 − 10 = 10 and 30 − 20 = 10, so each row adds 10 tiles; 7 rows therefore need 7 lots of 10, that is 7 × 10. Answer: 70. The distractors: 80 comes from counting one row too many and giving the total for 8 rows; 17 comes from adding the 10 tiles to the 7 rows instead of multiplying; 10 comes from giving the number of tiles in a single row rather than the total for all the rows.
- (a) 3 — Method: substitute the given value into the formula and carry out the subtraction in the order the formula is written. Working: replacing m with 8 gives L = 8 − 5, and 8 − 5 = 3. Answer: 3. The distractors: 13 comes from adding 5 to 8 instead of subtracting it; 40 comes from reading m − 5 as a multiplication and working out 8 × 5; −3 comes from subtracting the wrong way round and working out 5 − 8.
- (d) $y = x^2 - 2x - 3$ — Method: read the two x-intercepts (roots) from the graph, write the quadratic as the product of the corresponding factors, then expand. Working: the curve crosses the x-axis at x = −1 and x = 3, so the equation factorises as (x + 1)(x − 3), which expands to x² − 2x − 3. Answer: y = x² − 2x − 3. Distractor refutation: y = x² − x − 6 comes from misreading the left-hand crossing point as x = −2 instead of x = −1, giving factors (x + 2)(x − 3). y = x² − x − 2 comes from misreading the right-hand crossing point as x = 2 instead of x = 3, giving factors (x + 1)(x − 2). y = x² + 2x − 3 comes from writing the factors as (x − 1)(x + 3), swapping which root gets the plus sign and which gets the minus sign, giving the wrong sign on the x term.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (d) −3 — Substitute y = 11 into y = 5 − 2x, giving 11 = 5 − 2x. Subtracting 5 from both sides gives 6 = −2x, so x = 6 ÷ (−2) = −3. A candidate who mishandles the negative sign when rearranging, treating the equation as 6 = 2x, gets x = 3. A candidate who correctly finds −2x = 6 but forgets to divide by 2 at all gets x = 6. A candidate who adds 5 and 11 instead of subtracting, getting 2x = 16, gets x = 8.
- (d) x = −2 and x = 3 — The roots are the x-values where y = 0. Reading the table, y = 0 at x = −2 and at x = 3, so these are the two roots. Choosing x = −3 and x = 4 picks the endpoints of the table, where y = 6, not where y = 0. Choosing x = −1 and x = 2 picks values near the curve's lowest points, where y = −4, not where the curve crosses the axis. Choosing x = 0 and x = 1 picks the two x-values in the middle of the table without checking their y-values, which are both −6, not 0.
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
- (d) The fixed call-out fee, charged before the hourly rate. — Method: compare the formula with C = (fixed charge) + (rate) × h, where the fixed charge is the part that does not depend on h. Working: in C = 40 + 25h, the term 25h depends on the number of hours, h, but 40 does not change however many hours the job takes. Answer: 40 is the fixed call-out fee. 'The hourly rate' confuses the fixed term with the coefficient of h, which is actually 25. 'The total cost for a job lasting 1 hour' comes from substituting h = 1 into the formula (40 + 25 = 65) rather than reading off the constant term. 'The number of hours worked before charging starts' wrongly treats the constant, which is in pounds, as if it were measured in hours.
- (d) (0, −10) — The y-intercept occurs where x = 0. Substituting x = 0 into y = x² + 3x − 10 gives y = 0 + 0 − 10 = −10, so the graph crosses the y-axis at (0, −10). The option (0, 3) mistakenly uses the coefficient of x instead of the constant term. The option (0, 10) makes a sign error, dropping the negative from the constant term. The option (−10, 0) swaps the x- and y-coordinates, which would instead be a point on the x-axis, not the y-axis.
- (c) 3 — Gradient = (change in y) ÷ (change in x) = (11 − 5) ÷ (4 − 2) = 6 ÷ 2 = 3. A candidate who puts the change in x over the change in y instead would get 2 ÷ 6 = 1/3. A candidate who subtracts the y-coordinates in the reverse order, but not the x-coordinates, would get (5 − 11) ÷ (4 − 2) = −3. A candidate who adds the coordinates instead of subtracting them would get (11 + 5) ÷ (4 + 2) = 16/6 = 8/3.
Build your own mix at the worksheet builder.