- (a) 11 — Method: work out each term separately using the rule n² − 3, then subtract. Working: 6th term = 6² − 3 = 36 − 3 = 33. 5th term = 5² − 3 = 25 − 3 = 22. Difference: 33 − 22 = 11. Answer: 11. 8 comes from subtracting the constant −3 once at the end instead of it already being included in both terms, (36 − 25) − 3. 1 comes from working out (6 − 5)² instead of finding 6² and 5² separately and then subtracting. −11 comes from subtracting in the wrong order, the 5th term minus the 6th term instead of the 6th minus the 5th.
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (b) 1 — Method: replace the letter with its value, work out the multiplication first and the subtraction afterwards. Working: 3n = 3 × 1 = 3, so the expression becomes 3 − 2, which is 1. Answer: 1. The distractors: 3 comes from substituting into 3n but stopping before the 2 is taken away; −1 comes from subtracting the wrong way round and working out 2 − 3; 5 comes from adding the 2 instead of subtracting it, giving 3 + 2.
- (d) (3, 5) — Method: the quadrant a point lies in is decided by the signs of its two coordinates, and in the first quadrant both coordinates are positive. Working: (−2, 3) has a negative x-coordinate, so it sits to the left of the y-axis; (4, −1) has a negative y-coordinate, so it sits below the x-axis; (−1, −4) has both coordinates negative; only (3, 5) has a positive x-coordinate and a positive y-coordinate. Answer: (3, 5). The distractors: (−2, 3) is chosen by candidates who check only the y-coordinate and take a positive height as enough; (4, −1) is chosen by those who check only the x-coordinate; (−1, −4) is chosen by those who number the quadrants from the bottom left, so that the region with two negative coordinates is called the first.
- (a) P = 100I / (RT) — Method: undo the operations done to P in reverse order — multiply by 100, then divide by R and by T. Working: I = PRT/100, so 100I = PRT, so P = 100I / (RT). Answer: P = 100I / (RT). P = IRT/100 comes from leaving R and T in the numerator instead of moving them to the denominator. P = 100RT/I comes from swapping P and I when rearranging. P = 100I/R comes from dividing by R only and forgetting to also divide by T.
- (c) 5x² — A term is one part of an expression, separated from the others by a + or − sign. The expression 5x² − 3x + 7 has three terms: 5x², −3x and 7. Distractor origins: 5x² − 3x combines two terms together, not a single term; −3x + 7 also combines two terms together; 5x² − 3x + 7 gives the whole expression, not a single term.
- (b) 40 — The differences between consecutive terms are 3, 5, 7, 9, increasing by 2 each time, so the next difference is 11, giving 29 + 11 = 40. A candidate who reuses the last difference of 9 without increasing it gets 29 + 9 = 38. A candidate who increases the difference by only 1 instead of 2 gets 29 + 10 = 39. A candidate who reuses the first difference of 3 instead of the pattern gets 29 + 3 = 32.
- (b) 9 — Add the two equations to eliminate y: (x + y) + (x − y) = 15 + 3, so 2x = 18, and x = 9 (then y = 15 − 9 = 6). A candidate who reports the value of y instead of x would give 6. A candidate who forgets to divide by 2 after adding would give 18. A candidate who simply subtracts the two totals (15 − 3) instead of adding the equations would give 12.
- (b) It crosses the x-axis, since the minimum is below it. — A minimum turning point at (3, −4) means the lowest value the curve reaches is y = −4, which is below the x-axis (y = 0); since the curve opens upward from there, it must rise up through y = 0 on both sides, crossing the x-axis twice. Saying it does not cross confuses 'the minimum is negative' with 'the whole curve stays negative' — a minimum below the axis guarantees the curve rises above it elsewhere. Saying it touches the x-axis once at (3, −4) mistakes the turning point itself for a root — the turning point is not on the x-axis at all here, since its y-coordinate is −4, not 0. Saying it is impossible to tell ignores that the two facts given — that the turning point is a minimum, and that its y-coordinate is negative — are together enough to decide the number of crossings without knowing the equation.
- (a) y = x² + 2 — A quadratic equation, with x², gives a graph shaped like a symmetrical U (or an upside-down U). Of the four equations, y = x² + 2 is quadratic, so it gives this U-shape. y = x³ + 2 is cubic, giving an S-shaped curve rather than a symmetrical U. y = 2x + 2 is linear, giving a straight line. y = 2/x is reciprocal, giving two separate curved branches rather than a single U-shape.
- (d) 6n + 3 — Method: find the price per passenger, then find the booking fee that fits a booking for 1 passenger. Working: the cost rises by £6 for each extra passenger (15 − 9 = 6, 21 − 15 = 6, 27 − 21 = 6), so the cost has the form 6n + c. Substituting n = 1: 6(1) + c = 9, so c = 3. Answer: the cost in pounds is 6n + 3. 6n ignores the booking fee altogether. 6n + 9 uses the cost of one passenger, £9, as the fee without first subtracting the £6 per-passenger price. 9n + 6 swaps the two numbers, using the first cost as the price per passenger and the difference as the fee.
- (d) It is n-shaped, since the x² coefficient is negative. — The coefficient of x² is −2, which is negative, so the quadratic curve opens downward — shaped like an n, with a maximum turning point. Saying it is U-shaped focuses only on x² being non-negative and ignores that the −2 in front of it flips the whole curve to open downward. Saying it is a straight line confuses having a constant term with being linear — any equation with an x² term is a curve, not a line. Saying it repeatedly rises and falls like a wave describes a trigonometric graph such as y = sin x, not a quadratic.
- (d) 3m³ — Method: multiply the powers of m by adding their indices, then bring the number coefficient to the front. Working: m² × m has indices 2 and 1; add them to get 3, giving m³, then × 3 gives 3m³. Answer: 3m³. 3m² comes from multiplying the indices instead of adding them: 2 × 1 = 2, giving m², then × 3 = 3m². m³ comes from correctly combining the m's but dropping the coefficient 3. m⁶ comes from multiplying the index by the coefficient instead of writing the coefficient in front: taking the 2 in m² and the 3 to give m raised to the power 2 × 3, which is m⁶, with the lone m left out.
- (d) 2x − 26 — Method: multiply each term inside the bracket by the 2 in front of it, and keep the sign that belongs to each term. Working: 2 × x = 2x and 2 × 13 = 26; the bracket contains a subtraction, so the second term is subtracted. Answer: 2x − 26. The distractors: 2x − 13 comes from multiplying only the x by 2 and copying the 13 across unchanged; 2x + 26 comes from multiplying both terms correctly but losing the minus sign that belongs to the second term; 2x − 11 comes from subtracting 2 from 13 instead of multiplying 13 by 2.
- (d) x² − 49 — Area = length × width = (x + 7)(x − 7). Expanding: x × x = x², x × (−7) = −7x, 7 × x = 7x, 7 × (−7) = −49. The two middle terms −7x and 7x cancel, leaving x² − 49. A candidate who misremembers the difference-of-two-squares result as a sum gets x² + 49. A candidate who makes a sign error and treats both middle terms as −7x instead of cancelling gets x² − 14x − 49. A candidate who confuses area with perimeter and simply adds the length and width gets 2x.