Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 7 — Method: compare the equation with y = mx + c, where m is the gradient. Working: in y = 7x − 2, the coefficient of x is 7. Answer: the gradient is 7. −2 comes from confusing the gradient with the y-intercept. −7 comes from a sign error, treating the coefficient of x as negative. 2 comes from using the y-intercept but dropping its sign.
- (c) 3 — Substituting y = 3 into 4x − y = 9 gives 4x − 3 = 9, so 4x = 12, and x = 3. A candidate who adds 3 instead of subtracting it, making a sign error when substituting, would get 4x + 3 = 9, so 4x = 6 and x = 1.5. A candidate who forgets to divide by 4 after finding 4x = 12 would write x = 12. A candidate who subtracts 4 instead of dividing by it would get 12 − 4 = 8.
- (a) 5 — A factor of the whole expression must divide every term exactly. 15x + 20 = 5(3x + 4), so 5 is a factor. Distractor origins: 3 divides 15x exactly but does not divide 20 exactly; 4 divides 20 exactly but does not divide 15x exactly; 10 also divides 20 exactly but does not divide 15x exactly, so it is a factor of only one term, not of the whole expression.
- (d) (−1, 4) — In parallelogram ABCD the side DC is parallel and equal to the side AB, so D = C − AB. The vector from A to B is (2 − (−3), 1 − 1) = (5, 0), so D = (4 − 5, 4 − 0) = (−1, 4). A candidate who adds this vector to C instead of subtracting it gets (4 + 5, 4 + 0) = (9, 4). A candidate who subtracts A's coordinates from C's rather than the vector AB, and drops the minus sign on −3 while doing so, works out (4 − 3, 4 − 1) and gets (1, 3). A candidate who makes only the y-part of that slip, working out 4 − 1 instead of 4 − 0, gets (−1, 3).
- (a) 216 — The cube numbers are formed by cubing 1, 2, 3, 4, 5, ..., so the next one is 6³ = 216. A candidate who squares 6 instead of cubing it gets 6² = 36. A candidate who assumes the sequence doubles each time gets 125 × 2 = 250. A candidate who uses 5 × 6² instead of 6 × 6 × 6 gets 180.
- (a) the second quadrant — Method: the quadrant is settled by the signs of the two coordinates, not by their size; the quadrants are numbered anticlockwise, starting from the region where both coordinates are positive. Working: the x-coordinate −3 is negative, so the point lies to the left of the y-axis; the y-coordinate 0.5 is positive, so it lies above the x-axis; the region that is both left of the y-axis and above the x-axis is the second. Answer: the second quadrant. The distractors: 'the first quadrant' comes from ignoring the minus sign on −3; 'the third quadrant' comes from treating 0.5 as a negative value because it is smaller than 1, when in fact any number above zero is positive; 'the fourth quadrant' comes from reading the pair the wrong way round, as though the point were (0.5, −3).
- (a) 7 — Method: multiply both sides by 3 to clear the fraction, then solve the resulting equation. Working: 2x + 1 = 5 × 3 = 15. Subtract 1: 2x = 14. Divide by 2: x = 7. Answer: 7. 2 comes from ignoring the denominator altogether, treating the equation as 2x + 1 = 5 without multiplying by 3 first. 8 comes from a sign error, adding 1 to 15 instead of subtracting it, giving 2x = 16. 14 comes from correctly reaching 2x = 14 but stopping there, without dividing by 2 to find x.
- (d) x = 7 or x = −7 — Method: take the square root of both sides, remembering a square root can be positive or negative. Since x² = 49, x = √49 or x = −√49, so x = 7 or x = −7. Distractor origins: x = 7 forgets the negative root; x = −7 keeps only the negative root and drops the positive one; x = 24.5 comes from dividing 49 by 2 instead of taking a square root.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (c) the fourth quadrant — Method: read the sign of each coordinate in turn, then count round the regions, which are numbered anticlockwise from the one where both coordinates are positive. Working: the x-coordinate 5 is positive, so A is to the right of the y-axis; the y-coordinate −3 is negative, so A is below the x-axis; right of the y-axis and below the x-axis is the fourth of the four regions. Answer: the fourth quadrant. The distractors: 'the first quadrant' comes from ignoring the minus sign on the y-coordinate and treating the point as (5, 3); 'the second quadrant' comes from writing the pair the wrong way round and locating (−3, 5) instead; 'the third quadrant' comes from assuming that any point with a negative coordinate belongs to the region where the minus signs are, without checking the other coordinate.
- (b) m = w + 8 — To make m the subject of w = m − 8, add 8 to both sides so the subtraction is undone: m = w + 8. Writing m = w − 8 forgets to change the operation at all — it just relabels the equation without moving the 8 across. Writing m = 8 − w swaps the order and puts the wrong sign on w, as if the equation had been w = 8 − m instead. Writing m = w/8 mistakes subtraction for a scaling relationship and divides by 8 instead of adding it. The correct rearrangement is m = w + 8.
- (c) 70 — Method: the numbers of tiles form a sequence in which the same amount is added for each extra row, so the total for a number of rows is that amount multiplied by the number of rows. Working: 20 − 10 = 10 and 30 − 20 = 10, so each row adds 10 tiles; 7 rows therefore need 7 lots of 10, that is 7 × 10. Answer: 70. The distractors: 80 comes from counting one row too many and giving the total for 8 rows; 17 comes from adding the 10 tiles to the 7 rows instead of multiplying; 10 comes from giving the number of tiles in a single row rather than the total for all the rows.
- (b) 158 minutes — Rearranging C = 15 + 0.2m for m: subtract 15 from both sides to get C − 15 = 0.2m, then divide by 0.2: m = (C − 15)/0.2. Substituting C = 46.60: m = (46.60 − 15)/0.2 = 31.60/0.2 = 158. Answering 233 minutes comes from dividing the whole £46.60 by 0.2 without first taking off the £15 fixed charge. Answering 308 minutes comes from adding the £15 instead of subtracting it: (46.60 + 15)/0.2. Answering 218 minutes divides first and subtracts 15 afterwards, in the wrong order: 46.60/0.2 − 15 = 233 − 15 = 218. Ali made 158 minutes of calls.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
Build your own mix at the worksheet builder.