Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (d) x = (y + 8) / 3 — Method: add 8 to both sides, then divide the whole side by 3. Working: y = 3x − 8, so adding 8 to both sides gives y + 8 = 3x, then dividing both sides by 3 gives x = (y + 8) / 3. The value x = y + 8 / 3 is Priya's version, which comes from dividing only the 8 by 3 instead of dividing the whole expression y + 8 by 3. The value x = (y − 8) / 3 comes from a sign error, keeping −8 instead of moving it to +8. The value x = 3(y + 8) comes from multiplying by 3 instead of dividing.
- (b) 60 km/h — Method: the gradient of a distance-time graph is the change in distance divided by the change in time, and for a journey at a steady rate that gradient is the speed. Working: the change in distance is 195 − 15 = 180 km and the change in time is 3 hours, so the gradient is 180 ÷ 3 = 60 km/h. Answer: 60 km/h. The distractors: 180 km/h comes from stopping at the change in distance and never dividing by the 3 hours; 195 km/h comes from reading the final marker as the rate instead of working with the change between the two markers; 3 km/h comes from quoting the time taken, which belongs on the bottom of the fraction, as though it were the value of the fraction itself.
- (a) 6 — Subtracting the second equation from the first: the x-terms, 4x and 4x, cancel; the y-terms combine as 3y − (−y) = 4y; and the right-hand sides give 25 − 1 = 24. This gives 4y = 24, so y = 6. A candidate who subtracts in the wrong order would get 4y = 1 − 25 = −24, so y = −6. A candidate who forgets the sign on the −y term, treating 3y − y as 2y, would get 2y = 24, so y = 12. A candidate who divides 24 by 6 instead of 4 would get y = 4.
- (d) 21 − 3n — Method: find the common difference, then find the constant that fits the first term. Working: 15 − 18 = −3, 12 − 15 = −3, 9 − 12 = −3, so the terms decrease by 3 each time and the nth term has the form c − 3n. Substituting n = 1: c − 3(1) = 18, so c = 21. Answer: the nth term is 21 − 3n. The value 18 − 3n comes from using the first term as c directly, without adding back the difference that was removed. The value 3n − 21 comes from a sign error that flips the whole expression. The value −3n comes from using only the common difference and leaving out the constant.
- (d) 8 — Method: compare the equation with y = mx + c, where c is the y-intercept. Working: in y = 3x + 8, the constant term is 8. Answer: the y-intercept is 8. 3 comes from confusing the y-intercept with the gradient. −8 comes from a sign error, treating the constant term as negative. 11 comes from wrongly adding the gradient and the constant term together.
- (a) x = 4, y = −3 — Method: both equations contain +y with the same coefficient, so subtracting one equation from the other removes y. Working: (2x + y) − (x + y) = 5 − 1 gives x = 4; substituting x = 4 into x + y = 1 gives 4 + y = 1, so y = −3. Answer: x = 4, y = −3, which also satisfies 8 − 3 = 5. The distractors: x = 4, y = 5 comes from rearranging x + y = 1 as y = 1 + x; x = −2, y = 3 comes from eliminating x by doubling the first equation and then reading −y = 3 as y = 3; x = 6, y = −5 comes from adding the constants instead of subtracting them while eliminating y, taking x as 5 + 1.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (a) 18 cm² — Method: substitute the width into the formula, applying the index to the letter before multiplying by the 2 in front of it. Working: x² = 3 × 3 = 9, and then A = 2 × 9 = 18, so the area is 18 cm². Answer: 18 cm². The distractors: 36 cm² comes from multiplying 2 by 3 first and squaring afterwards, giving (2 × 3)²; 12 cm² comes from doubling instead of squaring, so that x² is replaced by 2x and the calculation becomes 2 × 2 × 3; 6 cm² comes from working out 2 × 3 and never applying the index at all.
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (b) 20 — F = 4s, so when s = 5, F = 4 × 5 = 20. 9 comes from adding 4 and 5 instead of multiplying, the mistake described in the question. 25 comes from squaring s (5²) instead of multiplying by 4. 45 comes from writing the digits 4 and 5 next to each other instead of carrying out the multiplication.
- (c) 9 — Method: replace the letter with the value given for it, then work out the multiplication before the addition. Working: 5y means 5 × y, and 5 × 0 = 0, so the expression becomes 0 + 9, which is 9. Answer: 9. The distractors: 14 comes from treating 5 × 0 as 5, a common slip with zero, and then adding the 9; 0 comes from assuming that an expression containing a zero must itself be zero, so the + 9 is ignored; 45 comes from multiplying the whole expression by 5 instead of multiplying only y, giving 5 × (0 + 9).
- (b) x = 2 and x = −5 — Set each factor equal to zero: x − 2 = 0 gives x = 2, and x + 5 = 0 gives x = −5, so the graph crosses the x-axis at x = 2 and x = −5. Writing x = −2 and x = 5 flips the sign of both roots. Writing x = 2 and x = 5 keeps the first root correct but forgets to flip the sign for the second factor, using +5 instead of solving x + 5 = 0. Writing x = −2 and x = −5 flips the sign of the first root only, from solving x − 2 = 0 as x = −2.
- (c) 4n + 3 — Method: use the given number of extra tiles per pattern as the coefficient of n, then find the constant that fits pattern 1. Working: each pattern adds 4 tiles, so the expression has the form 4n + c. Substituting n = 1: 4(1) + c = 7, so c = 3. Answer: the number of tiles in pattern n is 4n + 3. The value 4n comes from leaving out the constant c altogether. The value 4n + 7 comes from using pattern 1's total, 7, as the constant directly instead of subtracting the difference first. The value 7n + 4 comes from swapping the roles of the number of tiles in pattern 1 and the number added each time.
- (b) x = 4 — Method: every point on a vertical line has the same x-coordinate, so its equation sets x equal to a number, and that number is the x-coordinate of any point known to be on the line. Working: the line is vertical and passes through (4, 7), whose x-coordinate is 4, so every point on the line has x-coordinate 4 and the equation is x = 4. Answer: x = 4. The distractors: y = 7 is the horizontal line through the same point, obtained by fixing the y-coordinate instead of the x-coordinate; x = 7 uses the right form but takes the y-coordinate of the point rather than its x-coordinate; y = 4x treats the 4 as a gradient and gives a sloping line through the origin, which does not pass through (4, 7) at all.
Build your own mix at the worksheet builder.