Printable · GCSE Foundation · ages 14-16
Algebra worksheet — GCSE Foundation
Fifteen questions across the algebra statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Algebra worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) the y-axis, and 12 — Method: coordinates are written (x, y), so the first number is the distance across and the second the distance up; a point whose first coordinate is 0 has not moved across from the origin and therefore lies on the vertical axis. Working: in (0, 12) the first number is 0, so P is on the y-axis, and the second number, 12, is the y-coordinate of P. Answer: the y-axis, and 12. The distractors: 'the x-axis, and 12' comes from mixing up which axis the condition 'the first coordinate is 0' describes; 'the y-axis, and 0' comes from placing P correctly but reading the pair the wrong way round, so that the first number is quoted as the y-coordinate; 'the x-axis, and 0' comes from making both of those mistakes at once.
- (b) h = 2A/b — The height has been multiplied by the base and the result then divided by 2, so undo the division first. Multiplying both sides by 2 gives 2A = bh. Undoing the multiplication by the base comes next: dividing both sides by b gives 2A/b = h, so h = 2A/b. Dividing by 2 instead of multiplying gives A/(2b), a quarter of the correct height; multiplying by the base instead of dividing gives 2Ab; writing b/(2A) turns the final fraction upside down.
- (a) x ≈ 6.70 — Since the two roots sum to 7, the other root is 7 − 0.30 = 6.70. The option 7.30 comes from adding the given root to 7 instead of subtracting it. The option 6.30 comes from subtracting 0.70 (one minus the given root) rather than the given root itself. The option 0.70 confuses the required root with the amount by which the given root falls short of 1.
- (d) The fixed call-out fee, charged before the hourly rate. — Method: compare the formula with C = (fixed charge) + (rate) × h, where the fixed charge is the part that does not depend on h. Working: in C = 40 + 25h, the term 25h depends on the number of hours, h, but 40 does not change however many hours the job takes. Answer: 40 is the fixed call-out fee. 'The hourly rate' confuses the fixed term with the coefficient of h, which is actually 25. 'The total cost for a job lasting 1 hour' comes from substituting h = 1 into the formula (40 + 25 = 65) rather than reading off the constant term. 'The number of hours worked before charging starts' wrongly treats the constant, which is in pounds, as if it were measured in hours.
- (a) 20 — Method: the paper has run out when S = 0, so substitute S = 0 into the equation and solve for t. Working: 0 = 480 − 24t, so 24t = 480, and t = 480 / 24 = 20. Answer: it takes 20 minutes. The value 480 comes from giving the starting number of sheets, the intercept of the equation, instead of solving for t. The value 456 comes from working out 480 − 24 and stopping after one step instead of solving the equation fully. The value 0.05 comes from inverting the division, working out 24 / 480 instead of 480 / 24.
- (b) −0.5 — Method: gradient = change in height ÷ horizontal distance, and the height decreases so the change is negative. Working: change in height = 5 − 25 = −20, horizontal distance = 40, so gradient = −20 ÷ 40 = −0.5. Answer: the gradient is −0.5. 0.5 comes from dropping the negative sign, ignoring that the zip-line descends. 2 comes from inverting the gradient, dividing the horizontal distance by the drop in height instead of the other way round. −0.8 comes from dividing the drop by the platform height, 25, instead of by the horizontal distance, 40.
- (b) 12.5 — Method: apply the term-to-term rule to the term just written, and keep the exact value even when halving does not give a whole number. Working: the term before the one wanted is 25, and halving it means working out 25 ÷ 2, which is 12 with 1 left over to share, giving a half. Answer: 12.5. The distractors: 12 comes from halving 25 and then cutting the result down to a whole number; 0 comes from treating the sequence as one with a constant difference and taking 25 away from 25; 6.25 comes from halving twice and giving the term after the next one.
- (b) P = 4s — A formula is a rule connecting two or more different quantities, so that one of them can be worked out once the others are known. P = 4s does exactly that: it gives P from s. The line with no equals sign is an expression; the line with an equals sign and a single unknown letter is an equation, because it is solved to find that letter; the line joined by a comparison sign is an inequality.
- (b) 10 km — Method: find the constant speed from the graph (distance ÷ time for any point on the line), then multiply that speed by 20 minutes. Working: the line passes through (4 minutes, 2 km), so the speed is 2 ÷ 4 = 0.5 km per minute; in 20 minutes the cyclist travels 0.5 × 20 = 10 km. Answer: 10 km. Distractor refutation: 3 km comes from reading off the distance shown at the end of the plotted section (6 minutes) and stopping there, instead of extending the line to 20 minutes. 20 km comes from misreading the speed as 1 km per minute instead of 0.5 km per minute, doubling the true rate. 40 km comes from dividing 20 by the speed instead of multiplying by it, a reciprocal mix-up.
- (b) 28 — Method: find the common difference, then use the position-to-term rule (or extend the sequence) to reach the 9th term. Working: the common difference is 7 − 4 = 3, so the nth term is 4 + 3(n − 1). For n = 9: 4 + 3 × 8 = 4 + 24 = 28. Answer: 28. 27 comes from using 3n instead of 3n + 1, dropping the constant term from the rule, 3 × 9 = 27. 31 comes from extending from the 5th term by one step too many, adding 3 five times instead of four, 16 + 3 × 5. 25 comes from extending by one step too few, adding 3 three times instead of four, 16 + 3 × 3.
- (d) 15 — Substituting x = 3 into y = 5x gives y = 5 × 3 = 15. A candidate who adds instead of multiplying would get 5 + 3 = 8. A candidate who ignores the coefficient 5 and just copies the value of x would write y = 3. A candidate who multiplies correctly but treats x as −3 by mistake would get y = 5 × (−3) = −15.
- (a) (−6, −3) — Reflecting in the y-axis changes the sign of the x-coordinate and keeps the y-coordinate the same: (−6, −3). (6, 3) comes from reflecting in the x-axis instead, which changes the sign of the y-coordinate. (−6, 3) comes from reflecting in both axes. (6, −3) comes from not applying the reflection at all.
- (c) (6n + 4)/2 — Six full boxes hold 6 lots of n pencils, which is 6n, and the 4 loose pencils are added on, so the shop has 6n + 4 pencils altogether. Sharing them equally between 2 classes divides that whole total by 2, and brackets are what show that the division applies to all of it: (6n + 4)/2. Without the brackets, 6n + 4/2 halves only the loose pencils; 6(n + 4)/2 adds the loose pencils to every box before the division; 2(6n + 4) doubles the total instead of halving it.
- (a) 12 km/h — Method: convert 15 minutes to hours: 15 ÷ 60 = 0.25 h. Speed = distance ÷ time = 3 ÷ 0.25 = 12 km/h. Distractor origins: 9 km/h is the speed for the second section (3 km in 20 minutes) instead of the first; 8 km/h is the average speed for the whole journey (6 km in 45 minutes) instead of just the first section; 0.2 km/h divides 3 km by 15 without converting the minutes into hours.
- (d) 4n + 2 — Method: find the common difference, then find the constant by adjusting the first term. Working: 10 − 6 = 4, 14 − 10 = 4, so the common difference is 4 and the coefficient of n is 4. The constant is the first term minus the common difference: 6 − 4 = 2. Answer: the nth term is 4n + 2. 4n + 6 comes from using the first term, 6, as the constant without subtracting the common difference. 4n − 2 comes from working out the constant the wrong way round, as the common difference minus the first term (4 − 6 = −2) instead of the first term minus the common difference. 6n + 4 comes from swapping the common difference and the first term.
Build your own mix at the worksheet builder.