Printable · GCSE Foundation · ages 14-16
Geometry and measures worksheet — GCSE Foundation
Fifteen questions across the geometry and measures statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Geometry and measures worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A ship's radar shows a lighthouse at the point (12, −4) on a grid measured in nautical miles. The ship is at (2, 5). The ship sails along the vector that takes it directly to the lighthouse, then sails along that same vector again. Work out the ship's final position.
- 2.A trapezium has parallel sides of 5.6 cm and 8.4 cm, and a perpendicular height of 4 cm. Work out the area of the trapezium.
- 3.A cake recipe takes 135 minutes from start to finish. Write this time as hours and minutes.
- 4.A flagpole is 12 m tall. Freya stands 9 m from the base of the flagpole on level ground. Work out the angle of elevation of the top of the flagpole from where Freya stands. Give your answer correct to 1 decimal place.
- 5.A window is made from a rectangle with a semicircle on top. The rectangle is 40 cm wide and 60 cm tall. The semicircle has the same width as the rectangle. Work out the total area of the window. Use π = 3.14. Give your answer to the nearest whole number.
- 6.A sprinkler waters a sector-shaped patch of a garden with radius 8 m and angle 90°. Work out the perimeter of the watered sector, to 1 decimal place. (Use π = 3.14.)
- 7.A warehouse stores identical cube-shaped crates. Its plan view is a 2 by 4 rectangle of crate positions, and every position is filled to a height of 3 crates, except one corner position, which has only 2 crates stacked on it because a delivery was incomplete. How many crates are there in total?
- 8.A ship sails 12 km on a bearing of 070° from a harbour to a buoy. It then sails a further 9 km, still on a bearing of 070°, from the buoy to a lighthouse. How far is the lighthouse from the harbour, in kilometres?
- 9.A scale drawing uses a scale of 1 : 60. A path on the drawing is measured as 9.8 cm long. What is the real length of the path, in metres, to 1 decimal place?
- 10.A circular pizza base has a radius of 12 cm. Work out the area of the pizza base. Use π = 3.14.
- 11.In triangle ABC, angle ABC = 90° and angle BAC = 30°. The hypotenuse AC = 12 cm. Work out the exact length of AB.
- 12.A goat is tied by a rope 7 m long to a post at a corner of a rectangular field, where two fences meet at a right angle. The goat can reach anywhere inside the field that the rope allows. Using π = 3.14, work out the area the goat can graze, to the nearest square metre.
- 13.The curved part of a circle's circumference, between two points on the circle, has its own name. Write down this name.
- 14.A garden flower bed is in the shape of a trapezium. Its two parallel edges are 3.5 m and 6.5 m long, and the perpendicular distance between them is 4 m. Bedding plants cost £2.50 per square metre to cover the bed. Work out the total cost of the bedding plants.
- 15.A bus journey takes 2.5 hours. Work out how many minutes this is.
Answer key
- (b) (22, −13) — The vector from the ship to the lighthouse is (12, −4) − (2, 5) = (10, −9). Sailing along this vector twice from the start gives (2, 5) + 2 × (10, −9) = (2 + 20, 5 − 18) = (22, −13). '(12, −4)' stops after the ship reaches the lighthouse and ignores the second identical leg. '(−18, 23)' comes from finding the vector the wrong way round, as (2, 5) − (12, −4) = (−10, 9), and then doubling that. '(2, 5)' comes from adding the vector and then subtracting it again, wrongly cancelling the two legs instead of adding them.
- (b) 28 cm² — Area of a trapezium = (sum of parallel sides) ÷ 2 × height. Sum of parallel sides = 5.6 + 8.4 = 14 cm. Half of that is 14 ÷ 2 = 7 cm. Area = 7 × 4 = 28 cm². A pupil who forgets to halve gets 14 × 4 = 56 cm². A pupil who uses only the longer parallel side, as if this were a rectangle, gets 8.4 × 4 = 33.6 cm². A pupil who subtracts the parallel sides instead of adding them gets (8.4 − 5.6) ÷ 2 × 4 = 1.4 × 4 = 5.6 cm². The correct area is 28 cm².
- (c) 2 hours 15 minutes — Divide the total minutes by 60: 135 ÷ 60 = 2 remainder 15, so that is 2 hours 15 minutes. Treating 100 minutes as one hour, a metric-style mistake, gives 135 − 100 = 35, so 1 hour 35 minutes. Subtracting 60 twice to reach the 15 minutes left over, but losing count and recording only one of the two hours removed, gives 1 hour 15 minutes. Writing 135 ÷ 60 = 2.25 and then reading the '25' as minutes, instead of converting the 0.25 of an hour into 15 minutes, gives 2 hours 25 minutes.
- (b) 53.1° — The angle of elevation is opposite the height of the flagpole, 12 m, and adjacent to the distance from its base, 9 m, so tan θ = 12/9 = 1.333..., giving θ = tan⁻¹(1.333...) = 53.13...° ≈ 53.1°. "36.9°" finds the OTHER acute angle of the triangle, 90° − 53.1°, the angle at the top of the flagpole rather than the angle of elevation at Freya's position. "48.6°" comes from wrongly treating 9/12 as a sine ratio and finding sin⁻¹(0.75) = 48.6°, when neither side here is the hypotenuse. "41.4°" comes from wrongly treating 9/12 as a cosine ratio and finding cos⁻¹(0.75) = 41.4°, again without a hypotenuse in the ratio at all.
- (c) 3028 cm² — Split the window into a rectangle and a semicircle. Rectangle area = 40 × 60 = 2400 cm². The semicircle has radius 40 ÷ 2 = 20 cm, so its area = 0.5 × 3.14 × 20² = 628 cm². Total area = 2400 + 628 = 3028 cm². A student who uses a full circle instead of a semicircle on top of the rectangle gets 3.14 × 20² = 1256 cm² for the circle, plus 2400 cm² for the rectangle, totalling 3656 cm². A student who uses the rectangle's full width (40 cm) as the radius instead of halving it gets 0.5 × 3.14 × 40² = 2512 cm² for the semicircle, plus 2400 cm² for the rectangle, totalling 4912 cm².
- (a) 28.6 m — The perimeter of a sector is the two straight radii plus the curved arc. This sector's 90° angle is one quarter of a full turn, so its arc length is one quarter of the full circle's circumference. The full circumference is 2 × 3.14 × 8 = 50.24 m, and one quarter of that is 50.24 ÷ 4 = 12.56 m. Add the two 8 m radii: 12.56 + 8 + 8 = 28.56 m, which rounds to 28.6 m. Choosing 12.6 m gives the arc length alone (rounded), forgetting the two straight edges of the sector. Choosing 20.6 m adds only one radius to the arc length instead of two, missing one of the two straight sides. Choosing 41.1 m comes from using the diameter, 16 m, as if it were the radius when working out the arc length (2 × 3.14 × 16 = 100.48, one quarter of which is 25.12), then adding the two correct 8 m radii (25.12 + 8 + 8 = 41.12).
- (b) 23 — If every position were filled to the full height of 3, the total would be 2 × 4 × 3 = 24 crates. One corner position has only 2 crates instead of 3, one crate short of full height there, so the actual total is 24 − 1 = 23. "24" comes from using the full height everywhere and forgetting the one incomplete corner. "22" comes from removing 2 crates for the incomplete corner instead of the 1 that is actually missing (3 − 2 = 1, not 2). "21" comes from removing all 3 crates at that corner, as though the position were completely empty rather than 2 crates short.
- (b) 21 — Both legs of the journey are on the same bearing, 070°, so the ship travels in one straight line the whole way and the distances simply add: 12 + 9 = 21 km. A candidate who subtracts instead of adding gets 12 − 9 = 3 km. A candidate who multiplies the two distances gets 12 × 9 = 108. A candidate who assumes the ship changed direction and treats the two legs as the sides of a right-angled triangle works out √(12² + 9²) = √225 = 15 km — but the bearing does not change, so there is no triangle and no hypotenuse to find. Because the ship stays on one straight line, the total distance is 21 km.
- (a) 5.9 — The real length is 9.8 × 60 = 588 cm. Converting to metres, by dividing by 100, gives 5.88 m, which rounds to 5.9 m to 1 decimal place. A candidate who rounds 5.88 down instead of up gets 5.8 m. A candidate who forgets to convert from centimetres to metres gets 58.8. A candidate who divides by 60 instead of multiplying gets 0.16, to 2 decimal places. The real length, to 1 decimal place, is 5.9 m.
- (d) 452.16 cm² — Area = πr². Substitute r = 12: area = 3.14 × 12² = 3.14 × 144 = 452.16 cm².
- (d) 6√3 cm — Method: AB lies alongside the 30° angle at A and AC is the hypotenuse, so the ratio needed is cosine: cos 30° = AB ÷ AC. Working: the exact value of cos 30° is √3/2, so AB = 12 × √3 ÷ 2, and half of 12 is 6. Answer: AB = 6√3 cm, which is about 10.4 cm. Using sine by mistake gives 12 × 1/2 = 6 cm, which is the length of BC rather than AB. Using tan 30° = 1/√3 gives 12 ÷ √3, which is 4√3 cm. Remembering cos 30° as √3 rather than as √3 halved gives 12√3 cm, longer than the hypotenuse and so impossible.
- (d) 38 m² — The two fences meet at a right angle, so the rope sweeps a quarter of a circle: 90 ÷ 360 = 1/4. Grazing area = (90 ÷ 360) × 3.14 × 7² = 0.25 × 153.86 = 38.465 m², which rounds to 38 m². (5 m² comes from forgetting to square the rope length; 154 m² comes from finding the area of a full circle and forgetting the angle fraction; 11 m² comes from using the arc length formula instead of the sector area formula.)
- (a) arc — A curved part of a circle's circumference, between two points, is called an arc. A chord is the straight line joining those two points, not the curved part. A segment is the region enclosed between a chord and an arc, and a sector is the region enclosed between two radii and an arc — both segment and sector are regions, not curved lengths.
- (d) £50 — Area = 1/2 × (3.5 + 6.5) × 4 = 1/2 × 10 × 4 = 20 m². Cost = 20 × £2.50 = £50. (£100 comes from forgetting to halve the trapezium area, giving 40 m² instead of 20 m²; £65 comes from using only the longer parallel side, 6.5 × 4 = 26 m², instead of the trapezium formula; £35 comes from adding all three given lengths, 3.5 + 6.5 + 4, and treating that total as the area in square metres.)
- (c) 150 minutes — There are 60 minutes in an hour, so 2.5 hours is 2.5 × 60 = 150 minutes. Multiplying by 100 instead of 60, as if hours worked like a decimal metric unit, gives 250 minutes. Converting only the whole 2 hours and forgetting the extra 0.5 hours gives 120 minutes. Treating the 0.5 as 50 minutes, out of 100, instead of 30 minutes, out of 60, gives 170 minutes.
Build your own mix at the worksheet builder.