- (a) 17 cm — Convert the real distance to centimetres first: 3.4 km = 340 000 cm. Then divide by the scale factor, 20 000, since the map is 20 000 times smaller than real life: 340 000 ÷ 20 000 = 17, so the map distance is 17 cm. Choosing 1700 cm divides by 200 instead of 20 000, losing two zeros from the scale factor (340 000 ÷ 200 = 1700). Choosing 170 cm divides by 2 000 instead of 20 000, losing one zero from the scale factor (340 000 ÷ 2 000 = 170). Choosing 0.17 cm divides by 2 000 000 instead of 20 000, adding two extra zeros to the scale factor (340 000 ÷ 2 000 000 = 0.17).
- (d) (−2, 6) — Method: add the top numbers of both vectors to the starting x-coordinate, and the bottom numbers of both vectors to the starting y-coordinate. Working: x-coordinate 2 + 3 + (−7) = −2; y-coordinate −1 + 5 + 2 = 6. Answer: (−2, 6). A candidate who only applies vector u and forgets v gets (5, 4). A candidate who only applies vector v and forgets u gets (−5, 1). A candidate who works out the combined vector u + v but forgets to add it to the starting point gets (−4, 7).
- (c) 100.5 m — The curved part of a semicircular bend is half of a full circle's circumference. The full circumference would be 2 × 3.14 × 32 = 200.96 m, and half of that is 200.96 ÷ 2 = 100.48 m, which rounds to 100.5 m. Choosing 201.0 m uses the FULL circumference, forgetting to halve it for a semicircle. Choosing 50.2 m halves the radius as well as taking a semicircle, using 3.14 × 16 = 50.24 m instead of the correct radius of 32 m. Choosing 64.0 m uses the diameter, 2 × 32 = 64, as if it were the curved length, ignoring π and the semicircle shape entirely.
- (a) Yes - SSS, the three side lengths all match — Bracket P's sides (12 cm, 16 cm, 20 cm) can each be matched to one of Bracket Q's sides (16 cm, 20 cm, 12 cm) — the same three lengths, just listed differently — so the brackets are congruent by SSS. SAS is wrong here because no angle is stated for either bracket, only three sides. The order the sides are listed in does not matter for SSS — only whether the SET of three lengths matches, and it does, so 'listed in a different order' is not a reason to say no. Nothing extra is needed: SSS proves congruence from side lengths alone, without any angles, so it can be determined.
- (c) 9.9 cm — Method: the 7 cm side is opposite the 45° angle and the hypotenuse is wanted, so use sin θ = opposite ÷ hypotenuse and rearrange it for the hypotenuse. Working: sin 45° = 7 ÷ h, so h = 7 ÷ sin 45° = 9.899…, which is 9.9 to 1 decimal place. Answer: 9.9 cm. The distractors: 5.0 cm comes from multiplying by sin 45° instead of dividing by it; 14.0 cm comes from doubling the 7 cm side, which is the rule for a side opposite 30° and not one opposite 45°; 7.0 cm comes from reading the two equal sides of a 45° right-angled triangle as including the hypotenuse, when the equal pair is the two shorter sides.
- (d) £100.48 — Area of the rug = (angle ÷ 360) × π × r² = (180 ÷ 360) × 3.14 × 16 = 0.5 × 50.24 = 25.12 m². Cost = 25.12 × £4 = £100.48. (£200.96 comes from finding the area of a full circle, 3.14 × 16 = 50.24 m², and forgetting the angle fraction before costing it; £25.12 comes from forgetting to square the radius, using 0.5 × 3.14 × 4 = 6.28 m², and then costing that; £50.24 comes from using the arc length formula, 0.5 × 2 × 3.14 × 4 = 12.56, in place of the area, and costing that.)
- (b) £157 — Method: round the hours worked up to the next whole hour, multiply by the hourly rate, then add the call-out fee. Working: 3 hours 30 minutes rounds up to 4 hours; 28 × 4 = 112; 112 + 45 = 157. Answer: £157. A candidate who uses the unrounded time of 3.5 hours, working out 28 × 3.5 = 98 and adding 45, gets £143. A candidate who forgets the call-out fee, giving only 28 × 4, gets £112. A candidate who rounds down to 3 hours instead of up, working out 28 × 3 = 84 and adding 45, gets £129.
- (c) RHS — Both triangles are right-angled, and have equal hypotenuses (13 cm) and one equal corresponding side (5 cm), so they are congruent by the RHS (right angle, hypotenuse, side) condition — the three facts given are exactly a right angle, a hypotenuse and one other side. The distractor SAS would apply if two sides and the angle between those two sides were matched, but the right angle here lies between the 5 cm side and the third side, not between the 5 cm side and the hypotenuse. The distractor SSS needs all three pairs of sides matched, and only two sides of each triangle are given — the third side would first have to be calculated by Pythagoras, so SSS is not the condition the given facts supply. The distractor AAS would need two angles and a non-included side matched, but only one angle in each triangle is given.
- (d) 2π cm — Arc length is the fraction θ/360 of the full circumference, 2πr. Substitute θ = 60 and r = 6: 60 out of 360 is one sixth, and the full circumference is 2π × 6 = 12π. One sixth of 12π is 2π, so the arc length is 2π cm. Choosing 12π cm uses the full circumference without scaling it down by the fraction θ/360 first. Choosing 6π cm applies the SECTOR AREA formula, (θ/360) × πr², instead of the arc length formula — that calculation actually gives 6π, which is the area in cm², not a length. Choosing π cm uses πr instead of 2πr, missing the factor of 2 in the circumference formula.
- (d) 15° — Sector area = (angle ÷ 360) × π × r², so 4.71 = (angle ÷ 360) × 3.14 × 36 = (angle ÷ 360) × 113.04. Dividing gives angle ÷ 360 = 4.71 ÷ 113.04 = 1/24, so angle = 360 ÷ 24 = 15°. (90° comes from forgetting to square the radius, using (angle ÷ 360) × 3.14 × 6 = 18.84 in place of 113.04; 3.75° comes from using the diameter, 12 cm, in place of the radius, giving (angle ÷ 360) × 3.14 × 144 = 452.16; 45° comes from using the arc length formula, (angle ÷ 360) × 2 × 3.14 × 6 = 37.68, instead of the sector area formula.)
- (a) 75° — The three angles in the triangle formed by the two supports and the ground add up to 180°. Two of the angles are 34° and 71°, so the third angle is 180 − 34 − 71 = 75, which is 75°. 105° comes from adding the two given angles together instead of subtracting them from 180° (34 + 71 = 105). 146° comes from computing 180 − 34 = 146 and forgetting to also subtract 71°. 37° comes from subtracting the two given angles from each other instead of using the triangle's angle sum (71 − 34 = 37).
- (a) 32 m — The scale factor from the larger pond to the smaller pond is 4 ÷ 11, so the smaller perimeter is 88 × 4 ÷ 11 = 32 m. The distractor 242 m comes from using the ratio the wrong way round, 88 × 11 ÷ 4 = 242. The distractor 84 m comes from subtracting the smaller ratio number, 88 − 4 = 84, instead of scaling. The distractor 121 m comes from multiplying 11 × 11 = 121, ignoring the given perimeter altogether.
- (a) 62.8 cm — The ribbon goes once around the circular cross-section, so its length equals the circumference: 2πr = 2 × 3.14 × 10 = 62.8 cm.
- (a) 250° — The back bearing (the bearing of A from B) differs from the bearing of B from A by exactly 180°. Because the given bearing, 070°, is less than 180°, add 180°: 070 + 180 = 250°, so the bearing of A from B is 250°. Choosing 180° assumes the back bearing is always exactly 180°, ignoring the original bearing altogether. Choosing 110° comes from subtracting 180° from 070° and dropping the negative sign (070 − 180 = −110) instead of adding 180°. Choosing 160° comes from adding only 90° instead of 180° (070 + 90 = 160).
- (b) y-axis — A point lies on the y-axis when its x-coordinate is 0; here the x-coordinate of (0, −5) is 0, so it lies on the y-axis. "x-axis" would need the y-coordinate to be 0 instead, which is not the case here. "the origin" is the single point (0, 0), not a whole axis, and this point is not (0, 0). "both axes" would only be true for the origin itself, where both coordinates are 0.