Printable · GCSE Foundation · ages 14-16
Geometry and measures worksheet — GCSE Foundation
Fifteen questions across the geometry and measures statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Geometry and measures worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 14.7 cm — The scale factor from the smaller tile to the larger tile is 7 ÷ 4 = 1.75, so the larger side is 8.4 × 1.75 = 14.7 cm. '4.8 cm' comes from scaling by 4 ÷ 7 instead, using the ratio the wrong way round. '11.4 cm' comes from adding the difference between the ratio numbers, 7 − 4 = 3, onto 8.4, instead of scaling. '58.8 cm' comes from multiplying by 7 on its own, using a ratio number as the scale factor instead of working out 7 ÷ 4 = 1.75 first.
- (a) 143° — Angles on a straight line add up to 180°. Set up 37° + x = 180°. Subtract: x = 180° − 37° = 143°. 53° comes from using 90° as the total, as if the two angles made a right angle, instead of the 180° of a straight line.
- (b) 9π cm² — Sector area is the fraction θ/360 of the full circle's area, πr². Substitute θ = 40 and r = 9: 40 out of 360 is one ninth, and the full circle's area is π × 9² = 81π. One ninth of 81π is 9π, so the sector area is 9π cm². Choosing 2π cm² is this sector's ARC LENGTH, not its area — a different formula and a different quantity. Choosing 81π cm² is the area of the WHOLE circle, forgetting to scale down by the sector's angle. Choosing 18π cm² is the CIRCUMFERENCE of the whole circle, 2π × 9, mixed up with an area.
- (b) 8.5 m — First apply the scale to convert the plan length to a real length in centimetres: 3.4 × 250 = 850 cm. Then convert centimetres to metres by dividing by 100: 850 ÷ 100 = 8.5, so the wall is 8.5 m long. Choosing 850 m applies the scale correctly but forgets to convert the answer from centimetres into metres. Choosing 0.85 m divides by 1000 instead of 100, confusing the centimetre-to-metre conversion with a metre-to-kilometre one. Choosing 3.4 m ignores the scale factor completely and just restates the plan length as if it were already the real length.
- (c) 155° — Turning clockwise adds to the bearing. Starting on a bearing of 065° and turning clockwise through 90° gives 065° + 90° = 155°. A candidate who instead subtracts, working out 90° − 65° = 25°, has performed the wrong operation, giving 025°. A candidate who turns anticlockwise instead of clockwise works out 065° − 90°, which gives a negative number, and adding 360° to fix this gives 335° — the bearing for turning the other way. A candidate who thinks turning does not change the bearing at all keeps the answer as 065°. The new bearing, turning clockwise, is 155°.
- (a) 8.1 m — Multiply the length on the plan by the scale factor: 4.5 × 1.8 = 8.1, so the real length is 8.1 m. Choosing 6.3 m adds the two numbers instead of multiplying them (4.5 + 1.8 = 6.3). Choosing 2.5 m divides the plan length by the scale factor the wrong way round (4.5 ÷ 1.8 = 2.5) instead of multiplying. Choosing 9.0 m rounds the scale factor up to 2 before multiplying (4.5 × 2 = 9.0), losing the accuracy the 1.8 was giving.
- (a) 118° — When two straight lines cross, the angles that are vertically opposite each other are always equal. So the angle vertically opposite 118° is also 118°. A candidate who instead finds the angle next to it on the straight line, using 180° − 118° = 62°, has found the adjacent angle, not the vertically opposite one. A candidate who answers 180° has confused the rule with angles on a straight line. A candidate who doubles the angle, giving 236°, has applied no valid angle rule at all. The vertically opposite angle is 118°.
- (c) 150 minutes — There are 60 minutes in an hour, so 2.5 hours is 2.5 × 60 = 150 minutes. Multiplying by 100 instead of 60, as if hours worked like a decimal metric unit, gives 250 minutes. Converting only the whole 2 hours and forgetting the extra 0.5 hours gives 120 minutes. Treating the 0.5 as 50 minutes, out of 100, instead of 30 minutes, out of 60, gives 170 minutes.
- (b) 21 — Both legs of the journey are on the same bearing, 070°, so the ship travels in one straight line the whole way and the distances simply add: 12 + 9 = 21 km. A candidate who subtracts instead of adding gets 12 − 9 = 3 km. A candidate who multiplies the two distances gets 12 × 9 = 108. A candidate who assumes the ship changed direction and treats the two legs as the sides of a right-angled triangle works out √(12² + 9²) = √225 = 15 km — but the bearing does not change, so there is no triangle and no hypotenuse to find. Because the ship stays on one straight line, the total distance is 21 km.
- (c) ASA — Method: check which condition matches two angles and the side between them, since that is all the sailmaker has measured. Working: the 10 m side lies between the 50° and 75° angles in both panels, so this is two Angles and the included Side, ASA. Options: SAS would need two sides and the angle between them, but only one side has been measured here; SSS would need three sides, but only one is known; RHS needs a right angle and a hypotenuse, and neither panel has a stated right angle. Answer: ASA.
- (d) Yes, because 45 ÷ 360 = 1/8, and this fraction applies to any radius. — Priti is correct: 45 ÷ 360 = 1/8, and because sector area = (angle ÷ 360) × full circle area, this fraction depends only on the angle, not on the radius, so it holds for every circle. (The statement giving 45 ÷ 360 = 1/6 comes from an arithmetic slip when simplifying the fraction; the statement that the fraction depends on the radius is wrong because the radius cancels out of the angle fraction in the sector-area formula; the statement adding that it only works for this particular radius is wrong because the 1/8 fraction is true for every radius, not a special case.)
- (d) (−2, 6) — Method: add the top numbers of both vectors to the starting x-coordinate, and the bottom numbers of both vectors to the starting y-coordinate. Working: x-coordinate 2 + 3 + (−7) = −2; y-coordinate −1 + 5 + 2 = 6. Answer: (−2, 6). A candidate who only applies vector u and forgets v gets (5, 4). A candidate who only applies vector v and forgets u gets (−5, 1). A candidate who works out the combined vector u + v but forgets to add it to the starting point gets (−4, 7).
- (a) 8π cm — Circumference = 2πr. Substitute r = 4: circumference = 2 × π × 4 = 8π cm. Using r in place of 2r (halving the formula) gives 4π cm. Using the area formula πr² in place of the circumference formula gives π × 4² = 16π cm. Multiplying 2 × 4 without including π at all gives 8 cm.
- (c) 11.0 cm — Arc length = (angle ÷ 360) × 2 × π × r = (90 ÷ 360) × 2 × 3.14 × 7 = 0.25 × 43.96 = 10.99 cm, which rounds to 11.0 cm. (44.0 cm comes from finding the full circumference, 2 × 3.14 × 7 = 43.96 cm, and forgetting the angle fraction; 5.5 cm comes from leaving out the factor of 2, using π × r instead of 2 × π × r, giving 0.25 × 3.14 × 7 = 5.495 cm; 22.0 cm comes from using the diameter, 14 cm, in place of the radius, giving 0.25 × 2 × 3.14 × 14 = 21.98 cm.)
- (b) Wrong: 1 litre = 1000 ml, so 3.2 l = 3200 ml. — 1 litre = 1000 ml, so 3.2 litres = 3.2 × 1000 = 3200 ml — Sam is wrong because he multiplied by 100 instead of 1000. Saying Sam is correct accepts the wrong multiplier. Saying Sam is wrong only because 3.2 should be rounded first misses the real error, which is the multiplier, not the starting number. Saying '1 litre is 100 ml' misstates the basic fact and blames the wrong part of Sam's working.
Build your own mix at the worksheet builder.