Printable · GCSE Foundation · ages 14-16
Standard and compound units worksheet — GCSE Foundation
Fifteen questions on "standard and compound units" — DfE statement N13. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Calculator
Answer key: Standard and compound units worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 28.8 km/h — A compound unit is converted one part at a time. There are 3600 seconds in an hour, so in one hour the cyclist travels 8 × 3600 = 28 800 metres. There are 1000 metres in a kilometre, so 28 800 m = 28 800 ÷ 1000 = 28.8 km/h. 28 800 km/h leaves the distance in metres, 0.48 km/h converts the seconds to minutes rather than to hours, and 2.22 km/h divides by 3.6 instead of multiplying.
- (c) £4.05 — The total cost is 7 × 85p = £5.95. Josh's change is £10.00 − £5.95 = £4.05. Taking off the pounds and then only the 5p digit, £10.00 − £5.00 = £5.00 followed by £5.00 − £0.05, ignoring the 90p altogether, gives £4.95. Rounding the cost up to £6.00 and never accounting for the extra 5p at all gives £4.00. Multiplying 7 × 85 incorrectly as 605 (a slip in 7 × 5) gives a total cost of £6.05, and correctly subtracting that from £10.00 gives £3.95.
- (a) £4.80 — The total cost of the melons is 8 × £1.35 = £10.80. Profit is the selling total minus the cost, so £15.60 − £10.80 = £4.80. Subtracting the price of just one melon from the selling total instead of the total cost of all eight, £15.60 − £1.35, gives £14.25. Miscalculating the cost of the melons as 8 × £1.30 = £10.40, dropping the 5p from each price, gives a profit of £15.60 − £10.40 = £5.20. Adding the selling total and the cost together instead of subtracting them, £15.60 + £10.80, gives £26.40.
- (b) 78 hours — From 10:00 on Monday to 10:00 on Thursday is exactly 3 complete days, which is 3 × 24 = 72 hours. From 10:00 to 16:00 on the Thursday is a further 6 hours, giving a total of 72 + 6 = 78 hours. Counting Monday to Thursday as 4 full calendar days instead of 3 complete 24-hour periods gives 4 × 24 = 96 hours. Undercounting the number of complete days as 2 instead of 3 gives 2 × 24 + 6 = 54 hours. Subtracting the extra 6 hours instead of adding them to the 3 complete days gives 72 − 6 = 66 hours.
- (a) 11:20 — Method: find the flight time using time = distance ÷ speed, then add this to the departure time. Working: 2340 ÷ 780 = 3 hours; 08:20 + 3 hours = 11:20. Answer: 11:20. 08:40 comes from dividing speed by distance instead of distance by speed, giving a flight time of 1/3 hour (20 minutes) rather than 3 hours. 11:00 comes from adding the 3-hour flight time to the hour of the departure time only, 8 + 3 = 11, and losing the 20 minutes. 03:00 comes from finding the flight time correctly but giving it as a clock time on its own, forgetting to add it to the departure time.
- (c) 16:25 — Add the whole hour first: 14:35 plus 1 hour is 15:35. Then add the 50 minutes. From 15:35, 25 minutes reaches 16:00 and the remaining 25 minutes gives 16:25. 15:85 adds 35 and 50 to get 85 minutes and never exchanges 60 of them for an hour, 16:05 treats 1 hour 50 minutes as 1.5 hours, and 12:45 subtracts the journey time instead of adding it.
- (d) £143 — From 09:15 to 12:45 is 3 hours 30 minutes, which is 3.5 hours. The charge for the time is 3.5 × £28 = £98, and the call-out fee is added on once: £98 + £45 = £143. £98 leaves out the call-out fee altogether, £129 charges for 3 hours instead of 3.5 hours, and £255.50 adds the fee to the hourly rate before multiplying, which charges the £45 for every hour.
- (a) 8 litres per minute — Method: write the time as a decimal number of minutes, then divide the volume by the time. Working: 30 seconds = 30/60 minute = 0.5 minute, so 2 minutes 30 seconds = 2.5 minutes. Rate = 20 ÷ 2.5 = 8 litres per minute. Answer: 8 litres per minute. (10 litres per minute comes from ignoring the extra 30 seconds and dividing by 2 minutes only. 8.7 litres per minute comes from misreading 2 minutes 30 seconds as 2.3 minutes instead of 2.5 minutes. 0.125 litres per minute comes from dividing the time by the volume instead of the volume by the time.)
- (b) 90 km/h — To convert metres per second to kilometres per hour, multiply by 3.6 (there are 3600 seconds in an hour and 1000 metres in a kilometre, and 3600 ÷ 1000 = 3.6): 25 × 3.6 = 90 km/h. Dividing by 3.6 instead of multiplying gives 25 ÷ 3.6 = 6.9 km/h (to 1 d.p.). Multiplying by 60 instead of 3.6, confusing the conversion from seconds to minutes with the conversion to hours, gives 25 × 60 = 1500 km/h. Multiplying by 3600 to convert seconds to hours but forgetting to convert metres to kilometres gives 25 × 3600 = 90000, which is a speed in metres per hour, not kilometres per hour.
- (c) 8 hours 35 minutes — From 21:35 to midnight is 2 hours 25 minutes, and from midnight to 06:10 is a further 6 hours 10 minutes, giving a total of 8 hours 35 minutes. Misreading the departure time as 22:35 instead of 21:35 loses an hour from the calculation and gives 7 hours 35 minutes. Misreading the departure time as 20:35 instead of 21:35 gains an hour and gives 9 hours 35 minutes. Subtracting the times as if both fell on the same day, without crossing midnight, gives 15 hours 25 minutes.
- (d) 1050 ml — Convert both amounts to millilitres: 1.8 litres = 1800 ml and 3/4 litre = 750 ml. Subtracting gives 1800 − 750 = 1050 ml. Confusing 3/4 with 75% and converting it as 75 ml instead of 750 ml gives 1800 − 75 = 1725 ml. Adding the amount poured out instead of subtracting it gives 1800 + 750 = 2550 ml. Misreading 1.8 litres as 0.8 litres, losing the whole litre, gives 800 − 750 = 50 ml.
- (b) £96.90 — Method: multiply the number of units by the cost per unit, then convert the result from pence to pounds. Working: 340 × 28.5p = 9690p; converting to pounds, 9690p ÷ 100 = £96.90. Answer: £96.90. £969.00 comes from misplacing the decimal point when converting pence to pounds, dividing by 10 instead of 100. £9.69 comes from misplacing the decimal point the other way, dividing by 1000 instead of 100. £102.00 comes from rounding the rate to 30p per unit before multiplying.
- (d) 60 mph — Average speed = distance ÷ time, with the time measured in hours. 45 minutes is 45/60 of an hour, which is 0.75 of an hour, so the journey takes 1.75 hours. Speed = 105 ÷ 1.75 = 60 mph. 52.5 mph rounds the time up to 2 hours, 72.4 mph writes 1 hour 45 minutes as 1.45 hours, and 183.75 mph multiplies the distance by the time instead of dividing.
- (c) 2000 mm — Put both lengths into the same unit first. There are 1000 mm in a metre, so the ribbon is 2.4 × 1000 = 2400 mm, and there are 10 mm in a centimetre, so the piece cut off is 40 × 10 = 400 mm. The length left is 2400 − 400 = 2000 mm. 2360 mm subtracts 40 mm instead of 400 mm, 200 mm works in centimetres and then labels the result as millimetres, and 2800 mm adds the piece that was cut off instead of subtracting it.
- (c) £8.20 — Method: find the total cost, then subtract from the amount paid. Working: 35 × £1.48 = £51.80. Amount paid = 3 × £20 = £60.00. Change = £60.00 − £51.80 = £8.20. Answer: £8.20. (£58.52 comes from forgetting to multiply the price by the 35 litres and subtracting only £1.48 from £60. £7.50 comes from rounding £1.48 up to £1.50 before multiplying, giving a total of £52.50 instead of £51.80. £9.20 comes from miscarrying in the pence column when subtracting £51.80 from £60.00.)
Build your own mix at the worksheet builder.