Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A seed company tests germination using results from three greenhouses. Greenhouse 1 plants 200 seeds and 172 germinate. Greenhouse 2 plants 150 seeds and 126 germinate. Greenhouse 3 plants 250 seeds and 212 germinate. Using the combined results from all three greenhouses, work out the best estimate of the number of seeds, out of a new batch of 4000 seeds, that would be expected to germinate.
- 2.A factory finds that the probability a randomly chosen light bulb is defective is 0.035. In a batch of 4,000 bulbs, work out how many bulbs you would expect to work correctly.
- 3.A survey of 90 people records which of two apps, X and Y, they use. 55 people use app X, 42 people use app Y, and 20 people use neither app. Work out the probability that a randomly chosen person uses both apps, giving your answer as a fraction in its simplest form.
- 4.A factory checked 400 items. A frequency tree splits them into 250 items made by machine A and 150 items made by machine B. On machine A's branch, 15 of the items were faulty. On machine B's branch, 5 of the items were faulty. One of the 400 items is picked at random. Work out the probability that it is faulty. Give your answer as a fraction in its simplest form.
- 5.A two-way table records how 180 students at a school travel: by bus or on foot, split by year group. There are 84 students in Year 11, of whom 38 travel by bus and the rest walk. The rest of the 180 students are in Year 10, and 42 of the Year 10 students travel by bus. Work out the probability that a randomly chosen Year 10 student walks to school. Give your answer as a fraction in its simplest form.
- 6.A garden centre tests 250 packets of seeds for germination, recording the results on a frequency tree. 68% of the 250 packets germinated successfully, and the rest did not. Work out how many packets germinated successfully.
- 7.Dice A is a fair six-sided dice. Dice B is biased so that P(6) = 0.3. Dice A is rolled 150 times and Dice B is rolled 150 times. Work out how many more sixes you would expect from Dice B than from Dice A.
- 8.On a Saturday, 2,000 customers go through the tills at a supermarket. The probability that a customer buys a reusable bag is 0.08. Work out how many customers you would expect to buy a reusable bag.
- 9.The probability that Leo wakes up before his alarm is 0.35. The probability that his younger sister wakes up before her alarm, independently of Leo, is 0.28. Work out the probability that neither of them wakes up before their alarm.
- 10.A bag is known to contain red, blue and green counters in equal numbers, so the theoretical probability of taking each colour is 1/3. In 90 trials with replacement, red was taken 38 times, blue was taken 26 times and green was taken 26 times. Which colour is over-represented compared with its theoretical probability?
- 11.A café offers 3 types of sandwich, cheese, ham and egg, and 4 types of drink, tea, coffee, juice and water. A customer chooses one sandwich and one drink at random. Work out the probability that the customer chooses egg and water.
- 12.At a fun run, each runner finishes, retires or is disqualified, and cannot do more than one of these. The probability that a runner finishes is 68.5% and the probability that a runner retires is 24.75%. Work out the probability, as a percentage, that a runner is disqualified.
- 13.An archer hits the bullseye with probability 0.24 on any one shot. She wants to know how many shots she must take to expect to hit the bullseye 12 times. Work out how many shots this is.
- 14.A survey of 160 employees at a company recorded whether they cycle to work, using a frequency tree. The first branch splits them into 90 who work full-time and 70 who work part-time. Of the full-time employees, 27 cycle to work. Of the part-time employees, 14 cycle to work. Work out the probability that an employee, chosen at random from the 160, cycles to work. Give your answer as a fraction in its simplest form.
- 15.A grower knows that the probability that one of their seeds germinates is 0.6. The grower wants to expect 300 of the seeds to germinate. Work out how many seeds the grower should plant.
Answer key
- (d) 3400 — Combining all three greenhouses gives 200 + 150 + 250 = 600 seeds planted in total, and 172 + 126 + 212 = 510 germinated, so the combined estimate of the germination probability is 510/600 = 0.85. Out of a new batch of 4000 seeds, the expected number to germinate is 4000 × 0.85 = 3400. Writing 3440 is wrong because it uses only Greenhouse 1's rate, 172/200 = 0.86, instead of the combined rate from all three: 4000 × 0.86 = 3440. Writing 3360 is wrong because it uses only Greenhouse 2's rate, 126/150 = 0.84: 4000 × 0.84 = 3360. Writing 510 is wrong because that is the total number that germinated in the ORIGINAL trial, not scaled up to the new batch of 4000 seeds at all. The best estimate is 3400 seeds.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (b) 3/10 — The number who use at least one app is 90 − 20 = 70. Since 55 + 42 double-counts the overlap, n(X ∩ Y) = 55 + 42 − 70 = 27, so P(both) = 27/90 = 3/10. Forgetting to subtract the 20 who use neither, and using the full 90 as the union, gives 55 + 42 − 90 = 7, so 7/90. Reporting the probability of using X or Y (or both), 70/90 = 7/9, answers a different question about the union, not the overlap. Reporting the probability of using neither app, 20/90 = 2/9, is the complement of the union, not the intersection.
- (d) 1/20 — Method: add the counts on the faulty end branches, divide by the total number of items in the experiment, then cancel. Working: the faulty items number 15 + 5 = 20, and 400 items were checked, so the probability is 20/400. Dividing the top and the bottom by 20 gives 1/20. Answer: the probability is 1/20. The distractors: 3/50 is 15/250 and comes from dividing machine A's faults by machine A's output, which is that machine's own fault rate rather than the probability for the whole batch; 1/30 is 5/150 and does the same on machine B's branch; 19/20 is 380/400 and gives the probability that the item picked is not faulty.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (c) 170 — 68% of the 250 packets germinated: 250 × 0.68 = 170. Using the complement, the 32% that did NOT germinate, gives 250 × 0.32 = 80. Shifting the decimal point, using 0.068 instead of 0.68, gives 250 × 0.068 = 17. Rounding 68% up to 70% before multiplying gives 250 × 0.70 = 175.
- (a) 20 — Dice A is fair, so its expected number of sixes is 150 × 1/6 = 25. Dice B has P(6) = 0.3, so its expected number of sixes is 150 × 0.3 = 45. The difference is 45 − 25 = 20. Adding the two expected values instead of subtracting them gives 25 + 45 = 70. Reporting Dice B's expected sixes on their own, without comparing to Dice A, gives 45. Using the fair probability 1/6 for Dice B as well as Dice A ignores the bias altogether, giving 150 × 1/6 = 25 for both dice and a difference of 0.
- (a) 160 — Expected number = probability × number of trials = 0.08 × 2,000 = 160. Moving the decimal point one place too far, using 0.008 instead of 0.08, gives 2,000 × 0.008 = 16. Working out the expected number of customers who do NOT buy a bag, using the complement 1 − 0.08 = 0.92, gives 2,000 × 0.92 = 1,840. Rounding 0.08 up to 0.1 before multiplying gives 2,000 × 0.1 = 200.
- (d) 0.468 — The probability that Leo does not wake up before his alarm is 1 − 0.35 = 0.65, and the probability that his sister does not is 1 − 0.28 = 0.72. Since the two events are independent, multiply the complements: 0.65 × 0.72 = 0.468. A candidate who answers 0.63 has added the two given probabilities, 0.35 + 0.28, instead of finding and multiplying the complements. A candidate who answers 0.098 has multiplied the two given probabilities directly, 0.35 × 0.28, without taking complements first. A candidate who answers 0.532 has correctly reached 0.468 but then subtracted it from 1 again by mistake.
- (c) Red — Theoretical probability is 1/3 ≈ 0.333 for each colour. Red's relative frequency is 38/90 ≈ 0.422, above 1/3, so red is over-represented. Blue's relative frequency is 26/90 ≈ 0.289, below 1/3, so blue is under-represented, not over. Green's relative frequency is also 26/90 ≈ 0.289, below 1/3 for the same reason. Since red's relative frequency clearly exceeds 1/3, it is not true that none of the colours are over-represented.
- (d) 1/12 — Method: list the full possibility space of sandwich-and-drink pairs, then divide the one matching pair by the size of the whole space. Working: there are 3 × 4 = 12 equally likely sandwich-and-drink pairs, and exactly one of them is egg and water. Answer: 1/12. Watch out: writing down 1/7 comes from adding the two counts, 3 + 4 = 7, instead of multiplying them to build the possibility space. Writing down 1/3 uses only the chance of choosing egg out of 3 sandwiches and ignores the drink altogether. And writing down 1/4 uses only the chance of choosing water out of 4 drinks and ignores the sandwich altogether.
- (a) 6.75% — Finishing, retiring and being disqualified are exhaustive, so the three percentages sum to 100%: 100% − 68.5% − 24.75% = 6.75%. Adding the two given percentages instead of subtracting them from 100% gives 68.5% + 24.75% = 93.25%, the combined probability of finishing or retiring, not of being disqualified. Subtracting only the retiring percentage from 100% and forgetting the finishing percentage gives 100% − 24.75% = 75.25%. Subtracting only the finishing percentage and forgetting the retiring percentage gives 100% − 68.5% = 31.50%.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
Build your own mix at the worksheet builder.