Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A seed company tests germination using results from three greenhouses. Greenhouse 1 plants 200 seeds and 172 germinate. Greenhouse 2 plants 150 seeds and 126 germinate. Greenhouse 3 plants 250 seeds and 212 germinate. Using the combined results from all three greenhouses, work out the best estimate of the number of seeds, out of a new batch of 4000 seeds, that would be expected to germinate.
- 2.A raffle sells 400 tickets at 50p each. There is one prize of £45. Aisha buys 8 tickets. Work out how much money Aisha should expect to lose from playing, giving your answer in pounds.
- 3.Priya spins a fair spinner with P(red) = 0.3, and separately flips a fair coin with P(heads) = 0.5. Using a tree diagram, work out the probability that she gets red AND heads.
- 4.On the probability scale from 0 (impossible) to 1 (certain), evens is exactly halfway. An event is 3/10 more likely than evens. Work out the probability of that event, giving your answer as a decimal.
- 5.A biased spinner is spun 40 times and lands on red 16 times. It is then spun a further 60 times and lands on red 21 times. Work out the best estimate of the probability that the spinner lands on red, using the results of all 100 spins together.
- 6.A bag contains 20 counters. 8 of the counters are red and 12 are blue. A counter is taken at random, its colour is recorded, and it is put back in the bag. This is done 150 times. Work out how many red counters you would expect to be recorded.
- 7.In a class experiment a fair six-sided dice is rolled 60 times and lands on a six 14 times. The whole school then rolls the same fair dice 3000 times. Work out the best estimate of the number of sixes the school should expect.
- 8.A quality inspector examines a sample of 60 items from a production line and finds that 8 are faulty. Using this sample's proportion, work out how many faulty items would be expected in a new batch of 750 items.
- 9.An ordinary six-sided dice, numbered 1 to 6, is rolled 30 times and lands on a 6 seven times. Ravi says the theoretical probability of rolling a 6 and the relative frequency of rolling a 6 in this trial are the same number. Is Ravi right?
- 10.A clinic recorded 300 booked appointments using a frequency tree. The first branch splits them into 210 adult appointments and the rest child appointments. Of the adult appointments, 189 were attended and the rest were missed. Of the child appointments, 81 were attended. Work out the probability that a booked appointment, chosen at random from the 300, was missed. Give your answer as a fraction in its simplest form.
- 11.A bag is known to contain red, blue and green counters in equal numbers, so the theoretical probability of taking each colour is 1/3. In 90 trials with replacement, red was taken 38 times, blue was taken 26 times and green was taken 26 times. Which colour is over-represented compared with its theoretical probability?
- 12.A factory checked 400 items. A frequency tree splits them into 250 items made by machine A and 150 items made by machine B. On machine A's branch, 15 of the items were faulty. On machine B's branch, 5 of the items were faulty. One of the 400 items is picked at random. Work out the probability that it is faulty. Give your answer as a fraction in its simplest form.
- 13.A weather station records whether it rains each day for 40 days: it rains on 9 of the days and does not rain on the rest. A local forecaster claims that the probability of rain on any day is 0.3. Work out the relative frequency of rain from the recorded data.
- 14.Two goalkeepers face penalty kicks. Elin saves 34% of the penalties she faces. Noah saves 11/32 of the penalties he faces. Which statement correctly compares them?
- 15.The probability that a plant grown from a seed packet germinates is 7/10. Work out the probability that it does not germinate.
Answer key
- (d) 3400 — Combining all three greenhouses gives 200 + 150 + 250 = 600 seeds planted in total, and 172 + 126 + 212 = 510 germinated, so the combined estimate of the germination probability is 510/600 = 0.85. Out of a new batch of 4000 seeds, the expected number to germinate is 4000 × 0.85 = 3400. Writing 3440 is wrong because it uses only Greenhouse 1's rate, 172/200 = 0.86, instead of the combined rate from all three: 4000 × 0.86 = 3440. Writing 3360 is wrong because it uses only Greenhouse 2's rate, 126/150 = 0.84: 4000 × 0.84 = 3360. Writing 510 is wrong because that is the total number that germinated in the ORIGINAL trial, not scaled up to the new batch of 4000 seeds at all. The best estimate is 3400 seeds.
- (c) £3.10 — Aisha's tickets cost 8 × 50p = £4.00. Her expected winnings are (8/400) × £45 = £0.90, since she holds 8 of the 400 tickets. Her expected loss is the cost minus the expected winnings: £4.00 − £0.90 = £3.10. Writing £4.00 is wrong because it is only the cost of her tickets, with no account taken of the expected winnings she might get back. Writing £0.90 is wrong because that is her expected WINNINGS, not her loss — the cost has not been subtracted. Writing £3.89 is wrong because it uses 1 ticket instead of her actual 8 tickets when working out the expected winnings: (1/400) × £45 = £0.1125, giving £4.00 − £0.11 = £3.89. Aisha should expect to lose £3.10.
- (c) 0.15 — Method: for two independent events, multiply along the branches of the tree to find the probability of both outcomes happening together. Working: P(red and heads) = P(red) × P(heads) = 0.3 × 0.5 = 0.15. Answer: 0.15. Watch out: adding the two probabilities, 0.3 + 0.5 = 0.8, does not give the probability of both — probabilities along one path of a tree are multiplied, not added. Writing down 0.5 ignores the spinner altogether and gives only the coin's probability. And writing down 0.65 is the probability of red OR heads, which is 0.3 + 0.5 − 0.15 = 0.65, a different question from the one asked here.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (a) 60 — Method: because the counter goes back each time, every draw is the same experiment, so the expected number of reds is the number of draws multiplied by P(red). Working: there are 8 red counters out of 20, so P(red) = 8 ÷ 20 = 0.4. Over 150 draws the expected number of reds is 150 × 0.4 = 60. Answer: about 60 red counters would be expected. The distractors: 90 uses P(blue) by mistake, 150 × 12 ÷ 20 = 90; 100 comes from writing the probability from the red to blue ratio of 8 to 12, giving 150 × 8 ÷ 12 = 100; 75 comes from treating red and blue as equally likely because there are two colours, which gives 150 ÷ 2 = 75.
- (b) 500 — Method: when a dice is known to be fair, the theoretical probability is the best thing to work from, and the more trials there are the closer the results tend to it. Working: for a fair dice the probability of a six is 1/6, so the expected number of sixes in 3000 rolls is 3000 × 1 ÷ 6 = 500. The class experiment gave a relative frequency of 14/60, but 60 trials is far too few to overturn a known theoretical value, and the school's 3000 rolls will tend towards 1/6 in any case. Answer: about 500 sixes. The distractors: 700 comes from using the class relative frequency instead of the theory, 3000 × 14 ÷ 60 = 700; 600 comes from splitting the difference between the two, since 1/6 is about 0.167 and 14/60 is about 0.233, whose mean is 0.2, and 3000 × 0.2 = 600; 2500 uses 5/6 instead of 1/6 and counts the rolls expected not to be a six.
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (c) No — 7/30 is the relative frequency; theory stays 1/6. — The theoretical probability of rolling a 6 on an ordinary dice is fixed at 1/6, worked out from the number of equally likely outcomes, and does not change however the dice is actually rolled. The relative frequency from this trial is 7/30, found from what happened in these particular 30 rolls. Since 7/30 and 1/6 are different numbers, the correct statement is 'No — 7/30 is the relative frequency; theory stays 1/6.' Assuming the two values must always match because they describe the same event gives 'Yes — relative frequency always equals theory.' Believing that an observed result redefines the theoretical probability gives 'Yes — the theoretical probability has now become 7/30.' Refusing to work out either value at all gives 'Neither can be found — 30 rolls is too few to tell', which ignores that both numbers CAN be calculated from the information given.
- (c) 1/10 — On the adult branch, 210 − 189 = 21 appointments were missed. There are 300 − 210 = 90 child appointments, and 90 − 81 = 9 of those were missed. In total, 21 + 9 = 30 appointments were missed, out of 300: 30/300 = 1/10. Writing 7/100 is wrong because 21/300 simplifies to 7/100, and 21 only counts the adult branch, leaving out the 9 missed child appointments. Writing 3/100 is wrong because 9/300 simplifies to 3/100, and 9 only counts the child branch, leaving out the 21 missed adult appointments. Writing 1/9 is wrong because it divides the 30 missed appointments by the 270 that were attended (300 − 30) instead of by the whole 300 booked. The probability is 1/10.
- (c) Red — Theoretical probability is 1/3 ≈ 0.333 for each colour. Red's relative frequency is 38/90 ≈ 0.422, above 1/3, so red is over-represented. Blue's relative frequency is 26/90 ≈ 0.289, below 1/3, so blue is under-represented, not over. Green's relative frequency is also 26/90 ≈ 0.289, below 1/3 for the same reason. Since red's relative frequency clearly exceeds 1/3, it is not true that none of the colours are over-represented.
- (d) 1/20 — Method: add the counts on the faulty end branches, divide by the total number of items in the experiment, then cancel. Working: the faulty items number 15 + 5 = 20, and 400 items were checked, so the probability is 20/400. Dividing the top and the bottom by 20 gives 1/20. Answer: the probability is 1/20. The distractors: 3/50 is 15/250 and comes from dividing machine A's faults by machine A's output, which is that machine's own fault rate rather than the probability for the whole batch; 1/30 is 5/150 and does the same on machine B's branch; 19/20 is 380/400 and gives the probability that the item picked is not faulty.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (c) Noah — 11/32 = 0.34375, above 34%. — Converting 11/32 to a decimal gives 11 ÷ 32 = 0.34375, which is greater than 34% (0.34), so Noah has the better save rate: 'Noah — 11/32 = 0.34375, above 34%.' Comparing the raw numbers 34 and 11 directly, without converting the fraction to the same form, gives 'Elin — 34 is bigger than 11.' Treating a larger denominator as meaning a bigger value, rather than smaller equal shares, gives 'Noah — 32 is a bigger denominator.' Rounding 34.375% to 34% to the nearest whole percent hides the difference and gives 'Equal — both round to 34% to the nearest percent.'
- (a) 3/10 — Germinating and not germinating are exhaustive, so their probabilities sum to 1: 1 − 7/10 = 3/10. Writing 7/10 again gives the probability that the plant DOES germinate, not its complement. Putting the difference 10 − 7 = 3 over the original numerator instead of the original denominator gives 3/7. Inverting the correct answer, swapping its numerator and denominator, gives 10/3, which is impossible as a probability since it is greater than 1.
Build your own mix at the worksheet builder.