Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 0.420 — Method: use the relative frequency worked out from the larger number of trials as the best estimate of the probability, since a bigger sample tends to sit closer to the true probability. Working: 84 out of 200 drops land open end up, so the relative frequency from the total is 84 ÷ 200 = 0.420. Answer: 0.420. Watch out: writing down 0.650 comes from 13 ÷ 20, using only the first, much smaller sample instead of the total. Writing down 0.535 comes from averaging 0.650 and 0.420, treating the 20-drop run and the 200-drop run as equally reliable instead of using the larger sample on its own. And writing down 0.580 comes from 1 − 0.420, working out the probability that the bottle top lands the other way up instead of open end up.
- (a) £150 — Each game, the expected payout is 0.1 × £20 = £2, so the fête's expected profit per game is the £3 charged minus the £2 expected payout, £1. Over 150 games, that is 150 × £1 = £150. Writing £300 is wrong because 150 × £2 = £300 is the total expected PAYOUT, not the profit — it has not been subtracted from the entry fees. Writing £450 is wrong because 150 × £3 = £450 is the total money taken in entry fees, without accounting for what is expected to be paid out in prizes. Writing £1 is wrong because that is only the expected profit for ONE game — it has not been scaled up to all 150 games. The fête's expected profit is £150.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (c) 30 — The numbers less than 4 are 1, 2 and 3, so the probability of that event is 3/6, and the expected count in 90 rolls is 90 × 3/6 = 45. The probability of rolling a 6 is 1/6, and the expected count is 90 × 1/6 = 15. The difference between the two expected counts is 45 − 15 = 30. A candidate who answers 45 has given the expected count for 'less than 4' only, forgetting to subtract the other expected count. A candidate who answers 15 has given the expected count for '6' only. A candidate who answers 36 has used a dice with 5 possible numbers instead of 6, giving 90 × 3/5 = 54 and 90 × 1/5 = 18, a difference of 36.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (b) 24/125 — On the fiction branch, 160 − 112 = 48 books were returned late. None of the non-fiction books were late, so the total number of late books is 48, out of 250 books altogether: 48/250 = 24/125. Writing 3/10 is wrong because it divides the 48 late fiction books by the fiction total (160) instead of the whole library total (250). Writing 56/125 is wrong because 112/250 simplifies to 56/125, and 112 is the number of fiction books returned ON TIME, not late. Writing 9/25 is wrong because 90/250 simplifies to 9/25, and 90 is simply the number of non-fiction books, which has nothing to do with late returns. The probability is 24/125.
- (d) 1/20 — Method: add the counts on the faulty end branches, divide by the total number of items in the experiment, then cancel. Working: the faulty items number 15 + 5 = 20, and 400 items were checked, so the probability is 20/400. Dividing the top and the bottom by 20 gives 1/20. Answer: the probability is 1/20. The distractors: 3/50 is 15/250 and comes from dividing machine A's faults by machine A's output, which is that machine's own fault rate rather than the probability for the whole batch; 1/30 is 5/150 and does the same on machine B's branch; 19/20 is 380/400 and gives the probability that the item picked is not faulty.
- (b) likely — On the probability scale, 'certain' is reserved for a probability of exactly 1, and 'evens' describes a probability of exactly 0.5. A probability of 0.9 is high but not equal to 1, so the correct word is 'likely'. Choosing 'certain' treats a probability close to 1 as if it were exactly 1, which it is not. Choosing 'evens' misjudges 0.9 as being close to the midpoint of the scale, when it is close to the 'certain' end instead. Choosing 'unlikely' reads the scale the wrong way round, as if a high probability meant a low chance of happening.
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
- (b) The relative frequency is settling near 0.5 — Method: turn each result into a relative frequency before comparing them, because it is the relative frequency, and not the difference between the two counts, that tends towards the theoretical probability. Working: after 10 flips the relative frequency of a head is 7 ÷ 10 = 0.7, which is a long way from 0.5. After 1000 flips it is 528 ÷ 1000 = 0.528, which is much closer to 0.5. Meanwhile the gap between the two counts has grown rather than shrunk: it was 7 − 3 = 4 after 10 flips and is 528 − 472 = 56 after 1000 flips. Answer: the relative frequency is settling near 0.5, which is what an unbiased experiment does as the sample grows. The distractors: saying the counts are levelling out is the usual form of this idea and the figures contradict it, since the gap went from 4 to 56; saying the coin is biased treats 28 extra heads in 1000 flips as proof, when 0.528 sits close to 0.5 and a fair coin gives results like this often; saying the next flip is more likely to be a tail is the gambler's fallacy, since each flip stays at 1/2 whatever came before.
- (b) 57/100 — Pooling both trials: total heads = 24 + 33 = 57, total flips = 40 + 60 = 100, so the combined relative frequency is 57/100, which is already in its simplest form since 57 and 100 share no common factor. Averaging the two separate relative frequencies instead, (24/40 + 33/60) ÷ 2 = (0.6 + 0.55) ÷ 2 = 0.575 = 23/40, treats the two trials as equally weighted even though Ben made more flips, which is not correct. Using only Leah's data gives 24/40 = 3/5. Using only Ben's data gives 33/60 = 11/20.
- (c) 0.5 — Method: count the favourable outcomes, write them over the total number of equally likely outcomes and then divide to turn the fraction into a decimal. Working: the odd scores are 1, 3 and 5, which is 3 of the 6 equally likely scores, so the probability is 3/6, and 3 ÷ 6 = 0.5. Answer: 0.5, the middle of the 0 to 1 probability scale. The distractors: 0.33 comes from listing only 3 and 5 as odd and working out 2 ÷ 6; 0.17 comes from giving the probability of one particular odd score, 1 ÷ 6; 0.3 comes from writing '3 out of 6' as 0.3, reading the 3 straight off as tenths instead of dividing.
Build your own mix at the worksheet builder.