Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
- (a) Game B, by £8 — Game A's expected total is 40 × 0.2 × £5 = £40. Game B's expected total is 40 × 0.1 × £12 = £48. Game B is higher, by £48 − £40 = £8. Writing 'Game A, by £8' is wrong because it has the right difference but the wrong game — Game A's total (£40) is actually LOWER than Game B's, not higher. Writing 'Game B, by £48' is wrong because £48 is Game B's whole expected total, not the DIFFERENCE between the two games. Writing 'Game A, by £40' is wrong in the same way, using Game A's whole total as if it were the margin, and naming the wrong game as the winner. Game B gives the higher expected total, by £8.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (a) 952 — 68% = 0.68. The relative frequency from the survey applies to the new group of 1400 shoppers, so the expected number is 0.68 × 1400 = 952. Working out 1 − 0.68 = 0.32 and applying that instead, 0.32 × 1400 = 448, finds the number who have NOT used a self-checkout, not the number who have. Applying 68% to the original sample size of 250 instead of the new total of 1400 gives 0.68 × 250 = 170. Applying the complement percentage to the original sample size, 0.32 × 250 = 80, compounds both mistakes.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (d) 12/25 — The group holds 40 of the 250 tickets, so for any one prize the probability the group wins it is 40/250 = 4/25. There are 3 prizes and the group has the same chance at each one, so the expected number won is 3 × 4/25 = 12/25. Writing 4/25 is wrong because it is the chance of winning just ONE prize, without multiplying by the 3 prizes available. Writing 4/75 is wrong because it divides by the 3 prizes instead of multiplying (4/25 ÷ 3 = 4/75), which would mean the group did worse the more prizes were on offer. Writing 64/15625 is wrong because it multiplies the single-prize probability by itself three times, (4/25)³, as though all three prizes had to be won together, instead of adding up the expected number across the three separate prizes. The expected number of prizes won by the group is 12/25.
- (c) 0.37 — Method: pool the two runs into one combined set of results, then find the relative frequency of red across all of the spins together. Working: total reds = 16 + 21 = 37. Total spins = 40 + 60 = 100. Relative frequency = 37 ÷ 100 = 0.37. Answer: 0.37. Watch out: writing down 0.40 uses only the first run, 16 ÷ 40, and throws away the extra evidence from the second 60 spins. Writing down 0.35 uses only the second run, 21 ÷ 60, and throws away the first run instead. And writing down 0.375 averages the two runs' separate rates, (0.40 + 0.35) ÷ 2, which treats a run of 40 spins and a run of 60 spins as equally weighted, when pooling the actual counts gives the larger run its fair share of influence.
- (c) 80 — Since 180 calls are 0.75 of all the technical support calls, the technical support total is 180 ÷ 0.75 = 240. The billing calls make up the rest of the 320 calls, so 320 − 240 = 80. Choosing 240 comes from stopping after finding the technical support total and forgetting the question asks for the billing calls, which are the rest. Choosing 185 comes from multiplying 180 × 0.75 = 135 instead of dividing, then working out 320 − 135 = 185. Choosing 140 comes from using 180 directly as the whole technical support total, ignoring the probability altogether, then working out 320 − 180 = 140.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (c) 0.15 — Method: for two independent events, multiply along the branches of the tree to find the probability of both outcomes happening together. Working: P(red and heads) = P(red) × P(heads) = 0.3 × 0.5 = 0.15. Answer: 0.15. Watch out: adding the two probabilities, 0.3 + 0.5 = 0.8, does not give the probability of both — probabilities along one path of a tree are multiplied, not added. Writing down 0.5 ignores the spinner altogether and gives only the coin's probability. And writing down 0.65 is the probability of red OR heads, which is 0.3 + 0.5 − 0.15 = 0.65, a different question from the one asked here.
- (a) 6.75% — Finishing, retiring and being disqualified are exhaustive, so the three percentages sum to 100%: 100% − 68.5% − 24.75% = 6.75%. Adding the two given percentages instead of subtracting them from 100% gives 68.5% + 24.75% = 93.25%, the combined probability of finishing or retiring, not of being disqualified. Subtracting only the retiring percentage from 100% and forgetting the finishing percentage gives 100% − 24.75% = 75.25%. Subtracting only the finishing percentage and forgetting the retiring percentage gives 100% − 68.5% = 31.50%.
- (a) 60 — Method: because the counter goes back each time, every draw is the same experiment, so the expected number of reds is the number of draws multiplied by P(red). Working: there are 8 red counters out of 20, so P(red) = 8 ÷ 20 = 0.4. Over 150 draws the expected number of reds is 150 × 0.4 = 60. Answer: about 60 red counters would be expected. The distractors: 90 uses P(blue) by mistake, 150 × 12 ÷ 20 = 90; 100 comes from writing the probability from the red to blue ratio of 8 to 12, giving 150 × 8 ÷ 12 = 100; 75 comes from treating red and blue as equally likely because there are two colours, which gives 150 ÷ 2 = 75.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (b) likely — On the probability scale, 'certain' is reserved for a probability of exactly 1, and 'evens' describes a probability of exactly 0.5. A probability of 0.9 is high but not equal to 1, so the correct word is 'likely'. Choosing 'certain' treats a probability close to 1 as if it were exactly 1, which it is not. Choosing 'evens' misjudges 0.9 as being close to the midpoint of the scale, when it is close to the 'certain' end instead. Choosing 'unlikely' reads the scale the wrong way round, as if a high probability meant a low chance of happening.
Build your own mix at the worksheet builder.