Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (d) No, because 3/8 + 5/12 + 1/6 = 23/24 — Using a common denominator of 24: 3/8 = 9/24, 5/12 = 10/24 and 1/6 = 4/24. Adding these numerators gives 9 + 10 + 4 = 23, so the three probabilities sum to 23/24, which is less than 1 — Zara is not correct. Adding the original numerators (3 + 5 + 1 = 9) over a denominator of 12 instead of converting each fraction properly gives 9/12 = 3/4, still less than 1 but the wrong fraction. Converting 1/6 to 5/24 instead of 4/24 (using the wrong scaling) makes the total 9/24 + 10/24 + 5/24 = 24/24 = 1, wrongly suggesting the probabilities are valid. Judging validity from the fact that each individual fraction lies between 0 and 1 ignores that an exhaustive set must sum to exactly 1, not merely contain valid individual values.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (a) £150 — Each game, the expected payout is 0.1 × £20 = £2, so the fête's expected profit per game is the £3 charged minus the £2 expected payout, £1. Over 150 games, that is 150 × £1 = £150. Writing £300 is wrong because 150 × £2 = £300 is the total expected PAYOUT, not the profit — it has not been subtracted from the entry fees. Writing £450 is wrong because 150 × £3 = £450 is the total money taken in entry fees, without accounting for what is expected to be paid out in prizes. Writing £1 is wrong because that is only the expected profit for ONE game — it has not been scaled up to all 150 games. The fête's expected profit is £150.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (c) 170 — 68% of the 250 packets germinated: 250 × 0.68 = 170. Using the complement, the 32% that did NOT germinate, gives 250 × 0.32 = 80. Shifting the decimal point, using 0.068 instead of 0.68, gives 250 × 0.068 = 17. Rounding 68% up to 70% before multiplying gives 250 × 0.70 = 175.
- (d) 140 — 90 pupils were in Year 8 on the coach branch. The minibus branch has 200 − 150 = 50 pupils, and all of them are Year 8 too, so the total number of Year 8 pupils is 90 + 50 = 140. Writing 90 alone is wrong because it only counts the coach's Year 8 pupils and misses the minibus ones. Writing 60 is wrong because that is the number of Year 9 pupils on the coach (150 − 90 = 60), not Year 8 at all. Writing 50 alone is wrong because it only counts the minibus pupils and misses the coach's Year 8 pupils. The total is 140.
- (a) Game B, by £8 — Game A's expected total is 40 × 0.2 × £5 = £40. Game B's expected total is 40 × 0.1 × £12 = £48. Game B is higher, by £48 − £40 = £8. Writing 'Game A, by £8' is wrong because it has the right difference but the wrong game — Game A's total (£40) is actually LOWER than Game B's, not higher. Writing 'Game B, by £48' is wrong because £48 is Game B's whole expected total, not the DIFFERENCE between the two games. Writing 'Game A, by £40' is wrong in the same way, using Game A's whole total as if it were the margin, and naming the wrong game as the winner. Game B gives the higher expected total, by £8.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (b) The relative frequency is settling near 0.5 — Method: turn each result into a relative frequency before comparing them, because it is the relative frequency, and not the difference between the two counts, that tends towards the theoretical probability. Working: after 10 flips the relative frequency of a head is 7 ÷ 10 = 0.7, which is a long way from 0.5. After 1000 flips it is 528 ÷ 1000 = 0.528, which is much closer to 0.5. Meanwhile the gap between the two counts has grown rather than shrunk: it was 7 − 3 = 4 after 10 flips and is 528 − 472 = 56 after 1000 flips. Answer: the relative frequency is settling near 0.5, which is what an unbiased experiment does as the sample grows. The distractors: saying the counts are levelling out is the usual form of this idea and the figures contradict it, since the gap went from 4 to 56; saying the coin is biased treats 28 extra heads in 1000 flips as proof, when 0.528 sits close to 0.5 and a fair coin gives results like this often; saying the next flip is more likely to be a tail is the gambler's fallacy, since each flip stays at 1/2 whatever came before.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (b) 3/10 — The number who use at least one app is 90 − 20 = 70. Since 55 + 42 double-counts the overlap, n(X ∩ Y) = 55 + 42 − 70 = 27, so P(both) = 27/90 = 3/10. Forgetting to subtract the 20 who use neither, and using the full 90 as the union, gives 55 + 42 − 90 = 7, so 7/90. Reporting the probability of using X or Y (or both), 70/90 = 7/9, answers a different question about the union, not the overlap. Reporting the probability of using neither app, 20/90 = 2/9, is the complement of the union, not the intersection.
- (b) 40 — n(P ∪ Q) = n(P) + n(Q) − n(P ∩ Q) = 34 + 27 − 11 = 50. The complement is everyone outside both sets: n((P ∪ Q)′) = 90 − 50 = 40. Adding P and Q without subtracting the overlap gives 34 + 27 = 61, so 90 − 61 = 29 double-subtracts the 11 who are in both. Reporting n(P ∪ Q) itself, 50, forgets to take the complement at all. Subtracting only n(P) from the universal set, 90 − 34 = 56, ignores set Q altogether.
- (c) 0.5 — Method: count the favourable outcomes, write them over the total number of equally likely outcomes and then divide to turn the fraction into a decimal. Working: the odd scores are 1, 3 and 5, which is 3 of the 6 equally likely scores, so the probability is 3/6, and 3 ÷ 6 = 0.5. Answer: 0.5, the middle of the 0 to 1 probability scale. The distractors: 0.33 comes from listing only 3 and 5 as odd and working out 2 ÷ 6; 0.17 comes from giving the probability of one particular odd score, 1 ÷ 6; 0.3 comes from writing '3 out of 6' as 0.3, reading the 3 straight off as tenths instead of dividing.
- (c) 102 — Method: turn the past record into a relative frequency, then use it as an estimate of the probability of rain and multiply by the number of days being predicted for. Working: relative frequency of rain = 70 ÷ 250 = 0.28. Expected rainy days in 365 days = 365 × 0.28 = 102.2, which rounds to about 102 days. Answer: about 102 days. Watch out: writing down 48 swaps which number is the sample and which is the target, working out 70 ÷ 365 × 250 instead of 70 ÷ 250 × 365. Writing down 70 just repeats the original count of rainy days without scaling it up to the new, longer period at all. And writing down 110 comes from rounding the relative frequency to 0.3 before multiplying, 365 × 0.3 = 109.5, when 70 ÷ 250 is exactly 0.28 and needs no rounding at all.
Build your own mix at the worksheet builder.